Você está na página 1de 52
PoE TRAINING MANUAL- PIPING DOC No. : 28040-P/-UPS-1003 PIPING STUDY Rev, :R0 ‘Uhde India Limited COLUMN PIPING Page 1 CONTENTS Page 00 Cover Sheet 1 List of drawings 2-8 1.0 Introduetion 4 20 Distillation 4-6 3.0 Required Information 6-7 40 Sequence of column Piping Study 7-9 5.0 Nozzle Orientation and Level 9-10 60 Access and Maintenance Faciity 10 7.0 Platforms and Ladders " ‘Applicable Revision Propared: Checke ‘Approved: Date: Date: Date: First Edfion: RO Prepared: AKB Checked: TNE ‘Approved: RUD Date: Date: Date: File Name: LBT003 Server: PUNE: KUMUS 207 VKO: KUMUS 205 TRAINING MANUAL- PIPING DOC No. : 29040:P-UPS-1008 CoE PIPING STUDY Rev, :R0 Uhde India Limited COLUMN PIPING Page :2 LIST OF ILLUSTRATIONS: [SR.NO. [DWG.NO. DESCRIPTION 7 \crr SCHEMATIC - PROCESS OF DISTILLATION TOWER 2 fouP2 [CRUDE DISTILLATION OF _ PRODUCTS ACROSS] TEMPERATURE RANGE 3 (curs FLOW DIAGRAM OF ABSORPTION-STRIPPING SYSTEM] FOR HYDROCARBON RECOVERY FROM GASEOUS| IMIXTURE: 4 |euPa [SCHEMATIC PROCESS OF FRACTIONATION TOWER 5 (CPS 7ACUUM TOWER & STRIPPER 6 [cLPs TRAYED TOWER 7 [oLP7 PACKED TOWER 3 (cups COUNTER FLOW (SIEVE & VALVE PLATE DISPERSORS) a [LPs [CROSS FLOW - TRAY DETAILS 10 [cLPIO [TRAY TYPES BY LIQUID PATHS TT [cLP it PROCESS FLOW DIAGRAM IN TOWER AREA 12 |OLPI2 SAMPLE PIPING AND INSTRUMENTATION DIAGRAM |AROUND A COLUMN 13 |OLPis EVALUATION OF THE FLOW DIAGRAM FOR Al IDISTILATION COLUMN TO VISUALISE AN ORDERLY| |ARRANGEMENT OF PIPING. 14 |OLPia [TYPICAL PIPIERACK CROSS-SECTION OF A TOWER] AREA 5 |CLPis TYPICAL NOZZLE LOCATION AND PLATFORM ELEVATIONS 16 |cLPis PLATFORM WIDTH REQUIREMENTS 17 |cuPi7 YPICAL PLATFORM ORIENTATION 8 |ciPia DETAILS OF CIRCULAR PLATFORM BRACKET SPACINGS] 13 |cLPis WER PLATFORM AND LADDER ELEVATION REQUIREMENTS 20 [CLP20 |TYPICAL PLATFORM ARRANGEMENT ai [cLPat DETAILS OF A TYPICAL DISTILLATION COLUMN 22 |[cLP22 DETAILS OF TOWER SKIRT 23 [cLPas YPICAL__TOWER AREA DIVISION FOR VARIOUS FACILITIES. 2a |CLPaa 'YPIGAL TOWER PIPING SUPPORT 25 [CLP25 TYPICAL ARRANGEMENT OF EXTERNAL PIPING AROUND] COLUMN, 26 [CLP26 TYPICAL RELIEF VALVE SYSTEM OPEN AND CLOSED] SYSTEM, 27 |CLPa7 PIPING G.A. FOR COLUMN REBOILER PUNIP 28 [CLP28 INOTES FOR PIPING G.A. FOR COLUMN REBOILER PUMP TRAINING MANUAL- PIPING DOC No. : 29040:P-UPS-1008 Core PIPING STUDY Rev, Ro Uhde India Limited COLUMN PIPING Page 3 [SR.NO. [DWG.NO. DESCRIPTION 29 (cLP2s TYPICAL OPERATOR ACCESS 30 (CLP30 INET POSITIVE SUCTION HEAD (NPSH) OF BOTTOMS| PUMP a1 (CLP3t TYPICAL TOWER PIPING ARRANGEMENT 32 (CLP32 [TYPICAL PLAN AND ELEVATION VIEW OF TOWER AREA 33_~(CLP33 IREBOILER CONNECTION 34 (CLP34 |ARRANGEMENT FOR KETTLE REBOILERS 35 (CLP35 [TYPICAL INSTRUMENT VESSEL 36 (CLP36 TYPICAL ARRANGEMENT FOR LEVEL INSTRUMENT 37_(CLP37 TYPICAL TEMPERATURE AND PRESSURE INSTRUMENT] INOZZLE LOCATION 38 (CLP3B TYPICAL TEMPERATURE AND PRESSURE INSTRUMENT] |ARRANGEMENTS 39_(CLP3S TYPICAL COMMON BRIDLE-LEVEL _ INSTRUMENT] [ARRANGEMENT 40 |CLPa0 TYPICAL TOWER DAVIT ARRANGEMENT a (clPat TYPICAL TOWER TROLLEY BEAM ARRANGEMENT

Você também pode gostar