Você está na página 1de 2

MEMORIAL DE CÁLCULO

29°
Ka = Tg 2 (45° − ) = 0,347
2

Kac - √𝐾𝑎 = 0 → Kac =√0,347 = 0,589


2𝑐 2×6
Z0 = = = 1,16 m
Υ × √𝐾𝑎 17,5×0,589

Υ × ℎ2 × 𝐾𝑎 17,5 × 52 × 0,347
Ea𝑠𝑜𝑙𝑜 = – (2c × Kac × h) = – (2 × 6 × 0,589 × 5)
2 2
Ea𝑠𝑜𝑙𝑜 = 40,57kN/m
(5−1,16)
hEa𝑠𝑜𝑙𝑜 = = 1,28m
3
MEa𝑠𝑜𝑙𝑜 = 40,57 × 1,28 = 51,93kNm/m

Eacarr. = 0,347× 20 × 5 = 34,7kN/m


5
hEa𝑐𝑎𝑟𝑟. = = 2,5m
2
MEa𝑐𝑎𝑟𝑟. = 34,7 × 2,5 = 86,75kN ∗ m/m

W1= 0,1b × 5× 23,5 = 11,75b kN/m


0,1𝑏
MW1 = (0,2b + 2 )11,75b = 2,94b2 kN ∗ m/m
W2 = b × 0,2 × 23,5 = 4,7b kN/m
𝑏
MW2 = 2 ×4,7b = 2,35b2 kN ∗ m/m

W3 = 5 × 0,7b × 17,5 = 61,25b kN/m


0,7𝑏
MW3 = (0,2b + 0,1b + 2 ) × 61,25b = 39,81b2 kN ∗ m/m

𝛴Mv= 2,94b2 + 2,35b2 + 39,81b2 = 45,1b2 kN ∗ m/m


𝛴Fv= 11,75b + 4,7b +61,25b = 77,7b kN/m
𝛴Mh= 51,93 + 86,75 = 138,68kN ∗ m/m
𝛴Fh= 40,57 + 34,7 = 75,27kN/m
CS tombamento
ΣMv
˃ FS
ΣMh
45,1b2
˃ 1,2 → b > ±1,92m
138,68

CS deslizamento
ΣFv × Tg(27°)
˃ FS
ΣFh
77,7𝑏 × 0,5095
˃ 1,2 → b > 2,28m
75,27

Excentricidade
b ΣMv – ΣMh b 45,1b2 –138,68 1,78
d= –( )= 2 –( ) = −0,08b +
2 ΣRv 77,7𝑏 b

ΣFv −0,08b + 1,78


p= × [1 ± 6 × ( b
)] → p’ e p’’
b b

77,7b −0,08b + 1,78 829,84


p’ = × [1 + 6 × ( b
b
)] = 40,4 + > 0 → b ≠ 0m
b b2

77,7b −0,08b + 1,78 829,84


p’’ = × [1 − 6 × ( b
)] = 115 – 2 > 0 → b > 2,69m ou b < -2.69m
b b b
b 1,78 b 10,68
d< → −0,08b + < → −0,48b + < b → b > √7,22 → b > ±2.69m
6 b 6 b

O menor valor de b que atende a todos os testes e 2,7m.

VOLUME DE CONCRETO POR METRO DE MURO

5 × 0,3 = 1,5m3 /m

0,2 × 2,7 = 0,54m3 /m


Vconc. = 1,5 + 0,54 = 2,04m3 /m
CUSTO DE EXECUÇAO DA CONCRETAGEM
Cconc. = 2,04 × 500 = 1020 R$/m
VOLUME DE ATERRO

0,25 × 0,55 = 0,138m3 /m

5× 0,7 × 2,7 = 9,45m3 /m


Vater. = 9,45 + 0,138 = 9,59m3 /m
CUSTO DO ATERRO
Cater. = 9,59 × 25 = 239,75 R$/m
CUSTO TOTAL
Ctot. = 1020 + 239,75 = 1259,75 R$/m