The time sheet summarizes work performed from October 1-11, 2018 on the 220/66kV SAS testing and commissioning project at the GETCO substation in Bachunda. It details the bay numbers tested each date, including metering, synchronizing checks, relay signal testing, remote operations testing with interlocks and SCADA inputs, and auto recloser testing witnessed by engineers. The engineer and customer representative signed off on the work performed from October 1-10, 2018.
The time sheet summarizes work performed from October 1-11, 2018 on the 220/66kV SAS testing and commissioning project at the GETCO substation in Bachunda. It details the bay numbers tested each date, including metering, synchronizing checks, relay signal testing, remote operations testing with interlocks and SCADA inputs, and auto recloser testing witnessed by engineers. The engineer and customer representative signed off on the work performed from October 1-10, 2018.
The time sheet summarizes work performed from October 1-11, 2018 on the 220/66kV SAS testing and commissioning project at the GETCO substation in Bachunda. It details the bay numbers tested each date, including metering, synchronizing checks, relay signal testing, remote operations testing with interlocks and SCADA inputs, and auto recloser testing witnessed by engineers. The engineer and customer representative signed off on the work performed from October 1-10, 2018.
CUSTOMER : STERLING AND WILSON SITE : 220/66KV S/S GETCO, BACHUNDA ENGINEER ‘S NAME: SRIKANTH MONTH : OCTOBER YEAR : 2018 JOB UNDERTAKEN : 220/66KV SAS TESTING AND COMMISSIONING
DATE WORKING TIME OVERTIME Bay No Activity Performed
FROM TO HOU FROM TO HOURS RS 01/10/2018 09:00am 06:00 HOLIDAY 02/10/2018 BAY-206, B612 METERING AND SYNCHRO CHECK WITH VT SELECTION LOGIC AND 21M1 RELAY SINGAL TESTING AND ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS 03/10/2018 BAY-206,B611 ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS AND 21M2 SIGNALS TESTING 04/10/2018 BAY-205,B610 ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS AND METERING AND SYNCH CHECK WITH CVT SELECTION LOGIC AND 21M1 RELAY SIGNAL TESTING 05/10/2018 BAY-205,B609 ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS AND 21M2 RELAY SIGNAL TESTING 06/10/2018 BAY-206 AUTO RECLOSER TESTED WITH WITNESS FROM 21M1 AND 21M2 RELAY 07/10/2018 SUNDAY 08/10/2018 B-608,B607 ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS 09/10/2018 B606,B205 ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS AND 21M1 AUTO RECLOSER 10/10/2018 BAY-B605,B604 ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS AND 21M2 AUTO RECLOSER 11/10/2018 BAY-601 ALL REMOTE OPERATIONS WITH INTERLOCKS AND BCU INPUT SIGNALS TESTED FROM SCADA IN THE PRESENSE OF WITNESS SIGNATURE DATE: 20/06/18 SIGNATURE DATE: 02/10/18
ENGINEER ‘S NAME:Mr. SRIKANTH CUSTOMER ‘S REP NAME : Mr. SHAILESH PATEL