PT Sorik Merapi Geothermal Power

Powerchina Huadong Engineering Corporation Limited


PT Connusa Energindo

SORIK MARAPI GEOTHERMAL PROJECT


INSM-SMGP-001-DR-0

Calculation Cut and Fill Area

(m) Cut Fill


phas Volumn
e Area No. Area (m2) Level Deviation Volumn (m3) (m3)
535
1 1 552.778 5 2,763.89
530
2 4233.2
530
2 1+2 4785.978 5 23,929.89
525
1+2 4785.978 5 23,929.89
520

525
3 6150.49 5 30752.45
520
81,376.12

Tentative
500
8 Pashe Indicated use
227 -5 -1135.00
(1) Sloping
505
at the edge of the area
505
7 Pashe
737.11 -5 -3685.55
(1)
510

505
8 Pashe
56.75 -5 -283.75 sloping
(2)
510
at the edge of the area
510
7 Pashe Sloping
368.56 -10 -3685.55
(2) at the edge of the area
520

510
6- R 736 -10 -7360.00 sloping 6r
520
at the edge of the area
510
3,174.52
6- L -10 -31745.18 sloping 6l
520
at the edge of the area
515
5-R 2,397.76 -5 -11988.81 sloping 5r
520
at the edge of the area
515
5- L 4,298.59 -5 -21492.94 sloping 5l
520
at the edge of the area
81,376.12 -81,376.78
Cut Fill

Note :
From the calculation of balance between excavation and back fill area, then the level tentative in SMGP's
Substation is at level +/- 05.20 m
0