ORACLE® BUSINESS INTELLIGENCE APPLICATIONS

11.1.1.10.1 PROJECT ANALYTICS


METRIC REFERENCE GUIDE

VERSION 1.2

October 2015
Disclaimer

This document is provided for information purposes only, and the contents hereof are subject to change without
notice. This document is not warranted to be error-free, nor is it subject to any other warranties or conditions,
whether expressed orally or implied in law, including implied warranties and conditions of merchantability or
fitness for a particular purpose.
We specifically disclaim any liability with respect to this document, and no contractual obligations are formed
either directly or indirectly by this document. This document may not be reproduced or transmitted in any form or
by any means, electronic or mechanical, for any purpose, without our prior written permission.

Copyright 2015, Oracle®. All Rights Reserved.


Contents
Chapter 1. Introduction

Chapter 2. Project Analytics


2.1 Project - Billing ..................................................................................................................... 2-1
2.2 Project - Budget ................................................................................................................... 2-6
2.3 Project – Commitments ..................................................................................................... 2-19
2.4 Project – Cost .................................................................................................................... 2-21
2.5 Project - Cost GL Reconciliation........................................................................................ 2-30
2.6 Project - Cross Charge ...................................................................................................... 2-32
2.7 Project – Forecast ............................................................................................................. 2-57
2.8 Project – Funding .............................................................................................................. 2-64
2.9 Project – Grants Management –Award Analysis ............................................................... 2-76
2.10 Project – Grants Management –Award Funding ............................................................. 2-76
2.11 Project – Performance ..................................................................................................... 2-81
2.12 Project - Resource Management ................................................................................... 2-113
2.13 Project – Revenue ......................................................................................................... 2-120
2.14 Project - Revenue GL Reconciliation ............................................................................ 2-124
2.15 Project – Earned Value Management ........................................................................... 2-126
2.16 Project – Construction in Progress ................................................................................ 2-128

Metric Reference Guide  iii


Introduction 1

This document describes metrics available in the Project Analytics in Release 11.1.1.10.1 of Oracle® Business
Intelligence Applications. These metrics are exposed in the Presentation Layer of the Oracle® Business
Intelligence Applications repository. They are used in the pre-built analyses, and / or are available for customers
to use via Oracle® Answers in building new analyses or extending existing analyses. Oracle® Answers is the ad-
hoc query and reporting tool used for building and modifying analyses.

Metric Reference Guide  1-1


Project Analytics 2

2.1 Project - Billing

No Metric Name Description

1.1 # of Accepted Invoices Count of invoices with status = "ACCEPTED"

1.2 # of Approved Invoices Number of invoices with a status of 'Released',


‘Approved’, Transferred', or 'Accepted'.

1.3 # of Projects Number of distinct projects that have been included on


invoices.
1.4 # of Tasks Number of distinct tasks that have been included on
invoices.
1.5 # of Unapproved Invoices Number of invoices with status equal to "CREATED"

1.6 # of Write-off Invoices Number of invoices created to write-off a portion of an


existing invoice.

1.7 Accepted Invoice Amount Amount of invoices with status = "ACCEPTED"

1.8 Approved Invoice Amount Total amount of approved invoices.

1.9 Current Withheld Amount Part of the original invoice which has been retained as
part of the customer agreement.

1.10 External Invoice Amount Total amount of the invoices billed to external
customers.
1.11 Intercompany Invoice Amount Total amount of the invoices billed to intercompany
contracts.
1.12 Interproject Invoice Amount Total amount of the invoices billed on interproject
contracts.
1.13 Invoice Amount Total amount of all invoices.
1.14 Invoice Write-off Amount Total amount of write-off invoices.

Metric Reference Guide  2-1


Project Analytics

No Metric Name Description

1.15 Retention Billed Amount that has been retained and billed as part of a
customer agreement.

1.16 Retention Write-off Depreciated Billed Retention Amount.

1.17 Total Retained Amount Part of the original invoice which has been retained
according to the customer agreement and not billed
yet. Invoice retention is used to reduce a project
invoice by a percentage amount that you specify for a
particular project. It applies to both expendit...

1.18 Unapproved Invoice Amount Total amount of unapproved invoices.

1.19 Unbilled Receivables Value of work done which has not been billed yet

1.20 Unearned Revenue Value of revenue recognized for which the work has
not been performed yet.

1.21 Contract Amount Total amount on project based contract lines.

1.22 Contract Amount - ITD Inception to date amount on project based contract
lines.

1.23 Contract Amount - MTD Month to date amount on project based contract lines.

1.24 Contract Amount - QTD Quarter to date amount on project based contract
lines.

Metric Reference Guide  2-2


Project Analytics

No Metric Name Description

1.25 Contract Amount - YTD Year to date amount on project based contract lines.

1.26 # of Projects - ITD Number of distinct projects that have been included on
invoices.

1.27 # of Tasks - ITD Number of distinct tasks with an Invoice Distribution


Line since the Project inception

1.28 Accepted Invoice Amount - ITD Amount of accepted invoices - ITD

1.29 Approved Invoice Amount - ITD Inception to date amount of approved invoices.

1.30 Current Withheld Amount - ITD Inception to Date amount retained from the original
invoice, as part of a customer agreement.

1.31 External Invoice Amount - ITD Inception to date amount of invoices billed to external
customers.

1.32 Intercompany Invoice Amount - ITD Inception to date amount of invoices billed to
intercompany contracts.

1.33 Interproject Invoice Amount - ITD Inception to date amount of invoices billed on
interproject contracts.

1.34 Invoice Amount - ITD Inception to date total invoice amount.

1.35 Invoice Write-off Amount - ITD Inception to date amount of write-off invoices.

1.36 Retention Billed - ITD Inception to Date amount that has been retained and
billed as part of a customer agreement.

1.37 Retention Write-off - ITD Inception to Date of Depreciated Billed Retention


Amount.

Metric Reference Guide  2-3


Project Analytics

No Metric Name Description

1.38 Total Retained Amount - ITD Inception to Date value retained from the original
invoice according to the customer agreement and not
billed yet.

1.39 Unapproved Invoice Amount - ITD Inception to date amount of unapproved invoices.

1.40 Unbilled Receivables - ITD Inception to Date value of work done which has not
been billed yet

1.41 Unearned Revenue - ITD Inception to Date value of revenue recognized for
which the work has not been performed yet.

1.42 Accepted Invoice Amount - MTD Amount of accepted invoices - MTD

1.43 Approved Invoice Amount - MTD Inception to date amount of approved invoices.

1.44 Current Withheld Amount - MTD Month to Date amount retained from the original
invoice, as part of a customer agreement.

1.45 External Invoice Amount - MTD Month to date amount of invoices billed to external
customers.
1.46 Intercompany Invoice Amount - Month to date amount of invoices billed to
MTD intercompany contracts.
1.47 Interproject Invoice Amount - MTD Month to date amount of invoices billed on interproject
contracts.
1.48 Invoice Amount - MTD Month to date total invoice amount.

1.49 Invoice Write-off Amount - MTD Month to date amount of write-off invoices.

1.50 Retention Billed - MTD Month to Date amount that has been retained and
billed as part of a customer agreement.

1.51 Retention Write-off - MTD Month to Date value of Depreciated Billed Retention
Amount.

1.52 Total Retained Amount - MTD Month to Date value retained from the original invoice
according to the customer agreement and not billed
yet.

1.53 Unapproved Invoice Amount - MTD Month to date amount of unapproved invoices.

1.54 Unbilled Receivables - MTD Month to Date value of work done which has not been
billed yet
1.55 Unearned Revenue - MTD Month to Date value of revenue recognized for which
the work has not been performed yet.

Metric Reference Guide  2-4


Project Analytics

No Metric Name Description

1.56 Accepted Invoice Amount - QTD Amount of accepted invoices - QTD

1.57 Approved Invoice Amount - QTD Quarter to date amount of approved invoices.

1.58 Current Withheld Amount - QTD Quarter to Date amount retained from the original
invoice, as part of a customer agreement.

1.59 External Invoice Amount - QTD Quarter to date amount of invoices billed to external
customers.
1.60 Intercompany Invoice Amount - Quarter to date amount of invoices billed to
QTD intercompany contracts.
1.61 Interproject Invoice Amount - QTD Quarter to date amount of invoices billed on
interproject contracts.
1.62 Invoice Amount - QTD Quarter to date total invoice amount.

1.63 Invoice Write-off Amount - QTD Quarter to date amount of write-off invoices.

1.64 Retention Billed - QTD Quarter to Date amount that has been retained and
billed as part of a customer agreement.

1.65 Retention Write-off - QTD Quarter to Date value of Depreciated Billed Retention
Amount.

1.66 Total Retained Amount - QTD Quarter to Date value retained from the original
invoice according to the customer agreement and not
billed yet.

1.67 Unapproved Invoice Amount - QTD Quarter to date amount of unapproved invoices.

1.68 Unbilled Receivables - QTD Quarter to Date value of work done which has not
been billed yet

1.69 Unearned Revenue - QTD Quarter to Date value of revenue recognized for which
the work has not been performed yet.

1.70 Accepted Invoice Amount - YTD Amount of accepted invoices - YTD

1.71 Approved Invoice Amount - YTD Year to date amount of approved invoices.

1.72 Current Withheld Amount - YTD Year to Date amount retained from the original invoice,
as part of a customer agreement.

1.73 External Invoice Amount - YTD Year to date amount of invoices billed to external
customers.
1.74 Intercompany Invoice Amount - YTD Year to date amount of invoices billed to intercompany
contracts.

Metric Reference Guide  2-5


Project Analytics

No Metric Name Description

1.75 Interproject Invoice Amount - YTD Year to date amount of invoices billed on interproject
contracts.
1.76 Invoice Amount - YTD Year to date total invoice amount.
1.77 Invoice Write-off Amount - YTD Year to date amount of write-off invoices.

1.78 Retention Billed - YTD Year to Date amount that has been retained and billed
as part of a customer agreement.

1.79 Retention Write-off - YTD Year to Date value of Depreciated Billed Retention
Amount.
1.80 Total Retained Amount - YTD Year to Date value retained from the original invoice
according to the customer agreement and not billed
yet.

1.81 Unapproved Invoice Amount - YTD Year to date amount of unapproved invoices.

1.82 Unbilled Receivables - YTD Year to Date value of work done which has not been
billed yet
1.83 Unearned Revenue - YTD Year to Date value of revenue recognized for which
the work has not been performed yet.

2.2 Project - Budget


No Metric Name Description

2.1 BAC Burdened Cost Budget at completion cost amount

2.2 BAC Current Budget Cost Budget at completion cost for the current
budget version.

2.3 BAC Current Budget Raw Cost Budget at completion raw cost for the current
budget version.

Metric Reference Guide  2-6


Project Analytics

2.4 BAC Current Budget Revenue Total planned revenue at completion for the
current baseline budget in user-preferred
currency for the approved revenue budget
financial plan type.

2.5 BAC Original Budget Cost Budget at completion cost for the original
budget version.

2.6 BAC Original Budget Raw Cost Budget at completion raw cost of the original
budget version.

2.7 BAC Original Budget Revenue Total planned revenue at completion for the
original baseline budget in user-preferred
currency for the approved revenue budget
financial plan type.

2.8 BAC Raw Cost Budget at completion raw cost.


2.9 BAC Revenue Budget at Completion revenue amount

2.10 # of Projects Number of distinct projects with budgets.

2.11 Current Budget Billable Cost Amount of billable cost in the current version of
the budget.

2.12 Current Budget Capitalizable Cost Inception to date amount of billable cost in the
current version of the budget.

2.13 Current Budget Cost Cost amount in the current version of the
budget

2.14 Current Budget Equipment Cost Amount of equipment cost in the current
version of the budget.

Metric Reference Guide  2-7


Project Analytics

2.15 Current Budget Labor Cost Amount of labor cost in the current version of
the budget.

2.16 Current Budget Labor Effort Units of labor cost in the current version of the
budget.
2.17 Current Budget Margin Difference between the revenue and the costs
in the current budget

2.18 Current Budget Margin Percentage Difference between the revenue and the costs
divided by revenue in the current budget

2.19 Current Budget Revenue Revenue budget amount in the current version
of the budget.
2.20 Original Budget Billable Cost Amount of billable cost in the current version of
the budget.

2.21 Original Budget Capitalizable Cost Amount of capitalizable cost in the original
version of the budget.

2.22 Original Budget Cost Cost amount in the original version of the
budget.

2.23 Original Budget Equipment Cost Cost of equipment in the original version of the
budget.

2.24 Original Budget Labor Cost Amount of labor cost in the original version of
the budget.

2.25 Original Budget Labor Effort Units of labor in the original version of the
budget
2.26 Original Budget Margin Difference between revenue and cost in the
original version of the budget

Metric Reference Guide  2-8


Project Analytics

2.27 Original Budget Margin Percentage Difference between the revenue and the costs
divided by revenue in the original budget

2.28 Original Budget Revenue Revenue amount in the original version of the
budget.

2.29 Current Budget Billable Cost Amount of billable cost in the current version of
the budget.

2.30 Current Budget Capitalizable Cost Inception to date amount of billable cost in the
current version of the budget.

2.31 Current Budget Cost Cost amount in the current version of the
budget

2.32 Current Budget Equipment Cost Amount of equipment cost in the current
version of the budget.

2.33 Current Budget Labor Cost Amount of labor cost in the current version of
the budget.

2.34 Current Budget Labor Effort Units of labor cost in the current version of the
budget.
2.35 Current Budget Margin Difference between the revenue and the costs
in the current budget

2.36 Current Budget Margin Percentage Difference between the revenue and the costs
divided by revenue in the current budget

2.37 Current Budget Revenue Revenue budget amount in the current version
of the budget.

Metric Reference Guide  2-9


Project Analytics

2.38 Original Budget Billable Cost Amount of billable cost in the current version of
the budget.

2.39 Original Budget Capitalizable Cost Amount of capitalizable cost in the original
version of the budget.

2.40 Original Budget Cost Cost amount in the original version of the
budget.

2.41 Original Budget Equipment Cost Cost of equipment in the original version of the
budget.

2.42 Original Budget Labor Cost Amount of labor cost in the original version of
the budget.

2.43 Original Budget Labor Effort Units of labor in the original version of the
budget
2.44 Original Budget Margin Difference between revenue and cost in the
original version of the budget

2.45 Original Budget Margin Percentage Difference between the revenue and the costs
divided by revenue in the original budget

2.46 Original Budget Revenue Revenue amount in the original version of the
budget.

2.47 # of Projects - ITD Number of distinct Projects with Budgets since


Project Inception

2.48 Current Budget Billable Equipment Cost Amount of billable cost in the current version of
ITD the budget.

Metric Reference Guide  2-10


Project Analytics

2.49 Current Budget Billable Equipment Effort Inception to date billable units of equipment
ITD included in the current version of the budget

2.50 Current Budget Billable Labor Cost ITD Inception to date amount of billable cost in the
current version of the budget.

2.51 Current Budget Billable Labor Effort ITD Inception to date billable units of labor
approved in the current version of the budget

2.52 Current Budget Cost - ITD Inception to date cost amount in the current
version of the budget

2.53 Current Budget Equipment Cost - ITD Inception to date amount of equipment cost in
the current version of the budget.

2.54 Current Budget Labor Cost - ITD Inception to date amount of labor cost in the
current version of the budget.

2.55 Current Budget Margin - ITD Inception to date difference between the
revenue and the costs in the current budget

2.56 Current Budget Margin Percent - ITD Inception to date difference between the
revenue and the costs divided by revenue in
the current budget

2.57 Current Budget Revenue - ITD Inception to date revenue amount in the current
version of the budget.

2.58 Original Budget Cost - ITD Inception to date cost amount in the original
version of the budget.

Metric Reference Guide  2-11


Project Analytics

2.59 Original Budget Equipment Cost - ITD Inception to date cost of equipment in the
original version of the budget.

2.60 Original Budget Labor Cost - ITD Inception to date amount of labor cost in the
original version of the budget.

2.61 Original Budget Margin - ITD Inception to date difference between revenue
and cost in the original version of the budget

2.62 Original Budget Margin Percent - ITD Inception to date difference between the
revenue and the costs divided by revenue in
the original budget

2.63 Original Budget Revenue - ITD Inception to date revenue amount in the
original version of the budget.

2.64 Current Budget Billable Equipment Cost - Amount of billable raw and burden costs
ITD related to equipment usage approved in the
current version of the budget since inception.
This total results from adding all chargeable
items from tasks denoted as billable

2.65 Current Budget Billable Equipment Effort - Units of equipment approved in the current
ITD version of the budget since inception. This total
results from adding all chargeable items from
tasks denoted as billable

2.66 Current Budget Billable Labor Cost - ITD Amount of billable raw and burden costs
related to people usage approved in the current
version of the budget since inception. This total
results from adding all chargeable items from
tasks denoted as billable

2.67 Current Budget Billable Labor Effort - ITD Units of labor approved in the current version
of the budget since inception. This total results
from adding all chargeable items from tasks
denoted as billable

Metric Reference Guide  2-12


Project Analytics

2.68 Current Budget Cost - ITD Inception to date cost amount in the current
version of the budget

2.69 Current Budget Equipment Cost - ITD Inception to date amount of equipment cost in
the current version of the budget.

2.70 Current Budget Labor Cost - ITD Inception to date amount of labor cost in the
current version of the budget.

2.71 Current Budget Margin - ITD Inception to date difference between the
revenue and the costs in the current budget

2.72 Current Budget Margin Percent - ITD Inception to date difference between the
revenue and the costs divided by revenue in
the current budget

2.73 Current Budget Revenue - ITD Inception to date revenue amount in the current
version of the budget.

2.74 Original Budget Cost - ITD Inception to date cost amount in the original
version of the budget.

2.75 Original Budget Equipment Cost - ITD Inception to date cost of equipment in the
original version of the budget.

2.76 Original Budget Labor Cost - ITD Inception to date amount of labor cost in the
original version of the budget.

2.77 Original Budget Margin - ITD Inception to date difference between revenue
and cost in the original version of the budget

2.78 Original Budget Margin Percent - ITD Inception to date difference between the
revenue and the costs divided by revenue in
the original budget

Metric Reference Guide  2-13


Project Analytics

2.79 Original Budget Revenue - ITD Inception to date revenue amount in the
original version of the budget.

2.80 Current Budget Cost - MTD Month to date amount of raw and burden cost
approved in the current version of the budget

2.81 Current Budget Margin - MTD Month to date difference between the revenue
and the costs in the current budget

2.82 Current Budget Margin Percent - MTD Month to date difference between the revenue
and the costs divided by revenue in the current
budget

2.83 Current Budget Revenue - MTD Month to date revenue budget amount
approved in the current version of the budget.

2.84 Original Budget Cost - MTD Month to date amount of raw and burden cost
in the original approved baseline version of the
budget

2.85 Original Budget Margin - MTD Month to date difference between revenue and
cost in the original version of the budget

2.86 Original Budget Margin Percent - MTD Month to date difference between the revenue
and the costs divided by revenue in the original
budget

2.87 Original Budget Revenue - MTD Month to date revenue amount in the original
baseline approved version of the budget.

2.88 Current Budget Cost - MTD Month to date amount of raw and burden cost
approved in the current version of the budget

2.89 Current Budget Margin - MTD Month to date difference between the revenue
and the costs in the current budget

Metric Reference Guide  2-14


Project Analytics

2.90 Current Budget Margin Percent - MTD Month to date difference between the revenue
and the costs divided by revenue in the current
budget

2.91 Current Budget Revenue - MTD Month to date revenue budget amount
approved in the current version of the budget.

2.92 Original Budget Cost - MTD Month to date amount of raw and burden cost
in the original approved baseline version of the
budget

2.93 Original Budget Margin - MTD Month to date difference between revenue and
cost in the original version of the budget

2.94 Original Budget Margin Percent - MTD Month to date difference between the revenue
and the costs divided by revenue in the original
budget

2.95 Original Budget Revenue - MTD Month to date revenue amount in the original
baseline approved version of the budget.

2.96 Current Budget Cost - QTD Quarter to date amount of raw and burden cost
approved in the current version of the budget

2.97 Current Budget Margin - QTD Quarter to date difference between the revenue
and the costs in the current budget

2.98 Current Budget Margin Percent - QTD Month to date difference between the revenue
and the costs divided by revenue in the current
budget

2.99 Current Budget Revenue - QTD Quarter to date revenue budget amount
approved in the current version of the budget.

Metric Reference Guide  2-15


Project Analytics

2.100 Original Budget Cost - QTD Quarter to date amount of raw and burden cost
in the original approved baseline version of the
budget

2.101 Original Budget Margin - QTD Quarter to date difference between revenue
and cost in the original version of the budget

2.102 Original Budget Margin Percent - QTD Month to date difference between the revenue
and the costs divided by revenue in the original
budget

2.103 Original Budget Revenue - QTD Quarter to date revenue amount in the original
baseline approved version of the budget.

2.104 Current Budget Cost - QTD Quarter to date amount of raw and burden cost
approved in the current version of the budget

2.105 Current Budget Margin - QTD Quarter to date difference between the revenue
and the costs in the current budget

2.106 Current Budget Margin Percent - QTD Month to date difference between the revenue
and the costs divided by revenue in the current
budget

2.107 Current Budget Revenue - QTD Quarter to date revenue budget amount
approved in the current version of the budget.

2.108 Original Budget Cost - QTD Quarter to date amount of raw and burden cost
in the original approved baseline version of the
budget

2.109 Original Budget Margin - QTD Quarter to date difference between revenue
and cost in the original version of the budget

Metric Reference Guide  2-16


Project Analytics

2.110 Original Budget Margin Percent - QTD Month to date difference between the revenue
and the costs divided by revenue in the original
budget

2.111 Original Budget Revenue - QTD Quarter to date revenue amount in the original
baseline approved version of the budget.

2.112 Current Budget Equipment Bill Rate Current Budget Equipment Revenue/ Current
Budget Equipment Effort

2.113 Current Budget Equipment Cost Rate Current Budget Equipment Cost/ Current
Budget Equipment Effort
2.114 Current Budget Labor Bill Rate Current Budget Labor Revenue / Current
Budget Labor Effort
2.115 Current Budget Labor Cost Rate Current Budget Labor Cost / Current Budget
Labor Effort
2.116 Original Budget Equipment Bill Rate Original Budget Equipment Revenue / Original
Budget Equipment Effort

2.117 Original Budget Equipment Cost Rate Original Budget Equipment Cost/ Original
Budget Equipment Effort
2.118 Original Budget Labor Bill Rate Original Budget Labor Revenue / Original
Budget Labor Effort
2.119 Original Budget Labor Cost Rate Original Budget Labor Cost / Original Budget
Labor Effort
2.120 Current Budget Cost - YTD Year to date amount of raw and burden cost
approved in the current version of the budget

2.121 Current Budget Margin - YTD Year to date difference between the revenue
and the costs in the current budget

2.122 Current Budget Margin Percent - YTD Quarter to date difference between the revenue
and the costs divided by revenue in the current
budget

2.123 Current Budget Revenue - YTD Year to date revenue budget amount approved
in the current version of the budget.

Metric Reference Guide  2-17


Project Analytics

2.124 Original Budget Cost - YTD Year to date amount of raw and burden cost in
the original approved baseline version of the
budget

2.125 Original Budget Margin - YTD Year to date difference between revenue and
cost in the original version of the budget

2.126 Original Budget Margin Percent - YTD Quarter to date difference between the revenue
and the costs divided by revenue in the original
budget

2.127 Original Budget Revenue - YTD Year to date revenue amount in the original
baseline approved version of the budget.

2.128 Current Budget Cost - YTD Year to date amount of raw and burden cost
approved in the current version of the budget

2.129 Current Budget Margin - YTD Year to date difference between the revenue
and the costs in the current budget

2.130 Current Budget Margin Percent - YTD Quarter to date difference between the revenue
and the costs divided by revenue in the current
budget

2.131 Current Budget Revenue - YTD Year to date revenue budget amount approved
in the current version of the budget.

2.132 Original Budget Cost - YTD Year to date amount of raw and burden cost in
the original approved baseline version of the
budget

2.133 Original Budget Margin - YTD Year to date difference between revenue and
cost in the original version of the budget

Metric Reference Guide  2-18


Project Analytics

2.134 Original Budget Margin Percent - YTD Quarter to date difference between the revenue
and the costs divided by revenue in the original
budget

2.135 Original Budget Revenue - YTD Year to date revenue amount in the original
baseline approved version of the budget.

2.3 Project – Commitments

No Metric Name Description

3.1 External Committed Cost Amount of external commitment transactions

3.2 External Committed Raw Cost Amount of raw cost of external commitment
transactions
3.3 Original Quantity Ordered Total number of units that have been ordered and
are committed
3.4 Purchase Order Committed Cost The outstanding balance of project related
purchase order distributions that have not been
matched to receipts or invoices, or canceled, after
applying burden.

3.5 Purchase Order Committed Raw Cost The outstanding balance of project related
purchase order distributions that have not been
matched to receipts or invoices, or canceled,
before applying burden.

3.6 Purchase Requisition Committed Cost The outstanding balance of project related
requisition distributions that have not been
converted to Purchase Orders or Canceled, after
applying burden.

3.7 Purchase Requisition Committed Raw The outstanding balance of project related
Cost requisition distributions that have not been
converted to purchase orders or canceled, before
applying burden.

3.8 Quantity Cancelled Total number of units committed that have been
cancelled

Metric Reference Guide  2-19


Project Analytics

3.9 Quantity Delivered Total number of units committed that have been
already delivered
3.10 Quantity Invoiced Total number of units committed that have been
already invoiced
3.11 Quantity Ordered Total number of units committed that have been
ordered
3.12 Quantity Outstanding Delivery Total number of units committed that have not
been delivered
3.13 Quantity Outstanding Invoice Total number of units committed that have not
been invoiced
3.14 Quantity Overbilled Total number of units committed that have been
overbilled
3.15 Supplier Invoice Committed Cost The outstanding burdened cost balance of project
related invoice distributions that have not been
passed to projects as an actual cost yet, either via
a receipt accrual or standard interface to projects,
after applying burden.

3.16 Supplier Invoice Committed Raw Cost The outstanding balance of project related invoice
distributions that have not been passed to
Projects as an actual cost yet, either via a receipt
accrual or standard interface to projects, before
applying burden.

3.17 Total Commitment Quantity Total number of units committed. For example,
hours of labor committed in a purchase order,
purchase requisition or supplier invoice

3.18 Total Committed Cost The sum of commitments from purchase


requisitions, purchase orders, supplier invoices,
and external commitments, including raw and
burden costs, in user-preferred currency. Raw
costs are directly attributable to work performed.
Burden costs are indirect costs such as overhead
allocations.

3.19 Total Committed Raw Cost The sum of raw cost commitments from purchase
requisitions, purchase orders, supplier invoices,
and external commitments in user-preferred
currency. Raw costs are directly attributable to
work performed.

Metric Reference Guide  2-20


Project Analytics

2.4 Project – Cost

No Metric Name Description

4.1 Cost MAGO Cost amount in the month previous to that


selected by the user

4.2 Cost QAGO Cost amount in the quarter previous to that


selected by the user

4.3 Cost YAGO Cost amount in the year previous to that


selected by the user
4.4 Equipment Cost MAGO Equipment cost amount in the month
previous to that selected by the user

4.5 Equipment Cost QAGO Equipment cost amount in the quarter


previous to that selected by the user

4.6 Equipment Cost YAGO Equipment cost amount in the year


previous to that selected by the user

4.7 Equipment Effort MAGO Total units (time or quantity) of equipment


used. Month ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

4.8 Equipment Effort QAGO Total units (time or quantity) of equipment


used. Quarter ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

4.9 Equipment Effort YAGO Total units (time or quantity) of equipment


used. Year ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

4.10 Labor Cost MAGO Labor cost amount in the month previous to
that selected by the user

4.11 Labor Cost QAGO Labor cost amount in the month previous to
that selected by the user

Metric Reference Guide  2-21


Project Analytics

4.12 Labor Cost YAGO Labor cost amount in the month previous to
that selected by the user

4.13 Labor Effort MAGO Units of labor used month ago. People
expenditure items result from multiplying
units by the corresponding usage rate

4.14 Labor Effort QAGO Units of labor used quarter ago. People
expenditure items result from multiplying
units by the corresponding usage rate

4.15 Labor Effort YAGO Units of labor used year ago. People
expenditure items result from multiplying
units by the corresponding usage rate

4.16 ----------------Quarter Ago Measures----------------


----
4.17 # of Cost Lines Not Transferred Count of cost lines with transfer status
equal to not transferred
4.18 # of Projects Number of distinct projects with expenditure
items
4.19 # of Tasks Number of distinct tasks that have been
included on invoices.
4.20 Billable and Capitalizable Burden Cost Burden cost of transactions that are both
billable and capitalizable
4.21 Billable and Capitalizable Cost Cost of transactions that are both billable
and capitalizable
4.22 Billable and Capitalizable Raw Cost Raw cost of transactions that are both
billable and capitalizable
4.23 Billable Cost Cost flagged as billable as they result from
transactions that are chargeable and tasks
denoted as billable.

4.24 Billable Labor Effort Billable units of labor used


4.25 Burden Cost Total of expenditure items not directly
attributed to work performed, such as fringe
benefits and office space.

4.26 Capitalizable Cost Raw and burden costs from asset building
projects. These costs are posted to the
asset's balance account and remain there
until the asset is in service

4.27 Capitalizable Net Billable Burden Cost The amount of capitalizable burden cost
that is not billable and cannot be recovered.

4.28 Capitalizable Net Billable Cost The amount of capitalizable cost that is not
billable and cannot be recovered.

Metric Reference Guide  2-22


Project Analytics

4.29 Capitalizable Net Billable Raw Cost The amount of capitalizable raw cost that is
not billable and cannot be recovered.

4.30 Cost Total raw plus burden cost

4.31 Cost - Cost Lines Not Transferred Amount value of cost lines with transfer
status equal to not transferred

4.32 Debit Cost Burdened cost amount debited to an


account
4.33 Equipment Cost Amount of cost related to the use of
equipment
4.34 Equipment Effort Total units (time or quantity) of equipment
used. Equipment expenditure items result
from multiplying units by the corresponding
usage rate

4.35 Expenses (Cost - Capitalizable Cost)

4.36 Labor Cost Amount of cost related to the use of labor

4.37 Labor Effort Units of labor used. People expenditure


items result from multiplying units by the
corresponding usage rate

4.38 Nonbillable Burden Cost Nonbillable burden cost transactions

4.39 Nonbillable Cost Raw and burden costs not flagged as


billable because the transactions are not
chargeable or the tasks where they were
performed are not denoted as billable.

4.40 Nonbillable Labor Effort Nonbillable units of labor used


4.41 Nonbillable Raw Cost Non billable direct cost transactions

4.42 Noncapitalizable Burden Cost Amount of noncapitalizable burden cost

4.43 Noncapitalizable Cost Cost amount of transactions that are of


noncapitalizable
4.44 Noncapitalizable Raw Cost Raw cost amount of transactions that are of
noncapitalizable
4.45 Posted Debit Cost Burdened cost amount debited to an
account and that has been already posted
to the General Ledger (GL Status = posted)

Metric Reference Guide  2-23


Project Analytics

4.46 Posted Raw Cost Raw cost amount debited to an account


and that has been already posted to the
General Ledger (GL Status = posted)

4.47 Quantity Number of units related to an expenditure


item

4.48 Raw Cost Direct cost, such as raw salaries and travel
expenses.
4.49 Unposted Debit Cost Burdened cost amount debited to an
account and that has not been posted to
the General Ledger (GL Status = unposted)

4.50 Unposted Raw Cost Raw cost amount debited to an account


and that has not been posted to the
General Ledger (GL Status = unposted)

4.51 # of Projects - ITD Number of distinct projects with expenditure


items since inception

4.52 # of Tasks - ITD Number of distinct tasks with an Invoice


Distribution Line since the Project inception

4.53 Billable and Capitalizable Burden Cost - ITD Inception to date burden cost of
transactions that are both billable and
capitalizable
4.54 Billable and Capitalizable Cost - ITD Inception to date cost of transactions that
are both billable and capitalizable

4.55 Billable and Capitalizable Raw Cost - ITD Inception to date raw cost of transactions
that are both billable and capitalizable

4.56 Billable Cost - ITD Inception to date cost amount of


transactions that are billable
4.57 Billable Labor Effort - ITD Inception to date billable units of labor used

4.58 Burden Cost - ITD Inception to date amount in burden cost


transactions

4.59 Capitalizable Cost - ITD Inception to date capitalizable cost

4.60 Capitalizable Net Billable Burden Cost - ITD Inception to date amount of capitalizable
burden cost that is not billable and cannot
be recovered.

Metric Reference Guide  2-24


Project Analytics

4.61 Capitalizable Net Billable Cost - ITD Inception to Date amount of capitalizable
cost that is not billable and cannot be
recovered.
4.62 Capitalizable Net Billable Raw Cost - ITD Inception to Date amount of capitalizable
raw cost that is not billable and cannot be
recovered.
4.63 Cost - ITD Inception to date cost amount

4.64 Equipment Cost - ITD Inception to date amount of cost related to


the use of equipment

4.65 Equipment Effort - ITD Inception to date units of equipment used

4.66 Expenses - ITD (Cost ITD - Capitalizable Cost ITD)

4.67 Labor Cost - ITD Inception to date amount of cost related to


the use of labor

4.68 Labor Effort - ITD Units of labor used. People expenditure


items result from multiplying units by the
corresponding usage rate

4.69 Nonbillable Burden Cost - ITD Inception to date nonbillable burden cost
transactions
4.70 Nonbillable Cost - ITD Inception to Date raw and burdened costs
not flagged as billable

4.71 Nonbillable Labor Effort - ITD Inception to date nonbillable units of labor
used
4.72 Nonbillable Raw Cost - ITD Inception to date nonbillable direct cost
transactions
4.73 Noncapitalizable Burden Cost - ITD Inception to date mount of noncapitalizable
burden cost
4.74 Noncapitalizable Cost - ITD Inception to date cost amount of
transactions that are of noncapitalizable

4.75 Noncapitalizable Raw Cost - ITD Inception to date raw cost amount of
transactions that are of noncapitalizable

Metric Reference Guide  2-25


Project Analytics

4.76 Raw Cost - ITD Inception to date raw cost

4.77 Billable Labor Effort % - ITD 100*(Inception to date billable units of labor
used /Total units of labor used)

4.78 Equipment Cost % - ITD 100*(Inception to date Equipment Cost /


Inception to date Equipment Cost in the
current version of the budget)

4.79 Equipment Effort % - ITD Inception to date units of equipment used


as a percent of the inception to date units of
equipment included in the current budget

4.80 Labor Cost % - ITD 100*(Inception to date Labor Cost /


Inception to date Labor Cost in the current
version of the budget)
4.81 Labor Effort % - ITD 100*(Inception to date Labor Effort /
Inception to date Labor Effort in the current
version of the budget)
4.82 Nonbillable Cost % - ITD 100*(Inception to Date Non-Billable Cost)/
Inception to Date Cost

4.83 Nonbillable Labor Effort % - ITD 100*(Inception to date non billable units of
labor used/ Inception to date units of labor
used)
4.84 Billable and Capitalizable Burden Cost - MTD Month to date burden cost of transactions
that are both billable and capitalizable

4.85 Billable and Capitalizable Cost - MTD Month to date cost of transactions that are
both billable and capitalizable

4.86 Billable and Capitalizable Raw Cost - MTD Month to date raw cost of transactions that
are both billable and capitalizable

4.87 Billable Cost - MTD Month to date cost amount of transactions


that are billable
4.88 Burden Cost - MTD Month to date amount in burden cost
transactions
4.89 Capitalizable Cost - MTD Month to date capitalizable cost

4.90 Capitalizable Net Billable Burden Cost - MTD Month to date amount of capitalizable
burden cost that is not billable and cannot
be recovered.

Metric Reference Guide  2-26


Project Analytics

4.91 Capitalizable Net Billable Cost - MTD Month to Date amount of capitalizable cost
that is not billable and cannot be recovered.

4.92 Capitalizable Net Billable Raw Cost - MTD Month to date amount of capitalizable raw
cost that is not billable and cannot be
recovered.
4.93 Cost - MTD Month-to-date cost amount

4.94 Equipment Cost - MTD Month to date amount of cost related to the
use of equipment

4.95 Equipment Effort - MTD Month to date units of equipment used

4.96 Labor Cost - MTD Moth to date amount of cost related to the
use of labor
4.97 Labor Effort - MTD Month to date units (time or quantity) of
labor used
4.98 Nonbillable Burden Cost - MTD Month to date nonbillable burden cost
transactions
4.99 Nonbillable Cost - MTD Month to Date raw and burdened costs not
flagged as billable
4.100 Nonbillable Raw Cost - MTD Month to date nonbillable direct cost
transactions
4.101 Noncapitalizable Burden Cost - MTD Month to date mount of noncapitalizable
burden cost
4.102 Noncapitalizable Cost - MTD Month to date cost amount of transactions
that are of noncapitalizable

4.103 Noncapitalizable Raw Cost - MTD Month to date raw cost amount of
transactions that are of noncapitalizable

4.104 Raw Cost - MTD Month to date raw cost

4.105 Billable Cost % 100*(Billable Cost / Cost)


4.106 Billable Labor Effort % 100*(Billable labor units used/Total units of
labor used)
4.107 Burden Cost % 100 * Burden cost / Cost
4.108 Capitalizable Cost % 100*(Capitalizable Cost /Cost).

4.109 Cost Change compare to Previous Month Cost - Cost MAGO


4.110 Cost Change compared to Previous Quarter Cost - Cost QAGO
4.111 Equipment Cost % Spent 100* (Equipment Cost /Equipment Cost in
the current version of the budget)

Metric Reference Guide  2-27


Project Analytics

4.112 Equipment Effort % Spent 100*(Units of equipment used/ Units of


equipment budgeted in the current version
of the budget)
4.113 Expenses % 100*(Cost - Capitalizable Cost)/Cost

4.114 Labor Cost % 100*(Labor Cost / Cost)


4.115 Labor Cost % Spent 100*(Actual Labor Cost / Labor Cost in the
current version of the budget)

4.116 Labor Effort % Spent 100*(Units of labor used/ Units of labor


budgeted in the current version of the
budget)
4.117 Nonbillable Cost % 100*(Non-Billable Cost)/Cost
4.118 Nonbillable Labor Effort % 100*(Non billable units of labor used/ Units
of labor used)
4.119 Billable and Capitalizable Burden Cost - QTD Quarter to date burden cost of transactions
that are both billable and capitalizable

4.120 Billable and Capitalizable Cost - QTD Quarter to date cost of transactions that are
both billable and capitalizable

4.121 Billable and Capitalizable Raw Cost - QTD Quarter to date raw cost of transactions
that are both billable and capitalizable

4.122 Billable Cost - QTD Quarter to date cost amount of transactions


that are billable
4.123 Burden Cost - QTD Quarter to date amount in burden cost
transactions
4.124 Capitalizable Cost - QTD Quarter to date capitalizable cost

4.125 Capitalizable Net Billable Burden Cost - QTD Quarter to date amount of capitalizable
burden cost that is not billable and cannot
be recovered.

4.126 Capitalizable Net Billable Cost - QTD Quarter to Date amount of capitalizable
cost that is not billable and cannot be
recovered.
4.127 Capitalizable Net Billable Raw Cost - QTD Quarter to date amount of capitalizable raw
cost that is not billable and cannot be
recovered.
4.128 Cost - QTD Quarter-to-date cost amount

4.129 Equipment Cost - QTD Quarter to date amount of cost related to


the use of equipment

4.130 Equipment Effort - QTD Quarter to date units of equipment used

Metric Reference Guide  2-28


Project Analytics

4.131 Labor Cost - QTD Quarter to date amount of cost related to


the use of labor
4.132 Labor Effort - QTD Quarter to date units (time or quantity) of
labor used
4.133 Nonbillable Burden Cost - QTD Quarter to date nonbillable burden cost
transactions
4.134 Nonbillable Cost - QTD Quarter to Date raw and burdened costs
not flagged as billable
4.135 Nonbillable Raw Cost - QTD Quarter to date nonbillable direct cost
transactions
4.136 Noncapitalizable Burden Cost - QTD Quarter to date mount of noncapitalizable
burden cost
4.137 Noncapitalizable Cost - QTD Quarter to date cost amount of transactions
that are of noncapitalizable

4.138 Noncapitalizable Raw Cost - QTD Quarter to date raw cost amount of
transactions that are of noncapitalizable

4.139 Raw Cost - QTD Quarter to date raw cost

4.140 Billable and Capitalizable Burden Cost - YTD Year to date burden cost of transactions
that are both billable and capitalizable

4.141 Billable and Capitalizable Cost - YTD Year to date cost of transactions that are
both billable and capitalizable

4.142 Billable and Capitalizable Raw Cost - YTD Year to date raw cost of transactions that
are both billable and capitalizable

4.143 Billable Cost - YTD Year to date cost amount of transactions


that are billable
4.144 Burden Cost - YTD Year to date amount in burden cost
transactions
4.145 Capitalizable Cost - YTD Year to date capitalizable cost

4.146 Capitalizable Net Billable Burden Cost - YTD Year to date amount of capitalizable burden
cost that is not billable and cannot be
recovered.

4.147 Capitalizable Net Billable Cost - YTD Year to Date amount of capitalizable cost
that is not billable and cannot be recovered.

4.148 Capitalizable Net Billable Raw Cost - YTD Year to date amount of capitalizable raw
cost that is not billable and cannot be
recovered.

Metric Reference Guide  2-29


Project Analytics

4.149 Cost - YTD Year-to-date cost amount

4.150 Equipment Cost - YTD Year to date amount of cost related to the
use of equipment

4.151 Equipment Effort - YTD Year to date units of equipment used

4.152 Labor Cost - YTD Year to date amount of cost related to the
use of labor
4.153 Labor Effort - YTD Year to date units (time or quantity) of labor
used
4.154 Nonbillable Burden Cost - YTD Year to date nonbillable burden cost
transactions
4.155 Nonbillable Cost - YTD Year to Date raw and burdened costs not
flagged as billable
4.156 Nonbillable Raw Cost - YTD Year to date nonbillable direct cost
transactions
4.157 Noncapitalizable Burden Cost - YTD Year to date mount of noncapitalizable
burden cost
4.158 Noncapitalizable Cost - YTD Year to date cost amount of transactions
that are of noncapitalizable

4.159 Noncapitalizable Raw Cost - YTD Year to date raw cost amount of
transactions that are of noncapitalizable

4.160 Raw Cost - YTD Year to date raw cost

2.5 Project - Cost GL Reconciliation

No Metric Name Description

5.1 # of Amount Mismatch Count of journals lines with transaction amounts


that do not match the total amount of their
matching cost distributions lines

Metric Reference Guide  2-30


Project Analytics

5.2 # of Cost Line Transfer Exceptions Count of cost distribution lines transferred out of
Projects but not found at their destination. For
EBS R12 users this is those lines not found in
Sub Ledger Accounting. For EBS 11.5.10 this is
those lines not found in General Ledger. For
PeopleSoft customers with single feed, this is
those lines not found in the Accounting Lines
table. This metric does not apply for PeopleSoft
users with Dual Feed.
5.3 # of Cost Lines not in GL Count of transferred cost distribution lines that
have no corresponding journal lines created in
General Ledger. For EBS R12 users this is
exceptions in the transfer from Sub Ledger
Accounting to General Ledger. For PeopleSoft
Customers, this is exceptions in the transfer from
Accounting Lines to General Ledger. This metric
does not apply for EBS 11.5.10 users or
PeopleSoft customers with Dual Feed.

5.4 # of Cost Lines with Unposted Journals Count of transferred cost distribution lines, with
journal lines created but not posted to the
General Ledger

5.5 # of Manual Journal Lines Count of journal lines that do not have matching
cost distribution lines

5.6 Amount - Cost Line Transfer Exceptions Debit amount of cost distribution lines transferred
out of Projects but not found at their destination.
For EBS R12 users this is those lines not found
in Sub Ledger Accounting. For EBS 11.5.10 this
is those lines not found in General Ledger. For
PeopleSoft customers with Single Feed, this is
those lines not found in the Accounting Lines
table. This metric does not apply for PeopleSoft
users with dual feed.
5.7 Amount - Cost Lines not in GL Debit amount of transferred cost distribution lines
that have no corresponding journal lines created
in General Ledger. For EBS R12 users this is
exceptions in the transfer from Sub Ledger
Accounting to General Ledger. For PeopleSoft
Customers, this is exceptions in the transfer from
Accounting Lines to General Ledger. This metric
does not apply for EBS 11.5.10 users or
PeopleSoft customers with Dual Feed.

5.8 Amount - Cost Lines with Unposted Amount of transferred cost distribution lines, with
Journals journal lines created but not posted to the
General Ledger

5.9 Cost Lines - Credit Amount Amount of credit entries for a cost line

Metric Reference Guide  2-31


Project Analytics

5.10 Cost Lines - Debit Amount Amount of debit entries for cost lines

5.11 Credit Amount - Manual Journal Lines Transaction amount of credit journal lines that do
not have matching cost distribution lines

5.12 Debit Amount - Manual Journal Lines Transaction amount of debit journal lines that do
not have matching cost distribution lines

5.13 Journal Lines - Credit Amount Credit amount value of journal lines

5.14 Journal Lines - Debit Amount Debit amount value of journal lines

5.15 Transaction Amount Amount of cost transactions

2.6 Project - Cross Charge

No Metric Name Description

6.1 Cost MAGO Cost amount in the month previous to that


selected by the user

6.2 Cost QAGO Cost amount in the quarter previous to that


selected by the user

6.3 Cost YAGO Cost amount in the year previous to that selected
by the user
6.4 Organization Own Cost MAGO Cost incurred by resources working on projects
owned by their organization in the month
previous to that selected by the user.

6.5 Organization Own Cost QAGO Cost incurred by resources working on projects
owned by their organization in the quarter
previous to that selected by the user.

6.6 Organization Own Cost YAGO Cost incurred by resources working on projects
owned by their organization in the year previous
to that selected by the user.

Metric Reference Guide  2-32


Project Analytics

No Metric Name Description

6.7 Organization Own Revenue MAGO The externally recognized revenue during the
previous month from resources working on
projects owned by their organization, or
organizations where there is no cross charge
relationship

6.8 Organization Own Revenue QAGO The externally recognized revenue during the
previous quarter from resources working on
projects owned by their organization, or
organizations where there is no cross charge
relationship

6.9 Organization Own Revenue YAGO The externally recognized revenue during the
previous year from resources working on projects
owned by their organization, or organizations
where there is no cross charge relationship

6.10 Own Cost % of Organization Cost Percentage of the organization's cost in the
MAGO previous month that corresponds to cost incurred
by resources working on projects owned by their
organization.

6.11 Own Cost % of Organization Cost Percentage of the organization's cost in the
QAGO previous quarter that corresponds to cost
incurred by resources working on projects owned
by their organization.

6.12 Own Cost % of Organization Cost Percentage of the organization's cost in the
YAGO previous year that corresponds to cost incurred
by resources working on projects owned by their
organization.

6.13 Own Revenue % of Organization Percentage of the total revenue that corresponds
Revenue MAGO to own revenue during the previous month

6.14 Own Revenue % of Organization Percentage of the total revenue that corresponds
Revenue QAGO to own revenue during the previous quarter

6.15 Own Revenue % of Organization Percentage of the total revenue that corresponds
Revenue YAGO to own revenue during the previous year

Metric Reference Guide  2-33


Project Analytics

No Metric Name Description

6.16 ----------------Quarter Ago Measures------


--------------
6.17 Cost In % of Organization Cost The percentage of cost the organization incurs
from borrowing resources from other
organizations.

6.18 Cost Out % of Resource Cost The percentage of cost the organization transfers
out for lending their resources to other
organizations.

6.19 Organization External Revenue for The externally recognized revenue from
borrowed resources resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.20 Organization External Revenue for The externally recognized B&L revenue from
borrowed resources - B&L resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.21 Organization External Revenue for The externally recognized Intercompany revenue
borrowed resources - Intercompany from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.22 Organization External Revenue for Value of cross charge transactions once they
borrowed resources - Pending have been identified as cross charge, but before
its determined if they are B&L or intercompany

6.23 Organization Internal Actual Cost Total actual cost incurred by resources working
on projects owned by another organization.

6.24 Organization Internal Actual Cost - B&L Actual cost incurred by resources working on
projects owned by another organization where
there is a borrowed and lent relationship.

6.25 Organization Internal Actual Cost - Actual cost incurred by resources working on
Intercompany projects owned by another organization where
there is a intercompany relationship

Metric Reference Guide  2-34


Project Analytics

No Metric Name Description

6.26 Organization Internal Actual Cost - Value of cross charge transactions once they
Pending have been identified as cross charge, but before
its determined if they are B&L or intercompany

6.27 Organization Internal Cost In - B&L The cost transferred into an organization for work
performed by resources belonging to another
organization that they have a B&L relationship
with.

6.28 Organization Internal Cost In - The cost transferred into an organization for work
Intercompany performed by resources belonging to another
organization that they have an intercompany
billing relationship with. *This is the intercompany
invoice amount generated by the provider and
sent to AP for the...

6.29 Organization Internal Cost Out - B&L The cost transferred to another organization for
work performed by resources belonging to
another organization

6.30 Organization Internal Cost Out - The cost transferred to another organization for
Intercompany work performed by resources belonging to
another organization that they have an
intercompany relationship with.

6.31 Organization Internal Revenue - The intercompany revenue generated by an


Intercompany organization for work done by its resources on
projects owned by another organization that they
have an Intercompany billing relationship with.

6.32 Organization Internal Revenue In - B&L The revenue transferred into an organization for
work done by its resources on projects owned by
another organization that they have a B&L
relationship with.

6.33 Organization Internal Revenue Out - The Revenue transferred to another organization
B&L for work performed by resources belonging to
another organization

Metric Reference Guide  2-35


Project Analytics

No Metric Name Description

6.34 Organization Margin The actual margin for the organization taking into
account the borrowed and lent and intercompany
transactions.

6.35 Organization Margin % The actual margin percentage for the


organization taking into account the borrowed
and lent and intercompany transactions

6.36 Organization Own Cost Cost incurred by resources working on projects


owned by their organization.

6.37 Organization Own Revenue (External) The externally recognized revenue from
resources working on projects owned by their
organization, or organizations where there is no
cross charge relationship.

6.38 Organization Retained Cost - B&L The portion of the actual cost retained by the
organization for work performed by its resources
on projects owned by another organization where
there is a borrowed and lent relationship. A
negative value means that the total transfer price
is greater than the total transfer price

6.39 Organization Retained Cost - The cost transferred into an organization for work
Intercompany performed by resources belonging to another
organization that they have a B&L relationship
with.

6.40 Organization Retained Revenue - B&L The portion of the externally recognized revenue
retained by the organization for work performed
by a resource belonging to another organization
in which there is a B&L relationship.

Metric Reference Guide  2-36


Project Analytics

No Metric Name Description

6.41 Organization Retained Revenue - The portion of the externally recognized revenue
Intercompany retained by the organization for work performed
by a resource belonging to another organization
in which there is an intercompany billing
relationship.

6.42 Own Cost % of Organization Cost The percentage of cost the organization incurs
from their own resources working on their
projects.

6.43 Own Cost % of Resource Cost The percentage of cost the organization’s
resources incur from working on their own
projects versus being lent to other organizations
projects.

6.44 Own Revenue % of Direct Revenue Own Revenue + Retained Revenue

6.45 Own Revenue % of Organization The percentage of revenue the organization


Revenue earns from their own resources working on their
projects.

6.46 Own Revenue % of Resource Revenue The percentage of revenue the organization’s
resources earn from working on their own
projects versus being lent to other organizations
projects.

6.47 Resource Margin The actual margin for resources owned by the
receiver taking into account the borrowed and
lent and intercompany transactions.

6.48 Resource Margin % The actual margin percentage for resources


owned by the receiver taking into account the
borrowed and lent and intercompany
transactions

6.49 Revenue In % of Organization The percentage of revenue the organization


Revenue earns from lending resources to other
organizations.
6.50 Revenue In to Own Revenue The ratio of revenue transferred into the
organization to the organizations own revenue.

Metric Reference Guide  2-37


Project Analytics

No Metric Name Description

6.51 Revenue Out % of Direct Revenue Organization internal revenue out – B&L
expressed as a percent of the direct revenue.
Direct revenue = Own Revenue + Retained
Revenue

6.52 Revenue Out % of Resource Revenue The percentage of revenue the organization
shares versus revenue earned by the
organizations resources working on any project.

6.53 Revenue Out to Own Revenue The ratio of revenue transferred out of the
organization to the organizations own revenue

6.54 Total Organization Cost The total cost incurred by the organization taking
into account the costs transferred in and out.

6.55 Total Organization Internal Cost In Total actual cost incurred by resources working
on projects owned by another organization.

6.56 Total Organization Internal Revenue In Total revenue brought into the organization by
resources working on other organizations
projects. (Organization Internal Revenue In - B&L
+ Organization Internal Revenue In -
Intercompany)

6.57 Total Organization Retained Revenue The portion of the externally recognized revenue
retained by the organization for work performed
by a resource belonging to another organization
in which there is a B&L relationship.

6.58 Total Organization Revenue The total revenue recognized by the organization
taking into account the revenue transferred in
and out.

6.59 Total Project Cost The total cost incurred by projects owned by the
organization taking into account the costs
transferred in for resources belonging to another
organization.

Metric Reference Guide  2-38


Project Analytics

No Metric Name Description

6.60 Total Project Margin (Total Organization Direct Revenue - Total


organization Cost). This is the actual margin for
projects owned by the receiver, taking into
account the borrowed and lent and intercompany
transactions.

6.61 Total Project Margin % 100* (Project Margin / Total Project Revenue).
This is the actual margin percentage for projects
owned by the receiver, taking into account the
B&L and intercompany transactions

6.62 Total Project Revenue The total revenue recognized by the projects
owned by the organization taking into account
the revenue transferred in and out. = Own
Revenue + Total Organization Retained
Revenue

6.63 Total Resource Cost The total cost incurred by the organizations
resources regardless of whose organizations
projects they worked on.

6.64 Total Resource Revenue The total revenue recognized by resources


belonging to the organization regardless of
whose organizations projects they worked on.

6.65 Cost In % of Organization Cost - ITD Inception to date percentage of cost the
organization incurs from borrowing resources
from other organizations.

6.66 Organization External Revenue for Inception to date externally recognized revenue
borrowed resources - B&L - ITD from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.67 Organization External Revenue for Inception to date externally recognized revenue
borrowed resources - Intercompany - from resources working on projects not owned by
ITD their organization, or organizations where there
is a cross charge relationship.

Metric Reference Guide  2-39


Project Analytics

No Metric Name Description

6.68 Organization External Revenue for Inception to date externally recognized revenue
borrowed resources - ITD from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.69 Organization External Revenue for Inception to date Value of cross charge
borrowed resources - Pending - ITD transactions once they have been identified as
cross charge, but before its determined if they
are B&L or intercompany

6.70 Organization Internal Actual Cost - B&L Inception to date actual cost incurred by
- ITD resources working on projects owned by another
organization where there is a borrowed and lent
relationship

6.71 Organization Internal Actual Cost - Inception to date actual cost incurred by
Intercompany - ITD resources working on projects owned by another
organization where there is a intercompany
relationship

6.72 Organization Internal Actual Cost - ITD Inception to date Actual cost incurred by
resources working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.73 Organization Internal Actual Cost - Inception to date value of cross charge
Pending - ITD transactions identified as cross charge, but
before its determined if they are B&L or
intercompany

6.74 Organization Internal Cost In - B&L - Inception to date cost transferred into an
ITD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.75 Organization Internal Cost In - Inception to date cost transferred into an


Intercompany - ITD organization for work performed by resources
belonging to another organization that they have
an intercompany billing relationship with. *This is
the intercompany invoice amount generated by
the provider and sent...

Metric Reference Guide  2-40


Project Analytics

No Metric Name Description

6.76 Organization Internal Cost Out - B&L - Inception to date cost transferred into an
ITD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.77 Organization Internal Cost Out - Inception to date cost transferred to another
Intercompany - ITD organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.78 Organization Internal Revenue - Inception to date intercompany revenue


Intercompany - ITD generated by an organization for work done by
its resources on projects owned by another
organization that they have an Intercompany
billing relationship with.

6.79 Organization Internal Revenue In - B&L Inception to date revenue transferred into an
- ITD organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.80 Organization Internal Revenue Out - Inception to date Revenue transferred to another
B&L - ITD organization for work performed by resources
belonging to another organization

6.81 Organization Margin - ITD Inception to date actual margin for the
organization taking into account the borrowed
and lent and intercompany transactions.

6.82 Organization Own Cost - ITD Inception to date cost incurred by resources
working on projects owned by their organization.

6.83 Organization Own Revenue (External) Inception to date externally recognized revenue
- ITD from resources working on projects owned by
their organization, or organizations where there
is no cross charge relationship.

Metric Reference Guide  2-41


Project Analytics

No Metric Name Description

6.84 Organization Retained Cost - B&L - Inception to date portion of the actual cost
ITD retained by the organization for work performed
by its resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the burdened
cost.

6.85 Organization Retained Cost - Inception to date cost transferred into an


Intercompany - ITD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.86 Organization Retained Revenue - B&L Inception to date portion of the externally
- ITD recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.87 Organization Retained Revenue - The portion of the externally recognized revenue
Intercompany - ITD retained by the organization for work performed
by a resource belonging to another organization
in which there is an intercompany billing
relationship.

6.88 Own Cost % of Organization Cost - ITD Inception to date percentage of cost the
organization incurs from their own resources
working on their projects.

6.89 Own Revenue % of Direct Revenue - ITD Own Revenue + ITD Retained Revenue
ITD

6.90 Resource Margin - ITD Inception to date actual margin for resources
owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

6.91 Revenue In to Own Revenue - ITD Inception to date ratio of revenue transferred into
the organization to the organizations own
revenue.

Metric Reference Guide  2-42


Project Analytics

No Metric Name Description

6.92 Revenue Out % of Direct Revenue - Inception to date percentage of revenue the
ITD organization shares for all resources working on
their projects.

6.93 Revenue Out to Own Revenue - ITD Inception to date ratio of revenue transferred out
of the organization to the organizations own
revenue
6.94 Total Organization Cost - ITD Inception to date total cost incurred by the
organization taking into account the costs
transferred in and out.

6.95 Total Organization Internal Cost In - Inception to date Total actual cost incurred by
ITD resources working on projects owned by another
organization.

6.96 Total Organization Internal Revenue In Inception to date total revenue brought into the
- ITD organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.97 Total Organization Retained Revenue - Inception to date portion of the externally
ITD recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.98 Total Organization Revenue - ITD Inception to date total revenue recognized by the
organization taking into account the revenue
transferred in and out.

6.99 Total Project Cost - ITD Inception to date total cost incurred by projects
owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.100 Total Project Margin - ITD Inception to date actual margin for resources
owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

Metric Reference Guide  2-43


Project Analytics

No Metric Name Description

6.101 Total Project Revenue - ITD The total revenue recognized by the projects
owned by the organization taking into account
the revenue transferred in and out. = Own
Revenue + Total Organization Retained
Revenue

6.102 Total Resource Cost - ITD Inception to date total cost incurred by the
organizations resources regardless of whose
organizations projects they worked on.

6.103 Total Resource Revenue - ITD Inception to date total revenue recognized by
resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.104 Organization External Revenue for Month to date externally recognized revenue
borrowed resources - B&L - MTD from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.105 Organization External Revenue for Month to date externally recognized revenue
borrowed resources - Intercompany - from resources working on projects not owned by
MTD their organization, or organizations where there
is a cross charge relationship.

6.106 Organization External Revenue for Month to date externally recognized revenue
borrowed resources - MTD from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.107 Organization External Revenue for Month to date Value of cross charge transactions
borrowed resources - Pending - MTD once they have been identified as cross charge,
but before its determined if they are B&L or
intercompany

6.108 Organization Internal Actual Cost - B&L Month to date actual cost incurred by resources
- MTD working on projects owned by another
organization where there is a borrowed and lent
relationship.

Metric Reference Guide  2-44


Project Analytics

No Metric Name Description

6.109 Organization Internal Actual Cost - Month to date actual cost incurred by resources
Intercompany - MTD working on projects owned by another
organization where there is a intercompany
relationship

6.110 Organization Internal Actual Cost - Month to date Actual cost incurred by resources
MTD working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.111 Organization Internal Actual Cost - Month to date value of cross charge transactions
Pending - MTD identified as cross charge, but before its
determined if they are B&L or intercompany

6.112 Organization Internal Cost In - B&L - Month to date cost transferred into an
MTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.113 Organization Internal Cost In - Month to date cost transferred into an


Intercompany - MTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.114 Organization Internal Cost Out - B&L - Month to date cost transferred into an
MTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.115 Organization Internal Cost Out - Month to date cost transferred to another
Intercompany - MTD organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.116 Organization Internal Revenue - Month to date intercompany revenue generated


Intercompany - MTD by an organization for work done by its resources
on projects owned by another organization that
they have an Intercompany billing relationship
with.

Metric Reference Guide  2-45


Project Analytics

No Metric Name Description

6.117 Organization Internal Revenue In - B&L Month to date revenue transferred into an
- MTD organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.118 Organization Internal Revenue Out - Month to date Revenue transferred to another
B&L - MTD organization for work performed by resources
belonging to another organization

6.119 Organization Margin - MTD Month to date actual margin for the organization
taking into account the borrowed and lent and
intercompany transactions.

6.120 Organization Own Cost - MTD Month to date cost incurred by resources working
on projects owned by their organization.

6.121 Organization Own Revenue (External) Month to date externally recognized revenue
- MTD from resources working on projects owned by
their organization, or organizations where there
is no cross charge relationship.

6.122 Organization Retained Cost - B&L - Month to date portion of the actual cost retained
MTD by the organization for work performed by its
resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the burdened
cost

6.123 Organization Retained Cost - Month to date cost transferred into an


Intercompany - MTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.124 Organization Retained Revenue - B&L Month to date portion of the externally
- MTD recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

Metric Reference Guide  2-46


Project Analytics

No Metric Name Description

6.125 Organization Retained Revenue - The portion of the externally recognized revenue
Intercompany - MTD retained by the organization for work performed
by a resource belonging to another organization
in which there is an intercompany billing
relationship.

6.126 Resource Margin - MTD Month to date actual margin for resources owned
by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.127 Revenue In to Own Revenue - MTD Month to date ratio of revenue transferred into
the organization to the organizations own
revenue.
6.128 Revenue Out to Own Revenue - MTD Month to date ratio of revenue transferred out of
the organization to the organizations own
revenue
6.129 Total Organization Cost - MTD Month to date total cost incurred by the
organization taking into account the costs
transferred in and out.

6.130 Total Organization Internal Cost In - Month to date Total actual cost incurred by
MTD resources working on projects owned by another
organization.

6.131 Total Organization Internal Revenue In Month to date total revenue brought into the
- MTD organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.132 Total Organization Retained Revenue - Month to date portion of the externally
MTD recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.133 Total Organization Revenue - MTD Month to date total revenue recognized by the
organization taking into account the revenue
transferred in and out.

Metric Reference Guide  2-47


Project Analytics

No Metric Name Description

6.134 Total Project Cost - MTD Month to date total cost incurred by projects
owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.135 Total Project Margin - MTD Month to date actual margin for resources owned
by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.136 Total Project Revenue - MTD Month to date total revenue recognized by
resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.137 Total Resource Cost - MTD Month to date total cost incurred by the
organizations resources regardless of whose
organizations projects they worked on.

6.138 Total Resource Revenue - MTD Month to date total revenue recognized by
resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.139 Organization External Revenue for Quarter to date externally recognized revenue
borrowed resources - B&L - QTD from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.140 Organization External Revenue for Quarter to date externally recognized revenue
borrowed resources - Intercompany - from resources working on projects not owned by
QTD their organization, or organizations where there
is a cross charge relationship.

6.141 Organization External Revenue for Quarter to date of cross charge transactions
borrowed resources - Pending - QTD once they have been identified as cross charge,
but before its determined if they are B&L or
intercompany

Metric Reference Guide  2-48


Project Analytics

No Metric Name Description

6.142 Organization External Revenue for Quarter to date externally recognized revenue
borrowed resources - QTD from resources working on projects not owned by
their organization, or organizations where there
is a cross charge relationship.

6.143 Organization Internal Actual Cost - B&L Quarter to date actual cost incurred by resources
- QTD working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.144 Organization Internal Actual Cost - Quarter to date actual cost incurred by resources
Intercompany - QTD working on projects owned by another
organization where there is a intercompany
relationship

6.145 Organization Internal Actual Cost - Quarter to date value of cross charge
Pending - QTD transactions identified as cross charge, but
before its determined if they are B&L or
intercompany

6.146 Organization Internal Actual Cost - Quarter to date Actual cost incurred by resources
QTD working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.147 Organization Internal Cost In - B&L - Quarter to date cost transferred into an
QTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.148 Organization Internal Cost In - Quarter to date cost transferred into an


Intercompany - QTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.149 Organization Internal Cost Out - B&L - Quarter to date cost transferred into an
QTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

Metric Reference Guide  2-49


Project Analytics

No Metric Name Description

6.150 Organization Internal Cost Out - Quarter to date cost transferred to another
Intercompany - QTD organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.151 Organization Internal Revenue - Quarter to date intercompany revenue generated


Intercompany - QTD by an organization for work done by its resources
on projects owned by another organization that
they have an Intercompany billing relationship
with.

6.152 Organization Internal Revenue In - B&L Quarter to date revenue transferred into an
- QTD organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.153 Organization Internal Revenue Out - Quarter to date Revenue transferred to another
B&L - QTD organization for work performed by resources
belonging to another organization

6.154 Organization Margin - QTD Quarter to date actual margin for the organization
taking into account the borrowed and lent and
intercompany transactions.

6.155 Organization Own Cost - QTD Quarter to date cost incurred by resources
working on projects owned by their organization.

6.156 Organization Own Revenue (External) Quarter to date externally recognized revenue
- QTD from resources working on projects owned by
their organization, or organizations where there
is no cross charge relationship.

6.157 Organization Retained Cost - B&L - Quarter to date portion of the actual cost retained
QTD by the organization for work performed by its
resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the burdened
cost

Metric Reference Guide  2-50


Project Analytics

No Metric Name Description

6.158 Organization Retained Cost - Quarter to date cost transferred into an


Intercompany - QTD organization for work performed by resources
belonging to another organization that they have
a B&L relationship with.

6.159 Organization Retained Revenue - B&L Quarter to date portion of the externally
- QTD recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.160 Organization Retained Revenue - Quarter to date portion of the externally


Intercompany - QTD recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is an
intercompany billing relationship.

6.161 Resource Margin - QTD Quarter to date actual margin for resources
owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

6.162 Revenue In to Own Revenue - QTD Quarter to date ratio of revenue transferred into
the organization to the organizations own
revenue.
6.163 Revenue Out to Own Revenue - QTD Quarter to date ratio of revenue transferred out of
the organization to the organizations own
revenue
6.164 Total Organization Cost - QTD Quarter to date total cost incurred by the
organization taking into account the costs
transferred in and out.

6.165 Total Organization Internal Cost In - Quarter to date Total actual cost incurred by
QTD resources working on projects owned by another
organization.

Metric Reference Guide  2-51


Project Analytics

No Metric Name Description

6.166 Total Organization Internal Revenue In Quarter to date total revenue brought into the
- QTD organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.167 Total Organization Retained Revenue - Quarter to date portion of the externally
QTD recognized revenue retained by the organization
for work performed by a resource belonging to
another organization in which there is a B&L
relationship.

6.168 Total Organization Revenue - QTD Quarter to date total revenue recognized by the
organization taking into account the revenue
transferred in and out.

6.169 Total Project Cost - QTD Quarter to date total cost incurred by projects
owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.170 Total Project Margin - QTD Quarter to date actual margin for resources
owned by the receiver taking into account the
borrowed and lent and intercompany
transactions.

6.171 Total Project Revenue - QTD Quarter to date total revenue recognized by
resources belonging to the organization
regardless of whose organizations projects they
worked on.

6.172 Total Resource Cost - QTD Quarter to date total cost incurred by the
organizations resources regardless of whose
organizations projects they worked on.

6.173 Total Resource Revenue - QTD Quarter to date total revenue recognized by
resources belonging to the organization
regardless of whose organizations projects they
worked on.

Metric Reference Guide  2-52


Project Analytics

No Metric Name Description

6.174 Organization External Revenue for Year to date externally recognized revenue from
borrowed resources - B&L - YTD resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.175 Organization External Revenue for Year to date externally recognized revenue from
borrowed resources - Intercompany - resources working on projects not owned by their
YTD organization, or organizations where there is a
cross charge relationship.

6.176 Organization External Revenue for Year to date of cross charge transactions once
borrowed resources - Pending - YTD they have been identified as cross charge, but
before its determined if they are B&L or
intercompany

6.177 Organization External Revenue for Year to date externally recognized revenue from
borrowed resources - YTD resources working on projects not owned by their
organization, or organizations where there is a
cross charge relationship.

6.178 Organization Internal Actual Cost - B&L Year to date actual cost incurred by resources
- YTD working on projects owned by another
organization where there is a borrowed and lent
relationship.

6.179 Organization Internal Actual Cost - Year to date actual cost incurred by resources
Intercompany - YTD working on projects owned by another
organization where there is a intercompany
relationship

6.180 Organization Internal Actual Cost - Year to date value of cross charge transactions
Pending - YTD identified as cross charge, but before its
determined if they are B&L or intercompany

6.181 Organization Internal Actual Cost - Year to date Actual cost incurred by resources
YTD working on projects owned by another
organization where there is a borrowed and lent
relationship.

Metric Reference Guide  2-53


Project Analytics

No Metric Name Description

6.182 Organization Internal Cost In - B&L - Year to date cost transferred into an organization
YTD for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.183 Organization Internal Cost In - Year to date cost transferred into an organization
Intercompany - YTD for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.184 Organization Internal Cost Out - B&L - Year to date cost transferred into an organization
YTD for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.185 Organization Internal Cost Out - Year to date cost transferred to another
Intercompany - YTD organization for work performed by resources
belonging to another organization that they have
an intercompany relationship with.

6.186 Organization Internal Revenue - Year to date intercompany revenue generated by


Intercompany - YTD an organization for work done by its resources on
projects owned by another organization that they
have an Intercompany billing relationship with.

6.187 Organization Internal Revenue In - B&L Year to date revenue transferred into an
- YTD organization for work done by its resources on
projects owned by another organization that they
have a B&L relationship with.

6.188 Organization Internal Revenue Out - Year to date Revenue transferred to another
B&L - YTD organization for work performed by resources
belonging to another organization

6.189 Organization Margin - YTD Year to date actual margin for the organization
taking into account the borrowed and lent and
intercompany transactions.

6.190 Organization Own Cost - YTD Year to date cost incurred by resources working
on projects owned by their organization.

Metric Reference Guide  2-54


Project Analytics

No Metric Name Description

6.191 Organization Own Revenue (External) Year to date externally recognized revenue from
- YTD resources working on projects owned by their
organization, or organizations where there is no
cross charge relationship.

6.192 Organization Retained Cost - B&L - Year to date portion of the actual cost retained by
YTD the organization for work performed by its
resources on projects owned by another
organization where there is a borrowed and lent
relationship. A negative value means that the
total transfer price is greater than the total
transfer price

6.193 Organization Retained Cost - Year to date cost transferred into an organization
Intercompany - YTD for work performed by resources belonging to
another organization that they have a B&L
relationship with.

6.194 Organization Retained Revenue - B&L Year to date portion of the externally recognized
- YTD revenue retained by the organization for work
performed by a resource belonging to another
organization in which there is a B&L relationship.

6.195 Organization Retained Revenue - Year to date portion of the externally recognized
Intercompany - YTD revenue retained by the organization for work
performed by a resource belonging to another
organization in which there is an intercompany
billing relationship.

6.196 Resource Margin - YTD Year to date actual margin for resources owned
by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.197 Revenue In to Own Revenue - YTD Year to date ratio of revenue transferred into the
organization to the organizations own revenue.

Metric Reference Guide  2-55


Project Analytics

No Metric Name Description

6.198 Revenue Out to Own Revenue - YTD Year to date ratio of revenue transferred out of
the organization to the organizations own
revenue
6.199 Total Organization Cost - YTD Year to date total cost incurred by the
organization taking into account the costs
transferred in and out.

6.200 Total Organization Internal Cost In - Year to date Total actual cost incurred by
YTD resources working on projects owned by another
organization.

6.201 Total Organization Internal Revenue In Year to date total revenue brought into the
- YTD organization by resources working on other
organizations projects. (Organization Internal
Revenue In - B&L + Organization Internal
Revenue In - Intercompany)

6.202 Total Organization Retained Revenue - Year to date portion of the externally recognized
YTD revenue retained by the organization for work
performed by a resource belonging to another
organization in which there is a B&L relationship.

6.203 Total Organization Revenue - YTD Year to date total revenue recognized by the
organization taking into account the revenue
transferred in and out.

6.204 Total Project Cost - YTD Year to date total cost incurred by projects
owned by the organization taking into account
the costs transferred in for resources belonging
to another organization.

6.205 Total Project Margin - YTD Year to date actual margin for resources owned
by the receiver taking into account the borrowed
and lent and intercompany transactions.

6.206 Total Project Revenue - YTD Year to date total revenue recognized by
resources belonging to the organization
regardless of whose organizations projects they
worked on.

Metric Reference Guide  2-56


Project Analytics

No Metric Name Description

6.207 Total Resource Cost - YTD Year to date total cost incurred by the
organizations resources regardless of whose
organizations projects they worked on.

6.208 Total Resource Revenue - YTD Year to date total revenue recognized by
resources belonging to the organization
regardless of whose organizations projects they
worked on.

2.7 Project – Forecast

No Metric Name Description

7.1 Current Actual Cost Burdened cost amount in the current forecast
version

7.2 Current Actual Effort Actual effort in the current primary cost forecast
version
7.3 Current Actual Revenue Actual revenue amount in the current primary
revenue forecast version

7.4 Current EAC Cost Estimate at completion cost amount in the current
forecast version.

7.5 Current EAC Effort Estimate at completion effort in the current forecast
version. EAC equals actual effort + remaining
forecasted effort as required to complete the
project

7.6 Current EAC Revenue Estimate at completion revenue amount in the


current revenue forecast version

7.7 Current ETC Cost Estimate to complete cost amount in the current
forecast version.

7.8 Current ETC Effort Estimate to complete effort in the current primary
forecast version.
7.9 Current ETC Revenue Estimated to complete revenue amount in the
current primary revenue forecast version

Metric Reference Guide  2-57


Project Analytics

No Metric Name Description

7.10 Original Actual Cost Actual burdened cost amount (Raw + burden cost)
in the original primary cost forecast version

7.11 Original Actual Effort Actual effort in the original primary cost forecast
version
7.12 Original Actual Revenue Actual revenue amount in the original primary
revenue forecast version

7.13 Original EAC Cost Estimate at completion burdened cost amount in


the original cost forecast

7.14 Original EAC Effort Estimate at completion effort in the original primary
cost forecast version. EAC equals actual effort +
remaining forecasted effort as required to complete
the project

7.15 Original EAC Revenue Estimate at completion revenue amount in the


original primary revenue forecast version

7.16 Original ETC Cost Estimate to complete burdened cost amount in the
original version of the forecast

7.17 Original ETC Effort Estimate to complete effort in the original primary
forecast version.
7.18 Original ETC Revenue Estimated to complete revenue amount in the
original primary revenue forecast version

7.19 Total Current EAC Cost Estimate at completion amount (raw + burden
costs) in the current primary cost forecast version.
EAC equals actual costs plus remaining cost
forecasted as required to complete the project

7.20 Total Current EAC Revenue Estimate at completion revenue amount in current
primary revenue forecast version

7.21 Total Original EAC Cost Estimate at completion burdened cost amount (raw
+ burden costs) in the original primary cost forecast
version. EAC equals actual costs plus remaining
cost forecasted as required to complete the project

7.22 Total Original EAC Revenue Estimate at completion revenue amount in the
original primary revenue forecast version

7.23 Current EAC Billable Equipment Cost Inception to date estimate at completion (EAC)
ITD billable cost of equipment

Metric Reference Guide  2-58


Project Analytics

No Metric Name Description

7.24 Current EAC Billable Equipment Effort Inception to date estimate at completion (EAC)
ITD billable units of equipment

7.25 Current EAC Billable Labor Cost ITD Inception to date estimate at completion (EAC)
billable cost of equipment

7.26 Current EAC Billable Labor Effort ITD Inception to date estimate at completion (EAC)
billable units of labor

7.27 Current EAC Cost - ITD Inception to date estimate at completion cost
amount in the current forecast version.

7.28 Current EAC Effort - ITD Inception to date estimate at completion (EAC)
effort in the current forecast version

7.29 Current EAC Equipment Cost - ITD Inception to date estimate at completion cost of
equipment in the current forecast version.

7.30 Current EAC Equipment Effort - ITD Inception to date estimate at completion (EAC)
units of equipment in the current version of the
forecast

7.31 Current EAC Labor Cost - ITD Inception to date estimate at completion cost of
labor in the current forecast version.

7.32 Current EAC Labor Effort - ITD Inception to date estimate at completion (EAC)
units of labor in the current version of the forecast

7.33 Current EAC Revenue - ITD Estimate at completion revenue amount in the
current revenue forecast version.

7.34 Original EAC Cost - ITD Inception to date estimate at completion burdened
cost amount in the original cost forecast

7.35 Original EAC Effort - ITD Inception to date estimate at completion (EAC)
effort in the original cost forecast version

Metric Reference Guide  2-59


Project Analytics

No Metric Name Description

7.36 Original EAC Equipment Cost - ITD Inception to date estimate at completion cost of
equipment in the original forecast version.

7.37 Original EAC Equipment Effort - ITD Inception to date Estimate At Completion of Units
of equipment used in the original version of the
forecast

7.38 Original EAC Labor Cost - ITD Inception to date estimate at completion cost
amount in the original forecast

7.39 Original EAC Labor Effort - ITD Inception to date Estimate At Completion of Units
of labor used in the original version of the forecast

7.40 Original EAC Revenue - ITD Inception to date estimate at completion (EAC)
revenue amount in the original revenue forecast
version

7.41 Current EAC Cost - MTD Month to date estimate at completion cost amount
in the current forecast version.

7.42 Current EAC Effort - MTD Month to date estimate at completion (EAC) effort
in the current forecast version

7.43 Current EAC Equipment Cost - MTD Month to date estimate at completion cost of
equipment in the current forecast version.

7.44 Current EAC Equipment Effort - MTD Month to date estimate at completion (EAC) units
of equipment in the current version of the forecast

7.45 Current EAC Labor Cost - MTD Month to date estimate at completion cost of labor
in the current forecast version.

Metric Reference Guide  2-60


Project Analytics

No Metric Name Description

7.46 Current EAC Labor Effort - MTD Month to date estimate at completion (EAC) units
of labor in the current version of the forecast

7.47 Current EAC Revenue - MTD Estimate at completion revenue amount in the
current revenue forecast version.

7.48 Original EAC Cost - MTD Month to date estimate at completion burdened
cost amount in the original cost forecast

7.49 Original EAC Effort - MTD Month to date estimate at completion (EAC) effort
in the original cost forecast version

7.50 Original EAC Equipment Cost - MTD Month to date estimate at completion cost of
equipment in the original forecast version.

7.51 Original EAC Equipment Effort - MTD Month to date Estimate At Completion of Units of
equipment used in the original version of the
forecast

7.52 Original EAC Labor Cost - MTD Month to date estimate at completion cost amount
in the original forecast

7.53 Original EAC Labor Effort - MTD Month to date Estimate At Completion of Units of
labor used in the original version of the forecast

7.54 Original EAC Revenue - MTD Month to date estimate at completion (EAC)
revenue amount in the original revenue forecast
version

7.55 Current EAC Cost - QTD Quarter to date estimate at completion cost amount
in the current forecast version.

7.56 Current EAC Effort - QTD Quarter to date estimate at completion (EAC) effort
in the current forecast version

Metric Reference Guide  2-61


Project Analytics

No Metric Name Description

7.57 Current EAC Equipment Cost - QTD Quarter to date estimate at completion cost of
equipment in the current forecast version.

7.58 Current EAC Equipment Effort - QTD Quarter to date estimate at completion (EAC) units
of equipment in the current version of the forecast

7.59 Current EAC Labor Cost - QTD Quarter to date estimate at completion cost of labor
in the current forecast version.

7.60 Current EAC Labor Effort - QTD Quarter to date estimate at completion (EAC) units
of labor in the current version of the forecast

7.61 Current EAC Revenue - QTD Estimate at completion revenue amount in the
current revenue forecast version.

7.62 Original EAC Cost - QTD Quarter to date estimate at completion burdened
cost amount in the original cost forecast

7.63 Original EAC Effort - QTD Quarter to date estimate at completion (EAC) effort
in the original cost forecast version

7.64 Original EAC Equipment Cost - QTD Quarter to date estimate at completion cost of
equipment in the original forecast version.

7.65 Original EAC Equipment Effort - QTD Quarter to date Estimate At Completion of Units of
equipment used in the original version of the
forecast

7.66 Original EAC Labor Cost - QTD Quarter to date estimate at completion cost amount
in the original forecast

Metric Reference Guide  2-62


Project Analytics

No Metric Name Description

7.67 Original EAC Labor Effort - QTD Quarter to date Estimate At Completion of Units of
labor used in the original version of the forecast

7.68 Original EAC Revenue - QTD Quarter to date estimate at completion (EAC)
revenue amount in the original revenue forecast
version

7.69 Current EAC Cost - YTD Year to date estimate at completion cost amount in
the current forecast version.

7.70 Current EAC Effort - YTD Year to date estimate at completion (EAC) effort in
the current forecast version

7.71 Current EAC Equipment Cost - YTD Year to date estimate at completion cost of
equipment in the current forecast version.

7.72 Current EAC Equipment Effort - YTD Year to date estimate at completion (EAC) units of
equipment in the current version of the forecast

7.73 Current EAC Labor Cost - YTD Year to date estimate at completion cost of labor in
the current forecast version.

7.74 Current EAC Labor Effort - YTD Year to date estimate at completion (EAC) units of
labor in the current version of the forecast

7.75 Current EAC Revenue - YTD Estimate at completion revenue amount in the
current revenue forecast version.

7.76 Original EAC Cost - YTD Year to date estimate at completion burdened cost
amount in the original cost forecast

7.77 Original EAC Effort - YTD Year to date estimate at completion (EAC) effort in
the original cost forecast version

Metric Reference Guide  2-63


Project Analytics

No Metric Name Description

7.78 Original EAC Equipment Cost - YTD Year to date estimate at completion cost of
equipment in the original forecast version.

7.79 Original EAC Equipment Effort - YTD Year to date Estimate At Completion of Units of
equipment used in the original version of the
forecast

7.80 Original EAC Labor Effort - YTD Year to date Estimate At Completion of Units of
labor used in the original version of the forecast

7.81 Original EAC Labor Raw Cost - YTD Year to date estimate at completion cost amount in
the original forecast

7.82 Original EAC Revenue - YTD Year to date estimate at completion (EAC) revenue
amount in the original revenue forecast version

2.8 Project – Funding

No Metric Name Description

8.1 Cancelled Contract Amount - ITD Inception to date amount on project based contract
lines on canceled contracts. 'This metric is only
available in Contract Currency and Global Currency
preferences. It is not available in Project and Local
Currency Preference'.

Metric Reference Guide  2-64


Project Analytics

No Metric Name Description

8.2 Contract Amount - ITD Inception to date amount on project based contract
lines. 'This metric is only available in Contract
Currency and Global Currency preferences. It is not
available in Project and Local Currency Preference'.

8.3 Expired Contract Amount - ITD Expired Contract Amount - ITD 'This metric is only
available in Contract Currency and Global Currency
preferences. It is not available in Project and Local
Currency Preference'.

8.4 External Contract Amount - ITD Inception to date amount on project based contract
lines related to external customers. 'This metric is only
available in Contract Currency and Global Currency
preferences. It is not available in Project and Local
Currency Preference'.

8.5 Intercompany Contract Amount - Inception to date amount on project based contract
ITD lines related to intercompany contracts. 'This metric is
only available in Contract Currency and Global
Currency preferences. It is not available in Project
and Local Currency Preference'.

8.6 Interproject Contract Amount - ITD Inception to date amount on project based contract
lines related to interproject contracts. 'This metric is
only available in Contract Currency and Global
Currency preferences. It is not available in Project
and Local Currency Preference'.

8.7 Cancelled Contract Amount - MTD The total amount of project based contract lines on
canceled contracts.

Metric Reference Guide  2-65


Project Analytics

No Metric Name Description

8.8 Contract Amount - MTD Month to date amount on project based contract lines.

8.9 Expired Contract Amount - MTD Expired Contract Amount - MTD

8.10 External Contract Amount - MTD Month to date amount on project based contract lines
related to external customers

8.11 Intercompany Contract Amount - Month to date amount on project based contract lines
MTD related to intercompany contracts

8.12 Interproject Contract Amount - MTD Month to date amount on project based contract lines
related to interproject contracts

8.13 Cancelled Contract Amount - QTD Quarter to date amount on project based contract
lines on canceled contracts.

8.14 Contract Amount - QTD Quarter to date amount on project based contract
lines.

8.15 Expired Contract Amount - QTD Expired Contract Amount - QTD

8.16 External Contract Amount - QTD Quarter to date amount on project based contract
lines related to external customers

8.17 Intercompany Contract Amount - Quarter to date amount on project based contract
QTD lines related to intercompany contracts

8.18 Interproject Contract Amount - QTD Quarter to date amount on project based contract
lines related to interproject contracts

Metric Reference Guide  2-66


Project Analytics

No Metric Name Description

8.19 Cancelled Contract Amount - YTD Year to date amount on project based contract lines
on canceled contracts.

8.20 Contract Amount - YTD Year to date amount on project based contract lines.

8.21 Expired Contract Amount - YTD Expired Contract Amount - YTD

8.22 External Contract Amount - YTD Year to date amount on project based contract lines
related to external customers

8.23 Intercompany Contract Amount - Year to date amount on project based contract lines
YTD related to intercompany contracts

8.24 Interproject Contract Amount - YTD Year to date amount on project based contract lines
related to interproject contracts

8.25 # of Canceled Contracts The total number of project based contract lines on
canceled contracts.

8.26 # of Closed Contracts The number of contracts that have been closed

8.27 # of Contracts Total number of contracts with project based contract


lines
8.28 # of Contracts on Hold The number of contracts that are on hold

8.29 # of Expired Agreements The total number of project based contract lines
whose end date has passed.

8.30 # of Expired Contracts The total number of project based contract lines
whose end date has passed.

Metric Reference Guide  2-67


Project Analytics

No Metric Name Description

8.31 # of External Contracts Total number of contracts with project based contract
lines and related to external customers

8.32 # of Intercompany Contracts Total number of contracts with project based contract
lines on intercompany contracts

8.33 # of Interproject Contracts Total number of contracts with project based contract
lines on interproject contracts

8.34 # of Projects with Additional Funding The number of projects that have been associated
with at least one contract.

8.35 # of Projects with Cancelled Funding The number of projects that have been associated
with at least one contract.

8.36 # of Projects with Contract Funding The number of projects that have been associated
with at least one contract.

8.37 # of Projects with Funding The number of projects that have been associated
Adjustments with at least one contract.

8.38 # of Projects with Initial Funding The number of projects that have been associated
with at least one contract.

8.39 # of Tasks with Additional Funding The number of tasks that have been associated with
at least one contract.

8.40 # of Tasks with Cancelled Funding The number of tasks that have been associated with
at least one contract.

8.41 # of Tasks with Contract Funding The number of tasks that have been associated with
at least one contract.

8.42 # of Tasks with Funding The number of tasks that have been associated with
Adjustments at least one contract.

8.43 # of Tasks with Initial Funding The number of tasks that have been associated with
at least one contract.

8.44 # of Unexpired Agreements The number of contracts that have not reached their
end date.

Metric Reference Guide  2-68


Project Analytics

No Metric Name Description

8.45 # of Unexpired Contracts The number of contracts that have not reached their
end date.
8.46 # of Unexpired External Contracts The number of contracts with external customers that
have not reached their end date.

8.47 # of Unexpired Intercompany The number of intercompany contracts that have not
Contracts reached their end date.

8.48 # of Unexpired Interproject The number of interproject contracts that have not
Contracts reached their end date.

8.49 Cancelled Contract Amount The total amount of project based contract lines on
cancelled contracts.

8.50 Contract Amount Total amount on project based contract lines.

8.51 Expired Contract Amount Expired Contract Amount

8.52 External Contract Amount The total amount of project based contract lines on
contracts with external customers.

Metric Reference Guide  2-69


Project Analytics

No Metric Name Description

8.53 Intercompany Contract Amount The total amount of project based contract lines on
intercompany contracts.

8.54 Interproject Contract Amount The total amount of project based contract lines on
interproject contracts.

8.55 % Backlog Amount 100* (Backlog Amount)/Funding Amount

8.56 Additional Funding Amount Amount of Funding Allocated to a project in addition to


original funding.

8.57 Adjustment Funding Amount Amount of Adjusted Funding Amount. Adjustments


might be in the form of corrections, revaluations and
transfers

8.58 Backlog Amount (Funding Amount - Revenue Amount)

8.59 Baselined Amount Amount of funding allocated to a project which has


been baselined. Only Baselined Amount can be used
for Revenue or Invoice Generation

8.60 Cancelled Funding Amount Amount of Funding Allocated to a project which is


cancelled subsequently.

8.61 Funding Amount The total amount of project based contract lines

Metric Reference Guide  2-70


Project Analytics

No Metric Name Description

8.62 Initial Funding Amount Amount of proposed/planned Funding to be given


initially to perform a project or a task.

8.63 Invoice Amount Total amount of all invoices.


8.64 Not Allocated Amount (Contract Amount - Funding Amount)

8.65 Realized Gains Amount The amount realized gains debit by the draft revenue

8.66 Realized Losses Amount The amount realized losses credited by the draft
revenue
8.67 Revenue Amount Amounts recognized as income or expected billing to
be received for work on a project

8.68 Unbaselined Amount Amount of Funding Allocated to a project which has


not been baselined. This amount can't be used for
revenue or invoice generation.

8.69 # of Tasks - ITD Number of distinct tasks with an Invoice Distribution


Line since the Project inception

8.70 % Backlog Amount - ITD 100* (Backlog Amount ITD)/Funding Amount ITD

8.71 Additional Funding Amount - ITD Amount of Funding Allocated to a project in addition to
original funding ITD

8.72 Adjustment Funding Amount - ITD Amount of Adjusted Funding Amount. Adjustments
might be in the form of corrections, revaluations and
transfers - ITD

8.73 Backlog Amount - ITD (Funding Amount ITD - Revenue Amount ITD)

8.74 Cancelled Funding Amount - ITD Amount of Funding Allocated to a project which is
cancelled subsequently ITD

Metric Reference Guide  2-71


Project Analytics

No Metric Name Description

8.75 Funding Amount - ITD Inception to date value of project based contract lines
associated to the selected project or projects

8.76 Initial Funding Amount - ITD Amount of proposed/planned Funding to be given


initially to perform a project or a task ITD

8.77 Invoice Amount - ITD Inception to date total invoice amount.

8.78 Not Allocated Amount - ITD Not Allocated Amount - ITD

8.79 Realized Gains Amount - ITD The amount realized gains debit by the draft revenue
ITD
8.80 Realized Losses Amount - ITD The amount realized gains debit by the draft revenue -
ITD
8.81 Revenue Amount - ITD Amounts recognized as income or expected billing to
be received for work on a project since project
inception until the current date

8.82 % Backlog Amount - MTD 100* (Backlog Amount MTD)/Funding Amount MTD

8.83 Additional Funding Amount - MTD Amount of Funding Allocated to a project in addition to
original funding MTD

8.84 Adjustment Funding Amount - MTD Amount of Adjusted Funding Amount. Adjustments
might be in the form of corrections, revaluations and
transfers MTD

Metric Reference Guide  2-72


Project Analytics

No Metric Name Description

8.85 Backlog Amount - MTD (Funding Amount MTD - Revenue Amount MTD)

8.86 Cancelled Funding Amount - MTD Amount of Funding Allocated to a project which is
cancelled subsequently MTD

8.87 Funding Amount - MTD Month to date value of project based contract lines
associated to the selected project or projects

8.88 Initial Funding Amount - MTD Amount of proposed/planned Funding to be given


initially to perform a project or a task MTD

8.89 Invoice Amount - MTD Month to date total invoice amount.

8.90 Not Allocated Amount - MTD Not Allocated Amount - MTD

8.91 Realized Gains Amount - MTD The amount realized gains debit by the draft revenue
MTD
8.92 Realized Losses Amount - MTD The amount realized gains debit by the draft revenue -
MTD
8.93 Revenue Amount - MTD Amounts recognized as income or expected billing to
be received for work on a project during the selected
period until the current date

8.94 % Backlog Amount - QTD 100* (Backlog Amount QTD)/Funding Amount QTD

Metric Reference Guide  2-73


Project Analytics

No Metric Name Description

8.95 Additional Funding Amount - QTD Amount of Funding Allocated to a project in addition to
original funding QTD

8.96 Adjustment Funding Amount - QTD Amount of Adjusted Funding Amount. Adjustments
might be in the form of corrections, revaluations and
transfers QTD

8.97 Backlog Amount - QTD (Funding Amount QTD - Revenue Amount QTD)

8.98 Cancelled Funding Amount - QTD Amount of Funding Allocated to a project which is
cancelled subsequently QTD

8.99 Funding Amount - QTD Quarter to date value of project based contract lines
associated to the selected project or projects

8.100 Initial Funding Amount - QTD Amount of proposed/planned Funding to be given


initially to perform a project or a task QTD

8.101 Invoice Amount - QTD Quarter to date total invoice amount.

8.102 Not Allocated Amount - QTD Not Allocated Amount - QTD

8.103 Realized Gains Amount - QTD The amount realized gains debit by the draft revenue
QTD
8.104 Realized Losses Amount - QTD The amount realized gains debit by the draft revenue -
QTD

Metric Reference Guide  2-74


Project Analytics

No Metric Name Description

8.105 Revenue Amount - QTD Amounts recognized as income or expected billing to


be received for work on a project during the selected
quarter until the current date

8.106 % Backlog Amount - YTD 100* (Backlog Amount YTD)/Funding Amount YTD

8.107 Additional Funding Amount - YTD Amount of Funding Allocated to a project in addition to
original funding YTD

8.108 Adjustment Funding Amount - YTD Amount of Adjusted Funding Amount. Adjustments
might be in the form of corrections, revaluations and
transfers YTD

8.109 Backlog Amount - YTD 100* (Backlog Amount YTD)/Funding Amount YTD

8.110 Cancelled Funding Amount - YTD Amount of Funding Allocated to a project which is
cancelled subsequently YTD

8.111 Funding Amount - YTD Year to date value of project based contract lines
associated to the selected project or projects

8.112 Initial Funding Amount - YTD Amount of proposed/planned Funding to be given


initially to perform a project or a task YTD

8.113 Invoice Amount - YTD Year to date total invoice amount.


8.114 Not Allocated Amount - YTD Not Allocated Amount - YTD

Metric Reference Guide  2-75


Project Analytics

No Metric Name Description

8.115 Realized Gains Amount - YTD The amount realized gains debit by the draft revenue
YTD
8.116 Realized Losses Amount - YTD The amount realized gains debit by the draft revenue -
YTD
8.117 Revenue Amount - YTD Amounts recognized as income or expected billing to
be received for work on a project during the selected
year until the current date

2.9 Project – Grants Management –Award Analysis

No Metric Name Description

9.1 Number of Keywords The number of keywords associated with the award or
award project.

9.2 # of Projects # of Projects

9.3 # of Resources # of Resources

2.10 Project – Grants Management –Award Funding

No Metric Name Description

10.1 # of Awards Count of Awards for a given condition (e.g.How many


awards have each PI in our areabeen awarded this
year?). This is an important metric to measure
performance and risk.Regardless of award amount
totals, the more awards a PI gets, the better is his
situation and performance.

Metric Reference Guide  2-76


Project Analytics

No Metric Name Description

10.2 Award Direct Funding Amount Funding amount discounting the burden amount
granted by the sponsor

10.3 Award Indirect Funding Amount Burden amount granted by the sponsor as part of
funding amount

10.4 Award Total Funding Amount Total of the direct and indirect amount granted for the
award.

10.5 Average Award Amount Average Award Amount

10.6 Organization Credit Amount A portion of the funding amount that an organization
receives based on the credit percentage assigned to
the organization

10.7 Internal Direct Amount Share of the institution to fund the direct cost

10.8 Internal Indirect Amount Share of the institution to fund the indirect cost
(Facilities and Administration)

10.9 Internal Amount This is the total award amount provided by internal
source (both Internal and overhead cost for F&A )

10.10 Internal Amount % Percentage of total award amount provided by internal


source (both Internal and overhead cost for F&A )

10.11 # of Awards - ITD Count of Awards for a given condition since inception.

10.12 Award Direct Funding Amount - ITD Funding amount discounting the burden amount
granted by the sponsor

Metric Reference Guide  2-77


Project Analytics

No Metric Name Description

10.13 Award Indirect Funding Amount - Burden amount granted by the sponsor as part of
ITD funding amount

10.14 Award Total Funding Amount - ITD Total of the direct and indirect amount granted for the
award.

10.15 Average Award Amount - ITD Average Award Amount, since inception.

10.16 Organization Credit Amount - ITD A portion of the funding amount that an organization
receives based on the credit percentage assigned to
the organization

10.17 Internal Direct Amount - ITD Share of the institution to fund the direct cost, since
Inception.

10.18 Internal Indirect Amount - ITD Share of the institution to fund the indirect cost
(Facilities and Administration), since Inception.

10.19 Internal Amount - ITD This is the total award amount provided by internal
source (both Internal and overhead cost for F&A ),
since inception.
10.20 Internal Amount % - ITD Percentage of total award amount provided by internal
source (both Internal and overhead cost for F&A ),
since inception.

10.21 # of Awards - YTD Year-To-Date Count of Awards for a given condition .

10.22 Award Direct Funding Amount - YTD Funding amount discounting the burden amount
granted by the sponsor

10.23 Award Indirect Funding Amount - Burden amount granted by the sponsor as part of
YTD funding amount

Metric Reference Guide  2-78


Project Analytics

No Metric Name Description

10.24 Award Total Funding Amount - YTD Total of the direct and indirect amount granted for the
award.

10.25 Average Award Amount - YTD Year-To-date Average Award Amount.

10.26 Organization Credit Amount - YTD A portion of the funding amount that an organization
receives based on the credit percentage assigned to
the organization

10.27 Internal Direct Amount - YTD Year-To-Date Share of the institution to fund the direct
cost.

10.28 Internal Indirect Amount - YTD Year-To-Date Share of the institution to fund the
indirect cost (Facilities and Administration).

10.29 Internal Amount - YTD Year-To-Date total award amount provided by internal
source (both Internal and overhead cost for F&A).

10.30 Internal Amount % - YTD Year-To-Date percentage of total award amount


provided by internal source (both Internal and
overhead cost for F&A).

10.31 # of Awards - YAGO Year Ago Count of Awards for a given condition .

10.32 Award Direct Funding Amount - Funding amount discounting the burden amount
YAGO granted by the sponsor

10.33 Award Indirect Funding Amount - Burden amount granted by the sponsor as part of
YAGO funding amount

10.34 Award Total Funding Amount - Total of the direct and indirect amount granted for the
YAGO award.

Metric Reference Guide  2-79


Project Analytics

No Metric Name Description

10.35 Average Award Amount - YAGO Year Ago Average Award Amount.

10.36 Organization Credit Amount - YAGO A portion of the funding amount that an organization
receives based on the credit percentage assigned to
the organization

10.37 Internal Direct Amount - YAGO Year Ago Share of the institution to fund the direct
cost.

10.38 Internal Indirect Amount - YAGO Year Ago Share of the institution to fund the indirect
cost (Facilities and Administration).

10.39 Internal Amount - YAGO Year Ago total award amount provided by internal
source (both Internal and overhead cost for F&A).

10.40 Internal Amount % - YAGO Year Ago percentage of total award amount provided
by internal source (both Internal and overhead cost for
F&A).

10.41 # of Awards – Previous year Previous year Variance of Count of Awards for a given
Variance condition .

10.42 Award Direct Funding Amount - Funding amount discounting the burden amount
Previous year Variance granted by the sponsor

10.43 Award Indirect Funding Amount - Burden amount granted by the sponsor as part of
Previous year Variance funding amount

10.44 Award Total Funding Amount - Total of the direct and indirect amount granted for the
Previous year Variance award.

10.45 Average Award Amount - Previous Previous year Variance of Average Award Amount.
year Variance

Metric Reference Guide  2-80


Project Analytics

No Metric Name Description

10.46 Organization Credit Amount - A portion of the funding amount that an organization
Previous year Variance receives based on the credit percentage assigned to
the organization

10.47 Internal Direct Amount - Previous Previous year Variance of Share of the institution to
year Variance fund the direct cost.

10.48 Internal Indirect Amount - Previous Previous year Variance of Share of the institution to
year Variance fund the indirect cost (Facilities and Administration).

10.49 Internal Amount - Previous year Previous year Variance of total award amount
Variance provided by internal source (both Internal and
overhead cost for F&A).
10.50 Internal Amount % - Previous year Previous year Variance of percentage of total award
Variance amount provided by internal source (both Internal and
overhead cost for F&A).

2.11 Project – Performance

No Metric Name Description

11.1 # of Projects - ITD Number of projects with budgets since


inception

11.2 # of Tasks - ITD Number of distinct tasks with an Invoice


Distribution Line since the Project inception

11.3 Accepted Invoice Amount - ITD Amount of accepted invoices - ITD

11.4 Approved Invoice Amount - ITD Inception to date amount of approved


invoices.

11.5 Current Withheld Amount - ITD Inception to Date amount retained from the
original invoice, as part of a customer
agreement.

Metric Reference Guide  2-81


Project Analytics

No Metric Name Description

11.6 External Invoice Amount - ITD Inception to date amount of invoices billed to
external customers.

11.7 Intercompany Invoice Amount - ITD Inception to date amount of invoices billed to
intercompany contracts.

11.8 Interproject Invoice Amount - ITD Inception to date amount of invoices billed on
interproject contracts.

11.9 Invoice Amount - ITD Inception to date total invoice amount.

11.10 Retention Billed - ITD Inception to Date amount that has been
retained and billed as part of a customer
agreement.
11.11 Retention Write-off - ITD Inception to Date of Depreciated Billed
Retention Amount.
11.12 Total Retained Amount - ITD Inception to Date value retained from the
original invoice according to the customer
agreement and not billed yet.

11.13 Unapproved Invoice Amount - ITD Inception to date amount of unapproved


invoices.
11.14 Unbilled Receivables - ITD Inception to Date value of work done which
has not been billed yet

11.15 Unearned Revenue - ITD Inception to Date value of revenue recognized


for which the work has not been performed
yet.
11.16 Accepted Invoice Amount - MTD Amount of accepted invoices - MTD

11.17 Approved Invoice Amount - MTD Inception to date amount of approved


invoices.
11.18 Current Withheld Amount - MTD Month to Date amount retained from the
original invoice, as part of a customer
agreement.
11.19 External Invoice Amount - MTD Month to date amount of invoices billed to
external customers.
11.20 Intercompany Invoice Amount - MTD Month to date amount of invoices billed to
intercompany contracts.
11.21 Interproject Invoice Amount - MTD Month to date amount of invoices billed on
interproject contracts.
11.22 Invoice Amount - MTD Month to date total invoice amount.

11.23 Invoice Write-off Amount - MTD Month to date amount of write-off invoices.

Metric Reference Guide  2-82


Project Analytics

No Metric Name Description

11.24 Retention Billed - MTD Month to Date amount that has been retained
and billed as part of a customer agreement.

11.25 Retention Write-off - MTD Month to Date value of Depreciated Billed


Retention Amount.

11.26 Total Retained Amount - MTD Month to Date value retained from the original
invoice according to the customer agreement
and not billed yet.

11.27 Unapproved Invoice Amount - MTD Month to date amount of unapproved invoices.

11.28 Unbilled Receivables - MTD Month to Date value of work done which has
not been billed yet
11.29 Unearned Revenue - MTD Month to Date value of revenue recognized for
which the work has not been performed yet.

11.30 Accepted Invoice Amount - QTD Amount of accepted invoices - QTD

11.31 Approved Invoice Amount - QTD Quarter to date amount of approved invoices.

11.32 Current Withheld Amount - QTD Quarter to Date amount retained from the
original invoice, as part of a customer
agreement.
11.33 External Invoice Amount - QTD Quarter to date amount of invoices billed to
external customers.
11.34 Intercompany Invoice Amount - QTD Quarter to date amount of invoices billed to
intercompany contracts.
11.35 Interproject Invoice Amount - QTD Quarter to date amount of invoices billed on
interproject contracts.
11.36 Invoice Amount - QTD Quarter to date total invoice amount.

11.37 Invoice Write-off Amount - QTD Quarter to date amount of write-off invoices.

11.38 Retention Billed - QTD Quarter to Date amount that has been
retained and billed as part of a customer
agreement.
11.39 Retention Write-off - QTD Quarter to Date value of Depreciated Billed
Retention Amount.

11.40 Total Retained Amount - QTD Quarter to Date value retained from the
original invoice according to the customer
agreement and not billed yet.

Metric Reference Guide  2-83


Project Analytics

No Metric Name Description

11.41 Unapproved Invoice Amount - QTD Quarter to date amount of unapproved


invoices.
11.42 Unbilled Receivables - QTD Quarter to Date value of work done which has
not been billed yet

11.43 Unearned Revenue - QTD Quarter to Date value of revenue recognized


for which the work has not been performed
yet.
11.44 Accepted Invoice Amount - YTD Amount of accepted invoices - YTD

11.45 Approved Invoice Amount - YTD Year to date amount of approved invoices.

11.46 Current Withheld Amount - YTD Year to Date amount retained from the original
invoice, as part of a customer agreement.

11.47 External Invoice Amount - YTD Year to date amount of invoices billed to
external customers.
11.48 Intercompany Invoice Amount - YTD Year to date amount of invoices billed to
intercompany contracts.
11.49 Interproject Invoice Amount - YTD Year to date amount of invoices billed on
interproject contracts.
11.50 Invoice Amount - YTD Year to date total invoice amount.
11.51 Invoice Write-off Amount - YTD Year to date amount of write-off invoices.

11.52 Retention Billed - YTD Year to Date amount that has been retained
and billed as part of a customer agreement.

11.53 Retention Write-off - YTD Year to Date value of Depreciated Billed


Retention Amount.
11.54 Total Retained Amount - YTD Year to Date value retained from the original
invoice according to the customer agreement
and not billed yet.

11.55 Unapproved Invoice Amount - YTD Year to date amount of unapproved invoices.

11.56 Unbilled Receivables - YTD Year to Date value of work done which has
not been billed yet
11.57 Unearned Revenue - YTD Year to Date value of revenue recognized for
which the work has not been performed yet.

11.58 # of Projects - ITD Number of projects with budgets since


inception

Metric Reference Guide  2-84


Project Analytics

No Metric Name Description

11.59 Current Budget Cost - ITD Inception to date cost amount in the current
version of the budget

11.60 Current Budget Equipment Cost - ITD Inception to date amount of equipment cost in
the current version of the budget.

11.61 Current Budget Labor Cost - ITD Inception to date amount of labor cost in the
current version of the budget.

11.62 Current Budget Margin - ITD Inception to date difference between the
revenue and the costs in the current budget

11.63 Current Budget Margin Percent - ITD Inception to date difference between the
revenue and the costs divided by revenue in
the current budget

11.64 Current Budget Revenue - ITD Inception to date revenue amount in the
current version of the budget.

11.65 Current Revenue Variance % - ITD 100*(Revenue ITD - Current Budget Revenue
ITD)/ ( Current Budget Revenue ITD)

11.66 Original Budget Cost - ITD Inception to date cost amount in the original
version of the budget.

11.67 Original Budget Equipment Cost - ITD Inception to date cost of equipment in the
original version of the budget.

11.68 Original Budget Labor Cost - ITD Inception to date amount of labor cost in the
original version of the budget.

11.69 Original Budget Margin - ITD Inception to date difference between revenue
and cost in the original version of the budget

Metric Reference Guide  2-85


Project Analytics

No Metric Name Description

11.70 Original Budget Margin Percent - ITD Inception to date difference between the
revenue and the costs divided by revenue in
the original budget

11.71 Original Budget Revenue - ITD Inception to date revenue amount in the
original version of the budget.

11.72 Remaining Budget - ITD (Current Budget Cost ITD - Cost ITD)

11.73 Remaining Budget % ITD (Current Budget Cost ITD - Cost ITD)/Current
Budget Cost ITD.
11.74 Current Budget Cost - MTD Month to date cost amount in the current
version of the budget

11.75 Current Budget Margin - MTD Month to date difference between the revenue
and the costs in the current budget

11.76 Current Budget Margin Percent - MTD Month to date difference between the revenue
and the costs divided by revenue in the
current budget

11.77 Current Budget Revenue - MTD Month to date revenue amount in the current
version of the budget.

11.78 Original Budget Cost - MTD Month to date cost amount in the original
version of the budget.

11.79 Original Budget Margin - MTD Month to date difference between revenue
and cost in the original version of the budget

Metric Reference Guide  2-86


Project Analytics

No Metric Name Description

11.80 Original Budget Margin Percent - MTD Month to date difference between the revenue
and the costs divided by revenue in the
original budget

11.81 Original Budget Revenue - MTD Month to date revenue amount in the original
version of the budget.

11.82 Current Budget Cost - QTD Quarter to date cost amount in the current
version of the budget

11.83 Current Budget Margin - QTD Quarter to date difference between the
revenue and the costs in the current budget

11.84 Current Budget Margin Percent - QTD Quarter to date difference between the
revenue and the costs divided by revenue in
the current budget

11.85 Current Budget Revenue - QTD Quarter to date revenue amount in the current
version of the budget.

11.86 Original Budget Cost - QTD Month to date cost amount in the original
version of the budget.

11.87 Original Budget Margin - QTD Quarter to date difference between revenue
and cost in the original version of the budget

11.88 Original Budget Margin Percent - QTD Quarter to date difference between the
revenue and the costs divided by revenue in
the original budget

11.89 Original Budget Revenue - QTD Quarter to date revenue amount in the original
version of the budget.

Metric Reference Guide  2-87


Project Analytics

No Metric Name Description

11.90 Current Budget Cost - YTD Year to date cost amount in the current
version of the budget

11.91 Current Budget Margin - YTD Year to date difference between the revenue
and the costs in the current budget

11.92 Current Budget Margin Percent - YTD Year to date difference between the revenue
and the costs divided by revenue in the
current budget

11.93 Current Budget Revenue - YTD Year to date revenue amount in the current
version of the budget.

11.94 Original Budget Cost - YTD Year to date cost amount in the original
version of the budget.

11.95 Original Budget Margin - YTD Year to date difference between revenue and
cost in the original version of the budget

11.96 Original Budget Margin Percent - YTD Year to date difference between the revenue
and the costs divided by revenue in the
original budget

11.97 Original Budget Revenue - YTD Year to date revenue amount in the original
version of the budget.

11.98 Cost MAGO Cost amount in the month previous to that


selected by the user

11.99 Cost QAGO Cost amount in the quarter previous to that


selected by the user

11.100 Cost YAGO Cost amount in the year previous to that


selected by the user

Metric Reference Guide  2-88


Project Analytics

No Metric Name Description

11.101 Equipment Cost MAGO Equipment cost amount in the month previous
to that selected by the user

11.102 Equipment Cost QAGO Equipment cost amount in the quarter


previous to that selected by the user

11.103 Equipment Cost YAGO Equipment cost amount in the year previous
to that selected by the user

11.104 Equipment Effort MAGO Total units (time or quantity) of equipment


used. Month ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

11.105 Equipment Effort QAGO Total units (time or quantity) of equipment


used. Quarter ago Equipment expenditure
items result from multiplying units by the
corresponding usage rate

11.106 Equipment Effort YAGO Total units (time or quantity) of equipment


used. Year ago Equipment expenditure items
result from multiplying units by the
corresponding usage rate

11.107 Labor Cost MAGO Labor cost amount in the month previous to
that selected by the user

11.108 Labor Cost QAGO Labor cost amount in the month previous to
that selected by the user

11.109 Labor Cost YAGO Labor cost amount in the month previous to
that selected by the user

11.110 Labor Effort MAGO Units of labor used month ago. People
expenditure items result from multiplying units
by the corresponding usage rate

11.111 Labor Effort QAGO Units of labor used quarter ago. People
expenditure items result from multiplying units
by the corresponding usage rate

11.112 Labor Effort YAGO Units of labor used year ago. People
expenditure items result from multiplying units
by the corresponding usage rate

Metric Reference Guide  2-89


Project Analytics

No Metric Name Description

11.113 ----------------Quarter Ago Metrics----------------


----
11.114 # of Projects - ITD Number of projects with budgets since
inception

11.115 # of Tasks - ITD Number of distinct tasks with an Invoice


Distribution Line since the Project inception

11.116 Billable Cost - ITD Inception to date cost amount of transactions


that are billable
11.117 Budget Cost % Spent - ITD 100 * Cost ITD / Current Budget Cost ITD

11.118 Burden Cost - ITD Inception to date expenditure items not


directly attributed to work performed, such as
fringe benefits and office space.

11.119 Capitalizable Cost - ITD Inception to date capitalizable cost

11.120 Cost - ITD Inception-to-date cost amount

11.121 Cost Variance - ITD (Actual Cost ITD – Current Cost Budget ITD)

11.122 Cost Variance % - ITD 100*(Cost ITD - Current Budget Cost


ITD)/Current Budget Cost - ITD

11.123 Equipment Cost - ITD Inception to date amount of cost related to the
use of equipment

11.124 Equipment Effort - ITD Inception to date units of equipment used

11.125 Forecast Cost Variance - ITD (Current EAC Cost ITD – Current Budget Cost
ITD)

11.126 Labor Cost - ITD Inception to date amount of cost related to the
use of labor

Metric Reference Guide  2-90


Project Analytics

No Metric Name Description

11.127 Labor Effort - ITD Units of labor used. People expenditure items
result from multiplying units by the
corresponding usage rate

11.128 Nonbillable Cost - ITD Inception to Date raw and burdened costs not
flagged as billable

11.129 Raw Cost - ITD Inception to Date cost directly attributable to


work performed approved in the current
version of the budget

11.130 Billable Cost - MTD Month to date cost amount of transactions that
are billable
11.131 Capitalizable Cost - MTD Month to date capitalizable cost

11.132 Cost - MTD Month-to-date cost amount

11.133 Equipment Cost - MTD Month to date amount of cost related to the
use of equipment

11.134 Equipment Effort - MTD Month to date units of equipment used

11.135 Labor Cost - MTD Month to date amount of cost related to the
use of labor
11.136 Labor Effort - MTD Month to date units (time or quantity) of labor
used
11.137 Nonbillable Cost - MTD Month to Date raw and burdened costs not
flagged as billable
11.138 Billable Cost - QTD Quarter to date cost amount of transactions
that are billable
11.139 Capitalizable Cost - QTD Quarter to date capitalizable cost

11.140 Cost - QTD Quarter-to-date cost amount

11.141 Equipment Cost - QTD Quarter to date amount of cost related to the
use of equipment

11.142 Equipment Effort - QTD Quarter to date units of equipment used

11.143 Labor Cost - QTD Quarter to date amount of cost related to the
use of labor

Metric Reference Guide  2-91


Project Analytics

No Metric Name Description

11.144 Labor Effort - QTD Quarter to date units (time or quantity) of labor
used
11.145 Nonbillable Cost - QTD Quarter to Date raw and burdened costs not
flagged as billable
11.146 Billable Cost - YTD Year to date cost amount of transactions that
are billable
11.147 Budget Cost % Spent - YTD 100 * Cost YTD / Current Budget Cost YTD

11.148 Capitalizable Cost - YTD Year to date capitalizable cost

11.149 Cost - YTD Year-to-date cost amount

11.150 Equipment Cost - YTD Year to date amount of cost related to the use
of equipment

11.151 Equipment Effort - YTD Year to date units of equipment used

11.152 Labor Cost - YTD Year to date amount of cost related to the use
of labor
11.153 Labor Effort - YTD Year to date units (time or quantity) of labor
used
11.154 Nonbillable Cost - YTD Year to Date raw and burdened costs not
flagged as billable
11.155 Difference Current to Budget Margin % Margin % - Current Budget Margin %. This is
the different in percent points between the
actual margin % and the margin % in the
current budget.

11.156 Difference Current to Budget Margin % - ITD Margin % ITD - Current Budget Margin % ITD.
This is the different in percent points between
the actual margin % ITD and the margin% ITD
in the current budget.

11.157 Margin - YTD Revenue YTD - Cost YTD

11.158 Margin % - ITD 100*(Revenue ITD - Cost ITD) /Revenue ITD

11.159 Margin % - YTD 100*(Revenue YTD - Cost YTD )/(Revenue


YTD)
11.160 Margin Variance - ITD Margin ITD - Current Budget Margin ITD

Metric Reference Guide  2-92


Project Analytics

No Metric Name Description

11.161 Margin Variance % 100*(Margin - Current Budget Margin


)/(Current Budget Margin)
11.162 Margin Variance % - ITD 100*(Margin ITD - Current Budget Margin ITD
)/(Current Budget Margin ITD)

11.163 Project Health Based on Cost Project shown as 'Critical' if Cost Variance %
>= 30, 'On Track' if Cost Variance %" < 0 and
'At Risk' if Cost Variance % if between 30 and
0

11.164 Project Health Based on Margin Project shown as 'On Track' if Margin % >=
30, 'Critical' if Margin %" < 0 and 'At Risk' if
Cost Variance % if between 30 and 0

11.165 # of Projects Number of distinct projects with budgets.

11.166 # of Tasks Number of distinct tasks that have been


included on invoices.
11.167 Accepted Invoice Amount Amount of invoices with status =
"ACCEPTED"
11.168 Approved Invoice Amount Total amount of approved invoices.

11.169 Current Withheld Amount Part of the original invoice which has been
retained as part of the customer agreement.

11.170 External Invoice Amount Total amount of the invoices billed to external
customers.
11.171 Intercompany Invoice Amount Total amount of the invoices billed to
intercompany contracts.
11.172 Interproject Invoice Amount Total amount of the invoices billed on
interproject contracts.
11.173 Invoice Amount Total amount of all invoices.
11.174 Invoice Write-off Amount Total amount of write-off invoices.

11.175 Retention Billed Amount that has been retained and billed as
part of a customer agreement.

11.176 Retention Write-off Depreciated Billed Retention Amount.

Metric Reference Guide  2-93


Project Analytics

No Metric Name Description

11.177 Total Retained Amount Part of the original invoice which has been
retained according to the customer agreement
and not billed yet. Invoice retention is used to
reduce a project invoice by a percentage
amount that you specify for a particular
project. It applies to both expendit...

11.178 Unapproved Invoice Amount Total amount of unapproved invoices.

11.179 Unbilled Receivables Value of work done which has not been billed
yet
11.180 Unearned Revenue Value of revenue recognized for which the
work has not been performed yet.

11.181 # of Projects Number of distinct projects with budgets.

11.182 Current Budget Billable Cost Amount of billable cost in the current version
of the budget.

11.183 Current Budget Capitalizable Cost Amount of capitalizable cost in the current
version of the budget.

11.184 Current Budget Cost Cost amount in the current version of the
budget

11.185 Current Budget Equipment Cost Amount of equipment cost in the current
version of the budget.

11.186 Current Budget Labor Cost Amount of labor cost in the current version of
the budget.

11.187 Current Budget Labor Effort Units of labor cost in the current version of the
budget.
11.188 Current Budget Margin Difference between the revenue and the costs
in the current budget

Metric Reference Guide  2-94


Project Analytics

No Metric Name Description

11.189 Current Budget Margin Percentage Difference between the revenue and the costs
divided by cost in the current budget

11.190 Current Budget Revenue Revenue budget amount in the current version
of the budget.
11.191 Current Revenue Variance % 100*(Revenue - Current Budget Revenue)/ (
Current Budget Revenue)

11.192 Labor Effort Spent % 100*(Units of labor used/ Total units of labor
included in the current version of the budget)

11.193 Original Budget Billable Cost Amount of billable cost in the current version
of the budget.

11.194 Original Budget Capitalizable Cost Amount of capitalizable cost in the original
version of the budget.

11.195 Original Budget Cost Cost amount in the original version of the
budget.

11.196 Original Budget Equipment Cost Cost of equipment in the original version of
the budget.

11.197 Original Budget Labor Cost Amount of labor cost in the original version of
the budget.

11.198 Original Budget Labor Effort Units of labor in the original version of the
budget
11.199 Original Budget Margin Difference between revenue and cost in the
original version of the budget

Metric Reference Guide  2-95


Project Analytics

No Metric Name Description

11.200 Original Budget Margin Percentage Difference between the revenue and the costs
divided by revenue in the original budget

11.201 Original Budget Revenue Revenue amount in the original version of the
budget.

11.202 % Cost Budget Committed 100 * Cost Including Commitments/Current


Budget Cost for the time period selected.

11.203 Cost Including Commitments Cost + Total Committed Cost


11.204 External Committed Cost Amount of external commitment transactions

11.205 External Committed Raw Cost Amount of raw cost of external commitment
transactions
11.206 Original Quantity Ordered Total number of units that have been ordered
and are committed
11.207 Purchase Order Committed Cost Purchase order commitment burdened cost,
including raw and burden costs, in user-
preferred currency. Raw costs are directly
attributable to work performed. Burden costs
are indirect costs such as overhead
allocations.

11.208 Purchase Order Committed Raw Cost Purchase order commitment raw cost in user-
preferred currency. Raw costs are directly
attributable to work performed.

11.209 Purchase Requisition Committed Cost Purchase requisition commitment burdened


cost, including raw and burden costs, in user-
preferred currency. Raw costs are directly
attributable to work performed. Burden costs
are indirect costs such as overhead
allocations.

11.210 Purchase Requisition Committed Raw Cost Purchase requisition commitment raw cost in
user-preferred currency. Raw costs are
directly attributable to work performed.

11.211 Quantity Cancelled Total number of units committed that have


been cancelled

Metric Reference Guide  2-96


Project Analytics

No Metric Name Description

11.212 Quantity Delivered Total number of units committed that have


been already delivered
11.213 Quantity Invoiced Total number of units committed that have
been already invoiced
11.214 Quantity Ordered Total number of units committed that have
been ordered
11.215 Quantity Outstanding Delivery Total number of units committed that have not
been delivered
11.216 Quantity Outstanding Invoice Total number of units committed that have not
been invoiced
11.217 Quantity Overbilled Total number of units committed that have
been overbilled
11.218 Raw Cost Including Commitments Raw Cost + Committed Raw Cost
11.219 Remaining Budget % Including (Current Budget Cost - Cost Including
Commitments Commitments)/Current Budget Cost

11.220 Remaining Budget Including Commitments Current Budget Cost - Cost Including
Commitments
11.221 Supplier Invoice Committed Cost Supplier invoice commitment burdened cost,
including raw and burden costs, in user-
preferred currency. Raw costs are directly
attributable to work performed. Burden costs
are indirect costs such as overhead
allocations.

11.222 Supplier Invoice Committed Raw Cost Supplier invoice commitment raw cost in user-
preferred currency. Raw costs are directly
attributable to work performed.

11.223 Total Commitment Quantity Total number of units committed. For


example, hours of labor committed in a
purchase order, purchase requisition or
supplier invoice

Metric Reference Guide  2-97


Project Analytics

No Metric Name Description

11.224 Total Committed Cost The sum of commitments from purchase


requisitions, purchase orders, supplier
invoices, and external commitments, including
raw and burden costs, in user-preferred
currency. Raw costs are directly attributable to
work performed. Burden costs are indirect
costs such as overhead allocations.

11.225 Total Committed Raw Cost The sum of raw cost commitments from
purchase requisitions, purchase orders,
supplier invoices, and external commitments
in user-preferred currency. Raw costs are
directly attributable to work performed.

11.226 # of Projects Number of distinct projects with budgets.

11.227 # of Tasks Number of distinct tasks that have been


included on invoices.
11.228 Billable Cost Cost flagged as billable as they result from
transactions that are chargeable and tasks
denoted as billable.

11.229 Budget Cost % Spent 100 * Cost / Current Budget Cost

11.230 Burden Cost Total of expenditure items not directly


attributed to work performed, such as fringe
benefits and office space.

11.231 Burden Cost % 100 * Burden cost / Cost


11.232 Capitalizable Cost Raw and burden costs from asset building
projects. These costs are posted to the asset's
balance account and remain there until the
asset is in service

11.233 Cost Total raw plus burden cost

11.234 Cost Variance (Actual Cost – Current Cost Budget)

Metric Reference Guide  2-98


Project Analytics

No Metric Name Description

11.235 Cost Variance % (Cost - Current Budget Cost)/Current Budget


Cost
11.236 Equipment Cost Amount of cost related to the use of
equipment
11.237 Equipment Effort Total units (time or quantity) of equipment
used. Equipment expenditure items result
from multiplying units by the corresponding
usage rate

11.238 Expenses % 100*(Cost - Capitalizable Cost)/Cost

11.239 Forecast Cost Variance Current EAC Cost – Current Budget Cost

11.240 Labor Cost Amount of cost related to the use of labor

11.241 Labor Cost % 100*(Labor Cost / Cost)


11.242 Labor Effort Units of labor used. People expenditure items
result from multiplying units by the
corresponding usage rate

11.243 Nonbillable Cost Raw and burden costs not flagged as billable
because the transactions are not chargeable
or the tasks where they were performed are
not denoted as billable.

11.244 Raw Cost Direct cost, such as raw salaries and travel
expenses.
11.245 Current Actual Cost Burdened cost amount in the current forecast
version

11.246 Current Actual Effort Actual effort in the current primary cost
forecast version
11.247 Current Actual Revenue Actual revenue amount in the current primary
revenue forecast version

11.248 Current EAC Cost Estimate at completion cost amount in the


current forecast version.

Metric Reference Guide  2-99


Project Analytics

No Metric Name Description

11.249 Current EAC Effort Estimate at completion effort in the current


forecast version. EAC equals actual effort +
remaining forecasted effort as required to
complete the project

11.250 Current EAC Equipment Cost Estimate at completion cost of equipment in


the current forecast version.

11.251 Current EAC Equipment Effort Estimate at completion (EAC) units of


equipment in the current version of the
forecast
11.252 Current EAC Labor Cost Estimate at completion cost of labor in the
current forecast version.

11.253 Current EAC Labor Effort Estimate at completion (EAC) units of labor in
the current version of the forecast

11.254 Current EAC Revenue Estimate at completion revenue amount in the


current revenue forecast version

11.255 Current ETC Cost Estimate to complete cost amount in the


current forecast version.

11.256 Current ETC Effort Estimate to complete effort in the current


primary forecast version.
11.257 Current ETC Equipment Cost Estimate to complete cost of equipment in the
current forecast version.

11.258 Current ETC Equipment Effort Estimate To Complete of Units of equipment


used in the current version of the forecast

11.259 Current ETC Labor Cost Estimate to complete cost of labor in the
current forecast version.

11.260 Current ETC Labor Effort Estimate To Complete of Units of labor used
in the current version of the forecast

Metric Reference Guide  2-100


Project Analytics

No Metric Name Description

11.261 Current ETC Revenue Estimated to complete revenue amount in the


current primary revenue forecast version

11.262 Difference Forecast to Budget Margin % Forecast Margin % - Current Budget Margin
%. This is the difference in percent points
between the forecasted and budgeted
margins.

11.263 Forecast Cost Variance % 100*(Current EAC Labor Effort - Current


Budget Labor Effort )/Current Budget Labor
Effort ITD
11.264 Forecast Labor Effort Variance % 100*(Current EAC Labor Effort - Current
Budget Labor Effort)/Current Budget Labor
Effort
11.265 Forecast Margin % Forecast Margin Amount multiply 100 and
divide by Current EAC Revenue

11.266 Forecast Margin Amount EAC revenue - EAC cost, in the current cost
forecast

11.267 Forecast Margin Variance % 100*(Forecast Margin-Current Budget Margin"


)/(Current Budget Margin)

11.268 Forecast Revenue Variance Current EAC Revenue - Current Budget


Revenue
11.269 Forecast Revenue Variance % 100*(Current EAC Revenue - Current Budget
Revenue )/Current Budget Revenue

11.270 Forecast to Budget Labor Effort Variance Current EAC Labor Effort - Current Budget
Labor Effort
11.271 Forecast to Budget Labor Effort Variance % 100*(Current EAC Labor Effort - Current
Budget Labor Effort)/Current Budget Labor
Effort
11.272 Original Actual Cost Actual burdened cost amount (Raw + burden
cost) in the original primary cost forecast
version
11.273 Original Actual Effort Actual effort in the original primary cost
forecast version
11.274 Original Actual Revenue Actual revenue amount in the original primary
revenue forecast version

Metric Reference Guide  2-101


Project Analytics

No Metric Name Description

11.275 Original EAC Cost Estimate at completion burdened cost amount


in the original cost forecast

11.276 Original EAC Effort Estimate at completion effort in the original


primary cost forecast version. EAC equals
actual effort + remaining forecasted effort as
required to complete the project

11.277 Original EAC Equipment Cost Estimate at completion cost of equipment in


the original forecast version.

11.278 Original EAC Equipment Effort Estimate At Completion of Units of equipment


used in the original version of the forecast

11.279 Original EAC Labor Cost Estimate at completion cost amount in the
original forecast

11.280 Original EAC Labor Effort Estimate At Completion of Units of labor used
in the original version of the forecast

11.281 Original EAC Revenue Estimate at completion revenue amount in the


original primary revenue forecast version

11.282 Original ETC Cost Estimate to complete burdened cost amount


in the original version of the forecast

11.283 Original ETC Effort Estimate to complete effort in the original


primary forecast version.
11.284 Original ETC Equipment Cost Estimate to complete cost of equipment in the
original version of the forecast

11.285 Original ETC Equipment Effort Estimate To Complete of Units of equipment


used in the original version of the forecast

Metric Reference Guide  2-102


Project Analytics

No Metric Name Description

11.286 Original ETC Labor Cost Estimate to complete cost of labor in the
original version of the forecast

11.287 Original ETC Labor Effort Estimate To Complete of units of labor used in
the original version of the forecast

11.288 Original ETC Revenue Estimated to complete revenue amount in the


original primary revenue forecast version

11.289 # of Projects Number of distinct projects with budgets.

11.290 # of Tasks Number of distinct tasks that have been


included on invoices.
11.291 Margin Difference between the project revenue and
burdened cost
11.292 Margin % Margin as a percentage of the accrued
revenue
11.293 Realized Gains Amount The amount realized gains debit by the draft
revenue
11.294 Realized Losses Amount The amount realized losses credited by the
draft revenue
11.295 Revenue Amount Amounts recognized as income or expected
billing to be received for work on a project

11.296 Revenue Quantity Number of Units (of Material or Hours) used


for this Revenue Distribution Line

11.297 Revenue Signed Backlog Difference between Funding Amount and


Revenue Amount for Project Contract Lines
with status 'ACTIVE' or 'EXPIRED'

11.298 Revenue Unsigned Backlog Difference between Funding Amount and


Revenue Amount for Project Contract Lines
with status 'DRAFT', 'PENDING
ACCEPTANCE', 'HOLD' or 'UNDER
AMENDMENT'

Metric Reference Guide  2-103


Project Analytics

No Metric Name Description

11.299 Unbilled Receivable Identifies the potential revenue amount of the


expenditure item to be charged to the GL
account, in chart of account/ group/ global
currency of the organization against which a
transaction is carried out, which is attributable
to the revenue generated as a...

11.300 Unearned Revenue Value of revenue recognized for which the


work has not been performed yet.

11.301 Actual Margin - ITD Inception to date difference between the


project revenue and burdened cost

11.302 Actual to Budget Margin Variance - ITD Actual Margin ITD - Current Budget Margin
ITD
11.303 Actual to Budget Margin Variance % - ITD (Actual Margin ITD - Current Budget Margin
ITD)/Current Budget Margin ITD

11.304 Current EAC Cost - ITD Inception to date estimate at completion cost
amount in the current forecast version.

11.305 Current EAC Equipment Cost - ITD Inception to date estimate at completion cost
of equipment in the current forecast version.

11.306 Current EAC Equipment Effort - ITD Inception to date estimate at completion
(EAC) units of equipment in the current
version of the forecast

11.307 Current EAC Labor Cost - ITD Inception to date estimate at completion cost
of labor in the current forecast version.

11.308 Current EAC Labor Effort - ITD Inception to date estimate at completion
(EAC) units of labor in the current version of
the forecast
11.309 Current EAC Margin - ITD Current EAC Revenue ITD - Current EAC
Cost ITD

Metric Reference Guide  2-104


Project Analytics

No Metric Name Description

11.310 Current EAC Revenue - ITD Estimate at completion revenue amount in the
current revenue forecast version.

11.311 Forecast Cost Variance % - ITD 100*(Current EAC Labor Effort ITD - Current
Budget Labor Effort ITD )/Current Budget
Labor Effort ITD
11.312 Forecast Margin % - ITD Inception to date Forecast Margin Amount
multiply 100 and divide by Current EAC
Revenue
11.313 Forecast Margin Amount - ITD ITD EAC revenue - ITD EAC cost, in the
current cost forecast

11.314 Forecast Revenue Variance % - ITD 100*(Current EAC Revenue ITD - Current
Budget Revenue ITD )/Current Budget
Revenue ITD
11.315 Forecast to Budget Margin Variance - ITD Current EAC Margin ITD - Current Budget
Margin ITD
11.316 Forecast to Budget Margin Variance % - ITD Current EAC Margin ITD - Current Budget
Margin ITD/Current Budget Margin ITD

11.317 Forecast to Budget Revenue Variance - ITD Current EAC Revenue ITD - Current Budget
Revenue ITD
11.318 Forecast to Budget Revenue Variance % - 100*(Current EAC Revenue ITD - Current
ITD Budget Revenue ITD)/Current Budget
Revenue ITD
11.319 Original EAC Cost - ITD Inception to date estimate at completion
burdened cost amount in the original cost
forecast

11.320 Original EAC Equipment Cost - ITD Inception to date estimate at completion cost
of equipment in the original forecast version.

11.321 Original EAC Equipment Effort - ITD Inception to date Estimate At Completion of
Units of equipment used in the original version
of the forecast

Metric Reference Guide  2-105


Project Analytics

No Metric Name Description

11.322 Original EAC Labor Cost - ITD Inception to date estimate at completion cost
amount in the original forecast

11.323 Original EAC Labor Effort - ITD Inception to date Estimate At Completion of
Units of labor used in the original version of
the forecast

11.324 Original EAC Revenue - ITD Inception to date estimate at completion


(EAC) revenue amount in the original revenue
forecast version

11.325 Current EAC Cost - MTD Month to date estimate at completion cost
amount in the current forecast version.

11.326 Current EAC Revenue - MTD Estimate at completion revenue amount in the
current revenue forecast version.

11.327 Original EAC Cost - MTD Month to date estimate at completion


burdened cost amount in the original cost
forecast

11.328 Original EAC Revenue - MTD Month to date estimate at completion (EAC)
revenue amount in the original revenue
forecast version

11.329 Current EAC Cost - QTD Quarter to date estimate at completion cost
amount in the current forecast version.

11.330 Current EAC Revenue - QTD Estimate at completion revenue amount in the
current revenue forecast version.

Metric Reference Guide  2-106


Project Analytics

No Metric Name Description

11.331 Original EAC Cost - QTD Quarter to date estimate at completion


burdened cost amount in the original cost
forecast

11.332 Original EAC Revenue - QTD Quarter to date estimate at completion (EAC)
revenue amount in the original revenue
forecast version

11.333 Current EAC Cost - YTD Year to date estimate at completion cost
amount in the current forecast version.

11.334 Current EAC Revenue - YTD Estimate at completion revenue amount in the
current revenue forecast version.

11.335 Original EAC Cost - YTD Year to date estimate at completion burdened
cost amount in the original cost forecast

11.336 Original EAC Revenue - YTD Year to date estimate at completion (EAC)
revenue amount in the original revenue
forecast version

11.337 Equipment Cost % - ITD 100*(Inception to date Equipment Cost /


Inception to date Equipment Cost in the
current version of the budget)

11.338 Equipment Effort % - ITD Inception to date units of equipment used as a


percent of the inception to date units of
equipment included in the current budget

11.339 Labor Cost % - ITD 100*(Inception to date Labor Cost / Inception


to date Labor Cost in the current version of
the budget)
11.340 Labor Effort % - ITD 100*(Inception to date Labor Effort / Inception
to date Labor Effort in the current version of
the budget)

Metric Reference Guide  2-107


Project Analytics

No Metric Name Description

11.341 Nonbillable Cost % - ITD 100*(Inception to Date Non-Billable Cost)/


Inception to Date Cost

11.342 Nonbillable Labor Effort % - ITD 100*(Inception to date non billable units of
labor used/ Inception to date units of labor
used)
11.343 Billable Cost % 100*(Billable Cost / Cost)
11.344 Billable Labor Effort % 100*(Inception to date billable units of labor
used /Total units of labor used)

11.345 Capitalizable Cost % 100*(Capitalizable Cost /Cost).

11.346 Cost Change compare to Previous Month Cost - Cost MAGO


11.347 Cost Change compared to Previous Quarter Cost - Cost QAGO
11.348 Equipment Cost % Spent 100* (Equipment Cost /Equipment Cost in the
current version of the budget)

11.349 Equipment Effort % Spent 100*(Units of equipment used/ Units of


equipment budgeted in the current version of
the budget)
11.350 Labor Cost % Spent 100*(Actual Labor Cost / Labor Cost in the
current version of the budget)

11.351 Labor Effort % Spent 100*(Units of labor used/ Units of labor


budgeted in the current version of the budget)

11.352 Nonbillable Cost % 100*(Non-Billable Cost)/Cost


11.353 Nonbillable Labor Effort % 100*(Non billable units of labor used/ Units of
labor used)
11.354 Margin % Annual Change Difference between the Margin percentage
from the last year and the Margin percentage
from the current year

11.355 Margin % Quarter Ago Margin as a percentage of the accrued


revenue for the last quarter

11.356 Margin % Quarterly Change Difference between the Margin percentage


from the last quarter and the Margin
percentage from the current quarter

11.357 Margin % Year Ago Margin as a percentage of the accrued


revenue for the last year
11.358 Margin Quarter Ago Difference between the project revenue and
burdened cost for the last quarter

Metric Reference Guide  2-108


Project Analytics

No Metric Name Description

11.359 Margin Year Ago Margin on the same period as selected but
previous year
11.360 Realized Gains Amount MAGO The amount realized gains debit by the draft
revenue - Month Ago
11.361 Realized Gains Amount QAGO The amount realized gains debit by the draft
revenue - Quarter Ago

11.362 Realized Gains Amount YAGO The amount realized gains debit by the draft
revenue - Year Ago
11.363 Realized Losses Amount QAGO The amount realized gains debit by the draft
revenue - Quarter Ago
11.364 Realized Losses Amount MAGO The amount realized gains debit by the draft
revenue - Month Ago
11.365 Realized Losses Amount YAGO The amount realized gains debit by the draft
revenue - Year Ago
11.366 Revenue Amount MAGO Amounts recognized as income or expected
billing to be received for work on a project
during the previous period

11.367 Revenue Amount QAGO Amounts recognized as income or expected


billing to be received for work on a project
during the previous quarter

11.368 Revenue Amount YAGO Amounts recognized as income or expected


billing to be received for work on a project
during the previous year

11.369 # of Projects - ITD Number of projects with budgets since


inception

11.370 # of Tasks - ITD Number of distinct tasks with an Invoice


Distribution Line since the Project inception

Metric Reference Guide  2-109


Project Analytics

No Metric Name Description

11.371 Actual to Budget Revenue Variance - ITD Revenue ITD - Current Budget Revenue ITD

11.372 Actual to Budget Revenue Variance % - ITD 100*(Revenue ITD - Current Budget Revenue
ITD)/ (Current Budget Revenue ITD)

11.373 Bill Amount - ITD Inception to date total invoice amount.

11.374 Margin - ITD Inception to date difference between the


project revenue and burdened cost

11.375 Margin % - ITD 100*(Revenue ITD - Cost ITD) /Revenue ITD

11.376 Realized Gains Amount - ITD The amount realized gains debit by the draft
revenue ITD
11.377 Realized Losses Amount - ITD The amount realized gains debit by the draft
revenue - ITD
11.378 Revenue Amount - ITD Amounts recognized as income or expected
billing to be received for work on a project
since project inception until the current date

11.379 Revenue Signed Backlog - ITD ITD difference between Funding Amount and
Revenue Amount for Project Contract Lines
with status 'ACTIVE' or 'EXPIRED'

11.380 Revenue Unsigned Backlog - ITD ITD difference between Funding Amount and
Revenue Amount for Project Contract Lines
with status 'DRAFT', 'PENDING
ACCEPTANCE', 'HOLD' or 'UNDER
AMENDMENT'

11.381 Revenue Variance - ITD Revenue ITD - Current Budget Revenue ITD

11.382 Revenue Variance to Budget Amount - ITD Revenue ITD - Current Budget Revenue ITD

11.383 Revenue Variance to Forecast Amount - ITD Revenue ITD - Current EAC Revenue ITD

11.384 Unbilled Receivable - ITD Revenue amount accrued since project


inception by the selected items of the WBS

11.385 Unearned Revenue - ITD Inception to Date value of revenue recognized


for which the work has not been performed
yet.

Metric Reference Guide  2-110


Project Analytics

No Metric Name Description

11.386 Bill Amount - MTD Month to date total invoice amount.

11.387 Realized Gains Amount - MTD The amount realized gains debit by the draft
revenue MTD
11.388 Realized Losses Amount - MTD The amount realized gains debit by the draft
revenue - MTD
11.389 Revenue Amount - MTD Amounts recognized as income or expected
billing to be received for work on a project
during the selected period until the current
date

11.390 Revenue Signed Backlog - MTD Month to date difference between Funding
Amount and Revenue Amount for Project
Contract Lines with status 'ACTIVE' or
'EXPIRED'
11.391 Revenue Unsigned Backlog - MTD Month to date difference between Funding
Amount and Revenue Amount for Project
Contract Lines with status 'DRAFT',
'PENDING ACCEPTANCE', 'HOLD' or
'UNDER AMENDMENT'

11.392 Revenue Variance to Budget Amount - MTD Revenue MTD - Current Budget Revenue
MTD

11.393 Revenue Variance to Forecast Amount - Difference of Revenue and Current EAC
MTD Revenue for the selected month

11.394 Unbilled Receivable - MTD Period to Date value for the revenue amount
of the expenditure item or event

11.395 Unearned Revenue - MTD Month to Date value of revenue recognized for
which the work has not been performed yet.

11.396 Bill Amount - QTD Quarter to Date total invoice amount.

11.397 Realized Gains Amount - QTD The amount realized gains debit by the draft
revenue QTD
11.398 Realized Losses Amount - QTD The amount realized gains debit by the draft
revenue - QTD
11.399 Revenue Amount - QTD Amounts recognized as income or expected
billing to be received for work on a project
during the selected quarter until the current
date

Metric Reference Guide  2-111


Project Analytics

No Metric Name Description

11.400 Revenue Signed Backlog- QTD Quarter to date difference between Funding
Amount and Revenue Amount for Project
Contract Lines with status 'ACTIVE' or
'EXPIRED'
11.401 Revenue Unsigned Backlog - QTD Quarter to date difference between Funding
Amount and Revenue Amount for Project
Contract Lines with status 'DRAFT',
'PENDING ACCEPTANCE', 'HOLD' or
'UNDER AMENDMENT'

11.402 Revenue Variance to Budget Amount - QTD Revenue QTD - Current Budget Revenue
QTD

11.403 Revenue Variance to Forecast Amount - Difference of Revenue and Current EAC
QTD Revenue for the selected quarter

11.404 Unbilled Receivable - QTD Quarter to Date value for the revenue amount
of the expenditure item or event

11.405 Unearned Revenue - QTD Quarter to Date value of revenue recognized


for which the work has not been performed
yet.
11.406 Bill Amount - YTD Year to Date total invoice amount.
11.407 Realized Gains Amount - YTD The amount realized gains debit by the draft
revenue YTD
11.408 Realized Losses Amount - YTD The amount realized gains debit by the draft
revenue - YTD
11.409 Revenue Amount - YTD Amounts recognized as income or expected
billing to be received for work on a project
during the selected year until the current date

11.410 Revenue Signed Backlog- YTD Year to date difference between Funding
Amount and Revenue Amount for Project
Contract Lines with status 'ACTIVE' or
'EXPIRED'
11.411 Revenue Unsigned Backlog- YTD Year to date difference between Funding
Amount and Revenue Amount for Project
Contract Lines with status 'DRAFT',
'PENDING ACCEPTANCE', 'HOLD' or
'UNDER AMENDMENT'

Metric Reference Guide  2-112


Project Analytics

No Metric Name Description

11.412 Revenue Variance to Budget Amount - YTD Revenue YTD - Current Budget Revenue YTD

11.413 Revenue Variance to Forecast Amount - Difference of Revenue and Current EAC
YTD Revenue for the selected year

11.414 Unbilled Receivable - YTD Year to Date for the revenue amount of the
expenditure item or event

11.415 Unearned Revenue - YTD Year to Date value of revenue recognized for
which the work has not been performed yet.

2.12 Project - Resource Management

No Metric Name Description

12.1 # Of Employees Count of employees having a given


competency
12.2 # Of Employees MAGO Count of employees having a given
competency in the month previous to that
selected
12.3 # Of Employees QAGO Count of employees having a given
competency in the quarter previous to that
selected
12.4 # Of Employees YAGO Count of employees having a given
competency in the year previous to that
selected
12.5 Available Resource Count For Bucket1 Count of resources available for five
consecutive working days starting from the
selected day
12.6 Available Resource Count For Bucket2 Count of resources available for five
consecutive working days starting a week
from the selected day

12.7 Available Resource Count For Bucket3 Count of resources available for five
consecutive working days starting two
weeks from the selected day

Metric Reference Guide  2-113


Project Analytics

No Metric Name Description

12.8 Available Resource Count For Bucket4 Count of resources available for five
consecutive working days starting three
weeks from the selected day

12.9 # of Requirements Count of requirements for the selected filter


conditions
12.10 Required Resource Count Number of resources requested in a project
resource requirement
12.11 Required Time Time for which a resource is requested in a
project resource requirement

12.12 Unfulfilled Resource Count Number of resources that as of the selected


date has not yet been assigned

12.13 Unfulfilled Time Requested time that has not been fulfilled
that as of the selected date

12.14 # of Assignments Count of assignments for the selected filters

12.15 Actual Time Time reported in time cards by resources

12.16 Available Resource Count Filter metric that returns


12.17 Available Resources Count of resources available at a given point
in time
12.18 Available Resources % Available Resources /Total Resources

12.19 Available Time Capacity Time - Confirmed Time


12.20 Available Time Difference Available Time Difference
12.21 Available Time Percent Available time as a percent of Capacity
Time
12.22 Billable Organization Utilization % Billable Organization Utilization Weighted
Time / Capacity Time
12.23 Billable Resource Utilization % Billable Resource Utilization Weighted Time
/ Capacity Time
12.24 Billable Time Billable actual time
12.25 Capacity Time Total usable time based on each resource's
calendar
12.26 Confirmed Assigned Resource Count Total count of resources assigned to a
project at a given point in time

12.27 Confirmed Billable Time Scheduled billable time with assignment


status code = Confirmed

12.28 Confirmed Nonbillable Time Scheduled non billable time with assignment
status code = Confirmed

Metric Reference Guide  2-114


Project Analytics

No Metric Name Description

12.29 Confirmed Time Scheduled time where assignment status


code = Confirmed

12.30 Confirmed Time % Confirmed time as a percent of Capacity


time
12.31 ----------Effort Metrics-----------
12.32 Expected Billable Organization Utilization % Expected Organization Weighted Billable
Time / Capacity Time
12.33 Expected Billable Resource Utilization % Expected Resource Weighted Billable Time
/ Capacity Time
12.34 Expected Organization Utilization % Expected Organization Weighted Time /
Capacity Time
12.35 Expected Organization Weighted Time Expected time weighted by the different
classifications of work (work types) using the
set of weights for the organization level

12.36 Expected Resource Utilization % Expected Resource Weighted Time /


Capacity Time
12.37 Expected Resource Weighted Time Expected time weighted by the different
classifications of work (work types) using the
set of weights for the resource level

12.38 Expected Training Time Expected time for work classified as training

12.39 Expected Training Time % Expected training time as a percent of total


expected time
12.40 ----------Expected Utilization Metrics-----------
12.41 Expected Utilization Time For a given period, actual time for days
previous to the current + scheduled time for
subsequent to the current

12.42 Missing Time Capacity Time - Actual Time


12.43 Nonbillable Organization Utilization % Non Billable Organization Utilization
Weighted Time / Capacity Time

12.44 Nonbillable Resource Utilization % Non Billable Resource Utilization Weighted


Time / Capacity Time
12.45 Nonbillable Time Non billable actual time
12.46 Organization Billable Weighted Time Billable time weighted by the different
classifications of work (work types) with the
set of weights for the organization level

12.47 Organization Utilization % Organization Utilization Weighted


Time/Capacity Time

Metric Reference Guide  2-115


Project Analytics

No Metric Name Description

12.48 Organization Utilization Weighted Time Actual Time weighted by the different
classifications of work (work types) with the
set of weights for the organization level

12.49 Provisional Billable Time Scheduled billable time with status code =
Provisional
12.50 Provisional Nonbillable Time Non billable Time scheduled with status
code = Provisional
12.51 Provisional Time Scheduled time with status code =
Provisional
12.52 Provisional Time % Provisional time as a percent of Capacity
time
12.53 Resource Availability % Available Time / Capacity Time
12.54 Resource Billable Weighted Time Billable time weighted by the different
classifications of work (work types) with the
set of weights for the resource level

12.55 Resource Utilization % Resource Utilization Weighted


Time/Capacity Time
12.56 Resource Utilization Weighted Time Actual Time weighted by the different
classifications of work (work types) with the
set of weights for the resource level

12.57 Scheduled Billable Organization Utilization % Billable Scheduled Organization Utilization


Weighted Time / Capacity Time

12.58 Scheduled Billable Resource Utilization % Billable Scheduled Resource Utilization


Weighted Time / Capacity Time

12.59 Scheduled Billable Time Billable time scheduled


12.60 Scheduled Nonbillable Organization Utilization Non Billable Scheduled Organization
% Utilization Weighted Time / Capacity Time

12.61 Scheduled Nonbillable Resource Utilization % Non Billable Scheduled Resource Utilization
Weighted Time / Capacity Time

12.62 Scheduled Nonbillable Time Non billable time scheduled


12.63 Scheduled Organization Utilization % Scheduled Organization Utilization
Weighted Time / Capacity Time

12.64 Scheduled Resource Utilization % Scheduled Resource Utilization Weighted


Time / Capacity Time
12.65 Scheduled Time Time a resource has been assigned to work
on a project. An assignment can be
provisional or confirmed

Metric Reference Guide  2-116


Project Analytics

No Metric Name Description

12.66 Total Resources Total count of resources


12.67 Training Time Time assigned to training activities

12.68 Training Time % Training Time/ Capacity Time


12.69 Unassigned Time Capacity time - (Confirmed time +
Provisional time) It is 0 if Confirmed +
Provisional > Capacity

12.70 Unassigned Time % Unassigned time as a percent of Capacity


Time
12.71 Variance to Scheduled Organization Utilization Organization Utilization % - Scheduled
% Organization Utilization %

12.72 Variance to Scheduled Resource Utilization % Resource Utilization % - Scheduled


Resource Utilization %
12.73 Actual Time - ITD Time reported as utilized since inception,
satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

12.74 Confirmed Billable Time - ITD Confirmed billable time scheduled since
inception, satisfying the filter of the report.
For example, if filtering by project, then data
is since project inception

12.75 Confirmed Nonbillable Time - ITD Confirmed non billable time scheduled since
inception, satisfying the filter of the report.
For example, if filtering by project, then data
is since project inception

12.76 Confirmed Time - ITD Confirmed time scheduled since inception,


satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

12.77 Provisional Billable Time - ITD Provisional billable time scheduled since
inception, satisfying the filter of the report.
For example, if filtering by project, then data
is since project inception

12.78 Provisional Nonbillable Time - ITD Provisional non billable time scheduled
since project inception

Metric Reference Guide  2-117


Project Analytics

No Metric Name Description

12.79 Provisional Time - ITD Provisional time scheduled since inception,


satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

12.80 Schedule Billable Time - ITD Billable time scheduled since inception,
satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

12.81 Schedule Nonbillable Time - ITD Non billable time scheduled since inception,
satisfying the filter of the report. For
example, if filtering by project, then data is
since project inception

12.82 Scheduled Time - ITD Time scheduled since inception, satisfying


the filter of the report. For example, if
filtering by project, then data is since project
inception

12.83 Actual Time - MTD Month to date actual time


12.84 Billable Organization Utilization % - MTD Month to date organization billable utilization
%
12.85 Billable Resource Utilization % - MTD Month to date resource billable utilization %

12.86 Capacity Time - MTD Month to date capacity time


12.87 Change in Available Resources % - MTD Month-to-date Available Resources % -
Prior Month-to-date Available Resources %

12.88 Change in Missing Hours - MTD Month to date Missing Time - Prior Month to
date Missing Times

12.89 Change in Organization Utilization % - MTD Month-to-Date Organization Utilization % -


Prior Month-to-Date Organization Utilization
%
12.90 Change in Resource Utilization % - MTD Month-to-Date Resource Utilization % - Prior
Month-to-Date Resource Utilization %

12.91 Missing Time - MTD Month to date missing time


12.92 Organization Utilization % - MTD Month to date organization utilization %

12.93 Resource Utilization % - MTD Month to date resource utilization %

12.94 Scheduled Time - MTD Month to date scheduled time


12.95 Unassigned Time - MTD Month to data unassigned time
12.96 Actual Time - QTD Quarter to date actual time

Metric Reference Guide  2-118


Project Analytics

No Metric Name Description

12.97 Billable Organization Utilization % - QTD Quarter to date organization billable


utilization %
12.98 Billable Resource Utilization % - QTD Quarter to date resource billable utilization
%
12.99 Capacity Time - QTD Quarter to date capacity time
12.100 Change in Available Resources % - QTD Quarter-to-date Available Resources % -
Prior Quarter-to-date Available Resources
%
12.101 Change in Missing Hours - QTD Quarter to date Missing Time - Prior Year to
date Missing Times
12.102 Change in Organization Utilization % - QTD Quarter-to-Date Organization Utilization % -
Prior Quarter-to-Date Organization
Utilization %
12.103 Change in Resource Utilization % - QTD Quarter-to-Date Resource Utilization % -
Prior Quarter-to-Date Resource Utilization %

12.104 Missing Time - QTD Quarter to date missing time


12.105 Organization Utilization % - QTD Quarter to date organization utilization %

12.106 Resource Utilization % - QTD Quarter to date resource utilization %

12.107 Scheduled Time - QTD Quarter to date scheduled time


12.108 Unassigned Time - QTD Quarter to data unassigned time
12.109 Billable Organization Utilization % - YAGO Billable Organization Utilization % for same
period in the previous year

12.110 Billable Resource Utilization % - YAGO Billable Resource Utilization % for same
period in the previous year
12.111 Organization Utilization % - YAGO Organization Utilization % in the year
previous to that selected
12.112 Resource Utilization % - YAGO Resource Utilization % in the year previous
to that selected
12.113 Actual Time - YTD Year to date actual time
12.114 Billable Organization Utilization % - YTD Year to date organization billable utilization
%
12.115 Billable Resource Utilization % - YTD Year to date resource billable utilization %

12.116 Capacity Time - YTD Year to date capacity time


12.117 Change in Available Resources % - YTD Year-to-date Available Resources % - Prior
Year-to-date Available Resources %

12.118 Change in Missing Hours - YTD Year to date Missing Time - Prior Year to
date Missing Times
12.119 Change in Organization Utilization % - YTD Year-to-Date Resource Utilization % - Prior
Year-to-Date Resource Utilization %

Metric Reference Guide  2-119


Project Analytics

No Metric Name Description

12.120 Change in Resource Utilization % - YTD Year-to-Date Resource Utilization % - Prior


Year-to-Date Resource Utilization %

12.121 Missing Time - YTD Year to date missing time


12.122 Organization Utilization % - YTD Year to date organization utilization %

12.123 Resource Utilization % - YTD Year to date resource utilization %

12.124 Scheduled Time - YTD Year to date scheduled time


12.125 Unassigned Time - YTD Year to data unassigned time

2.13 Project – Revenue

No Metric Name Description


13.1 Bill Amount MAGO Bill amount - Month Ago
13.2 Bill Amount QAGO Bill Amount - Quarter Ago
13.3 Bill Amount YAGO Bill Amount - Year Ago
13.4 Realized Gains Amount MAGO The amount realized gains debit by the
draft revenue - Month Ago
13.5 Realized Gains Amount QAGO The amount realized gains debit by the
draft revenue - Quarter Ago

13.6 Realized Gains Amount YAGO The amount realized gains debit by the
draft revenue - Year Ago
13.7 Realized Losses Amount QAGO The amount realized gains debit by the
draft revenue - Quarter Ago
13.8 Realized Losses Amount MAGO The amount realized gains debit by the
draft revenue - Month Ago
13.9 Realized Losses Amount YAGO The amount realized gains debit by the
draft revenue - Year Ago
13.10 Revenue Amount MAGO Amounts recognized as income or
expected billing to be received for work on
a project during the previous period

Metric Reference Guide  2-120


Project Analytics

No Metric Name Description


13.11 Revenue Amount QAGO Amounts recognized as income or
expected billing to be received for work on
a project during the previous quarter

13.12 Revenue Amount YAGO Amounts recognized as income or


expected billing to be received for work on
a project during the previous year

13.13 Revenue Monthly Change Difference between the Revenue from the
last quarter and the Revenue from the
current quarter
13.14 Revenue Quarterly Change Difference between the Revenue from the
last quarter and the Revenue from the
current quarter
13.15 Revenue Write-Off Amount MAGO A decrease in revenues a month ago
when payment for a receivable cannot be
collected.
13.16 Revenue Write-Off Amount QAGO A decrease in revenues a quarter ago
when payment for a receivable cannot be
collected.
13.17 Revenue Write-Off Amount YAGO A decrease in revenues year ago when
payment for a receivable cannot be
collected.
13.18 Revenue Yearly Change Difference between the Revenue from the
last year and the Revenue from the
current year
13.19 # of Projects Number of distinct Projects with a
Revenue Distribution Line
13.20 # of Revenue Lines Not Transferred Count of revenue lines with transfer status
equal to not transferred

13.21 # of Tasks Number of distinct tasks that have been


included on invoices.
13.22 Active Contracts Revenue Amount Revenue of contract lines with status
"Active"
13.23 Bill Amount Total amount of all invoices.
13.24 Realized Gains Amount The amount realized gains debit by the
draft revenue

Metric Reference Guide  2-121


Project Analytics

No Metric Name Description


13.25 Realized Losses Amount The amount realized losses credited by
the draft revenue
13.26 Revenue Amount Amounts recognized as income or
expected billing to be received for work on
a project
13.27 Revenue Amount - Revenue Lines Not Amount value of revenue lines with
Transferred transfer status equal to not transferred

13.28 Revenue Quantity Number of Units (of Material or Hours)


used for this Revenue Distribution Line

13.29 Revenue Write-Off Amount Revenue write-off is a decrease in


revenues when payment for a receivable
cannot be collected.
13.30 Unbilled Receivable Identifies the potential revenue amount of
the expenditure item to be charged to the
GL account, in chart of account/ group/
global currency of the organization against
which a transaction is carried out, which is
attributable to the revenue generated as
a...

13.31 Unearned Revenue Value of revenue recognized for which the


work has not been performed yet.

13.32 # of Projects - ITD Number of distinct projects with a revenue


distribution line since the project inception

13.33 # of Tasks - ITD Number of distinct tasks with an Invoice


Distribution Line since the Project
inception
13.34 Active Contracts Revenue Amount - ITD Revenue since project inception of
contract lines with status "Active"
13.35 Bill Amount - ITD Inception to date total invoice amount.

13.36 Realized Gains Amount - ITD The amount realized gains debit by the
draft revenue ITD
13.37 Realized Losses Amount - ITD The amount realized gains debit by the
draft revenue - ITD
13.38 Revenue Amount - ITD Amounts recognized as income or
expected billing to be received for work on
a project since project inception until the
current date
13.39 Revenue Write-Off Amount - ITD Inception to date write-off amount for
revenue

Metric Reference Guide  2-122


Project Analytics

No Metric Name Description


13.40 Unbilled Receivable - ITD Revenue amount accrued since project
inception by the selected items of the
WBS
13.41 Unearned Revenue - ITD Inception to Date value of revenue
recognized for which the work has not
been performed yet.
13.42 Active Contracts Revenue Amount - MTD Month to date revenue of contract lines
with status "Active"
13.43 Bill Amount - MTD Month to date total invoice amount.

13.44 Realized Gains Amount - MTD The amount realized gains debit by the
draft revenue MTD
13.45 Realized Losses Amount - MTD The amount realized gains debit by the
draft revenue - MTD
13.46 Revenue Amount - MTD Amounts recognized as income or
expected billing to be received for work on
a project during the selected period until
the current date

13.47 Revenue Write-Off Amount - MTD Month to date write-off amount for revenue

13.48 Unbilled Receivable - MTD Period to Date value for the revenue
amount of the expenditure item or event

13.49 Unearned Revenue - MTD Month to Date value of revenue


recognized for which the work has not
been performed yet.
13.50 Active Contracts Revenue Amount - QTD Quarter to date revenue of contract lines
with status "Active"
13.51 Bill Amount - QTD Quarter to Date total invoice amount.

13.52 Realized Gains Amount - QTD The amount realized gains debit by the
draft revenue QTD
13.53 Realized Losses Amount - QTD The amount realized gains debit by the
draft revenue - QTD
13.54 Revenue Amount - QTD Amounts recognized as income or
expected billing to be received for work on
a project during the selected quarter until
the current date

13.55 Revenue Write-Off Amount - QTD Quarter to date write-off amount for
revenue
13.56 Unbilled Receivable - QTD Quarter to Date value for the revenue
amount of the expenditure item or event

Metric Reference Guide  2-123


Project Analytics

No Metric Name Description


13.57 Unearned Revenue - QTD Quarter to Date value of revenue
recognized for which the work has not
been performed yet.
13.58 Equipment Actual Bill Rate Revenue due to equipment / Quantity units
used for the equipment revenue
distribution line

13.59 Labor Actual Bill Rate Revenue due to labor / Quantity units used
for the labor revenue distribution line

13.60 Active Contracts Revenue Amount - YTD Year to date revenue of contract lines with
status "Active"
13.61 Bill Amount - YTD Year to Date total invoice amount.
13.62 Realized Gains Amount - YTD The amount realized gains debit by the
draft revenue YTD
13.63 Realized Losses Amount - YTD The amount realized gains debit by the
draft revenue - YTD
13.64 Revenue Amount - YTD Amounts recognized as income or
expected billing to be received for work on
a project during the selected year until the
current date

13.65 Revenue Write-Off Amount - YTD Year to date write-off amount for revenue

13.66 Unbilled Receivable - YTD Year to Date for the revenue amount of
the expenditure item or event

13.67 Unearned Revenue - YTD Year to Date value of revenue recognized


for which the work has not been performed
yet.

2.14 Project - Revenue GL Reconciliation

No Metric Name Description

14.1 # of Amount Mismatch Count of journals lines with transaction


amounts that do not match the total amount
of their matching revenue distributions lines

Metric Reference Guide  2-124


Project Analytics

14.2 # of Manual Journal Lines Count of journal lines that do not have
matching revenue distribution lines

14.3 # of Revenue Line Transfer Exceptions Count revenue lines transferred out of
Projects but not found at their destination.
For EBS R12 users this is those lines not
found in Sub Ledger Accounting. For EBS
11.5.10 this is those lines not found in
General Ledger. For People Soft customers
with Single Feed, this is those lines not
found in the Accounting Lines table. This
metric does not apply for People Soft users
with dual feed.

14.4 # of Revenue Lines not in GL Count of transferred revenue distribution


lines that have no corresponding journal
lines created in General Ledger. For EBS
R12 users this is exceptions in the transfer
from Sub Ledger Accounting to General
Ledger. For People Soft Customers, this is
exceptions in the transfer from Accounting
Lines to General Ledger. This metric does
not apply for EBS 11.5.10 users or People
Soft customers with Dual Feed.

14.5 # of Revenue Lines with Unposted Journals Count of transferred revenue distribution
lines, with journal lines created but not
posted to the General Ledger

14.6 Amount - Revenue Line Transfer Exceptions Debit amount of revenue distribution lines
transferred out of Projects but not found at
their destination. For EBS R12 users this is
those lines not found in Sub Ledger
Accounting. For EBS 11.5.10 this is those
lines not found in General Ledger. For
People Soft customers with Single Feed, this
is those lines not found in the Accounting
Lines table. This metric does not apply for
People Soft users with Dual Feed.

14.7 Amount - Revenue Lines Not in GL Debit amount of transferred revenue


distribution lines that have no corresponding
journal lines created in General Ledger. For
EBS R12 users this is exceptions in the
transfer from Sub Ledger Accounting to
General Ledger. For People Soft Customers,
this is exceptions in the transfer from
Accounting Lines to General Ledger. This
metric does not apply for EBS 11.5.10 users
or People Soft customers with Dual Feed.

Metric Reference Guide  2-125


Project Analytics

14.8 Amount - Revenue Lines with Unposted Amount of transferred revenue distribution
Journals lines, with journal lines created but not
posted to the General Ledger

14.9 Credit Amount - Manual Journal Lines Transaction amount of credit journal lines
that do not have matching revenue
distribution lines
14.10 Debit Amount - Manual Journal Lines Transaction amount of debit journal lines
that do not have matching revenue
distribution lines
14.11 Journal Lines - Credit Amount Credit amount value of journal lines

14.12 Journal Lines - Debit Amount Debit amount value of journal lines

14.13 Revenue Lines - Credit Amount Amount of credit entries for a revenue line

14.14 Revenue Lines - Debit Amount Amount of debit entries for a revenue line

14.15 Transaction Amount Amount of revenue transactions

2.15 Project – Earned Value Management


No Metric Name Description
15.1 % Complete Percentage completed (Work performed) of
a task or project measured since inception.
Data at lowest level is read from the base
application. Figures are rolled up to parent
tasks and project.
Budget at Completion - Progress Inception to date cost amount in the current
15.2
version of the budget
Cost - ITD
15.3 Inception to date cost amount. This is the
actual cost of work performed since
inception.
Earned Value Budgeted cost of work performed since
15.4
inception
Planned Value Budgeted cost of work scheduled since
15.5
inception
Cost Variance
15.6 Difference between Earned Value and Cost,
since inception
Cost Variance %
15.7 Cost Variance / Earned Value, since inception
Cost Performance Index
15.8 Earned Value / Cost, since inception
Schedule Variance
15.9 Difference between Earned Value and Plan

Metric Reference Guide  2-126


Project Analytics

Value, since inception


Schedule Variance %
15.10 Schedule Variance / Planned Value, since
inception

15.11 Schedule Performance Index Earned Value /Planned Value, since


inception

15.12 Cost/Schedule Index Product of Cost Performance Index and


Schedule Performance Index, since
inception

15.13 To Complete Cost Performance Indicator (Budget at Completion - Progress – Earned


Value) / (Budget at Completion – Actual
Cost), since project inception.

15.14 To Complete Schedule Performance Indicator (Budget at Completion – Earned Value) /


(Budget at Completion – Planned Value),
since project inception.

15.15 Estimate at Completion Inception to date estimate at completion


cost amount in the current forecast version.

15.16 Estimate to Complete Estimate to complete cost amount in the


current forecast version

15.17 Variance at Completion Difference between the Budget at


Completion and the inception to date
Estimate at Completion

15.18 Variance at Completion % Variance at Completion / Budget at


Completion

15.19 % Complete Cost 100*(Cost - ITD + Estimate to Complete)

15.20 % Spent Cost 100* (Cost - ITD / Budget at Completion)

15.21 Budgeted Quantity of Work Scheduled Budget effort scheduled since inception

15.22 Actual Quantity of Work Performed Actual effort booked since inception. This is
effort attributed to work performed.

15.23 Budgeted Actual Quantity Total budgeted effort

15.24 Budgeted Quantity of Work Performed Budget Actual Quantity * % Completion

15.25 Time Based Metrics - % Complete Percentage completion of a task or project


in the selected period of time

15.26 Time Based Metrics - Cost Cost amount for the selected period. This is
the actual cost of work performed for the
selected period of time
Budgeted cost of the work performed for
15.27 Time Based Metrics - Earned Value
the selected period of time
Budgeted cost of the work scheduled for
15.28 Time Based Metrics - Planned Value
the selected period of time

Metric Reference Guide  2-127


Project Analytics

15.29 Time Based Metrics -Cost Variance Difference between Earned Value and Cost
for the selected period of time

15.30 Time Based Metrics - Cost Variance % Cost Variance / Earned Value, for the selected
period of time

15.31 Time Based Metrics - Cost Performance Index Earned Value / Cost, for the selected period
of time

15.32 Time Based Metrics - Schedule Variance Difference between Earned Value and Plan
Value, for the selected period of time

15.33 Time Based Metrics - Schedule Variance % Schedule Variance / Planned Value, for the
selected period of time

15.34 Time Based Metrics - Schedule Performance Earned Value /Planned Value for the
Index selected period of time

2.16 Project – Construction in Progress


No Metric Name Description
16.1 Total Cost – Capital Project For Capital projects, this is the total of the
capitalizable and expensed cost
Capitalizable Cost For Capital projects, CIP Cost plus
16.2
Interfaced CIP cost
Expensed Cost
16.3 For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents project costs that are not to be
capitalized and hence will not be
summarized in the Asset lines.
Capitalizable Cost not associated to a Asset For Capital projects, CIP Cost plus
16.4
Interfaced CIP cost but not associated to a
Asset
16.5 Total Cost – Capital Project - ITD For Capital projects, this is the total of the
capitalizable and expensed cost ITD
Capitalizable Cost - ITD For Capital projects, CIP Cost plus
16.6
Interfaced CIP cost ITD
Expensed Cost - ITD
16.7 For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents ITD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
Capitalizable Cost not associated to a Asset - For Capital projects, CIP Cost plus
16.8
ITD Interfaced CIP cost but not associated to a
Asset ITD
16.9 Total Cost – Capital Project - YTD For Capital projects, this is the total of the
capitalizable and expensed cost ITD
Capitalizable Cost - YTD For Capital projects, CIP Cost plus
16.10
Interfaced CIP cost YTD

Metric Reference Guide  2-128


Project Analytics

Expensed Cost - YTD


16.11 For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents YTD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
Capitalizable Cost not associated to a Asset - For Capital projects, CIP Cost plus
16.12
YTD Interfaced CIP cost but not associated to a
Asset YTD
16.13 Total Cost – Capital Project - QTD For Capital projects, this is the total of the
capitalizable and expensed cost QTD
Capitalizable Cost - QTD For Capital projects, CIP Cost plus
16.14
Interfaced CIP cost QTD
Expensed Cost - QTD
16.15 For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents QTD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
Capitalizable Cost not associated to a Asset - For Capital projects, CIP Cost plus
16.16
QTD Interfaced CIP cost but not associated to a
Asset QTD
16.17 Total Cost – Capital Project - MTD For Capital projects, this is the total of the
capitalizable and expensed cost MTD
Capitalizable Cost - MTD For Capital projects, CIP Cost plus
16.18
Interfaced CIP cost MTD
Expensed Cost - MTD
16.19 For Capital projects, difference of Total
project Cost and the capitalizable cost. This
represents MTD project costs that are not to
be capitalized and hence will not be
summarized in the Asset lines.
Capitalizable Cost not associated to a Asset - For Capital projects, CIP Cost plus
16.20
MTD Interfaced CIP cost but not associated to a
Asset MTD
16.21 # of Projects Count of Capital projects
Interfaced CIP Cost Total of asset lines that have been already
16.22
sent from Projects to Fixed Assets
Original Asset Cost
16.23 In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the total value of the asset
lines that had been interfaced to Fixed
Assets before the split.
CIP Cost Cost associated with building a
16.24
construction-in-progress asset. This can be
raw or burdened cost, according to how the
project has been set up.
16.25 # of Projects - ITD Count of Capital projects ITD
Interfaced CIP Cost - ITD Total of asset lines that have been already
16.26
sent from Projects to Fixed Assets ITD
Original Asset Cost - ITD
16.27 In cases where a fixed asset is split into

Metric Reference Guide  2-129


Project Analytics

more than one asset after some CIP cost


has been already interfaced to fixed assets,
this represents the ITD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
CIP Cost - ITD Cost associated with building a
16.28
construction-in-progress asset ITD. This can
be raw or burdened cost, according to how
the project has been set up.
16.29 # of Projects - YTD Count of Capital projects YTD
Interfaced CIP Cost - YTD Total of asset lines that have been already
16.30
sent from Projects to Fixed Assets YTD
Original Asset Cost - YTD
16.31 In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the YTD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
CIP Cost - YTD Cost associated with building a
16.32
construction-in-progress asset YTD. This
can be raw or burdened cost, according to
how the project has been set up.
16.33 # of Projects - QTD Count of Capital projects QTD
Interfaced CIP Cost - QTD Total of asset lines that have been already
16.34
sent from Projects to Fixed Assets QTD
Original Asset Cost - QTD
16.35 In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the QTD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
CIP Cost - QTD Cost associated with building a
16.36
construction-in-progress asset QTD. This
can be raw or burdened cost, according to
how the project has been set up.
16.37 # of Projects - MTD Count of Capital projects MTD
Interfaced CIP Cost - MTD Total of asset lines that have been already
16.38
sent from Projects to Fixed Assets MTD
Original Asset Cost - MTD
16.39 In cases where a fixed asset is split into
more than one asset after some CIP cost
has been already interfaced to fixed assets,
this represents the MTD value of the asset
lines that had been interfaced to Fixed
Assets before the split.
CIP Cost - MTD Cost associated with building a
16.40
construction-in-progress asset MTD. This
can be raw or burdened cost, according to
how the project has been set up.
16.41 Interfaced CIP Cost Total of asset lines that have been already
sent from Projects to Fixed Assets.

Metric Reference Guide  2-130


Project Analytics

CIP Cost Cost associated with building a


16.42
construction-in-progress asset. This can be
raw or burdened cost, according to how the
project has been set up.
16.43 Interfaced CIP Cost - ITD Total of asset lines that have been already
sent from Projects to Fixed Assets ITD.
CIP Cost - ITD Cost associated with building a
16.44
construction-in-progress asset ITD. This can
be raw or burdened cost, according to how
the project has been set up.
16.45 Interfaced CIP Cost - YTD Total of asset lines that have been already
sent from Projects to Fixed Assets YTD.
CIP Cost - YTD Cost associated with building a
16.46
construction-in-progress asset YTD. This
can be raw or burdened cost, according to
how the project has been set up.
16.47 Interfaced CIP Cost - QTD Total of asset lines that have been already
sent from Projects to Fixed Assets QTD.
CIP Cost - QTD Cost associated with building a
16.48
construction-in-progress asset QTD. This
can be raw or burdened cost, according to
how the project has been set up.
16.49 Interfaced CIP Cost - MTD Total of asset lines that have been already
sent from Projects to Fixed Assets MTD.
CIP Cost - MTD Cost associated with building a
16.50
construction-in-progress asset MTD. This
can be raw or burdened cost, according to
how the project has been set up.

Metric Reference Guide  2-131


Project Analytics

Metric Reference Guide  2-132