Você está na página 1de 9

KAR OIL & GAS CO.

Khurmala Field
FIELD DEPARTMENT
DRILLING DEVE. OIL WELLS PROJECT
TU Location

References RTKB
Well KDN-21(K-448)
Depth (mMD) 914
Lower fars formation
Current Formation

Disconnect hydraulic lines of Annu


Current Operation at 24:00:

Connected hydraulic lines. Performed fu


w/ 500 psi, observed leakage from top se
between casing head spool and riser spo
coflex hose connections. Changed ring. I
Operations last 24 hours(00:00 to 24:00) leakage. Bleed off pressure.Opened Ann
Untightened bolts btwn Annular BOP and

Totco
400
432
643
842.5

Last Survey MD(m)

MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)
MW(kg/l)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEO
Interval m. MD

Interval m. MD

Gas Type Interval


(m)
Background Gas

Peak Gas
Trip Gas
Kick Gas
Connection Gas
Wiper Trip Gas
Prog. MD (m Prog. TVD (m
PROVISIONAL FORMATION PICKS
RTKB) Depth RTKB) Depth

Formations
Upper Midle Fars in part
Lower Fars (URB) 750

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


Upper Red Bed 750
Ao 750
R6 N/A
R7 N/A
R8 N/A
R9 N/A
Seepage Beds 802
B1
B2
B3
B4
Saliferous Beds 836
S1
Transition Beds 913
T1
T2
T3
T4
T5
BFC
Avana Dense 943
Avana Porous 1012
Khurmala A 1059
Total Depth
0
Depth (mMD) 914

Operations 00:00–06:00

Plan next 24 hrs

Overall Comments

Supervisor Geologist Ranjdar Ahmed


Wellsite Geologist Kovan waleed
Wellsite Geologist Twana alyas
Signature

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


DAILY GEOLOGY REPORT (DGR)

ENTRY DATA
318 GL 309 Rig
Date 7/9/2018 day spud 10/8/2018
Depth (mTVD RT 914 Progress
wer fars formation

sconnect hydraulic lines of Annular BOP. Untightened bolts btwn Annular BOP and Double Ram. N/D 13 5/

nnected hydraulic lines. Performed function test, OK.M/U and RIH 1 stand 5'' DP+ 13 3/8'' cup tester + 1 stand 5'' DP to test
500 psi, observed leakage from top seals of ram block and connection between casing head spool and riser spool.Changed t
ween casing head spool and riser spool.Tightened bolts between riser spool and mud cross. Well filled w/ water.Repeated p
flex hose connections. Changed ring. Injected teflon to blind ram.Closed Annular BOP and tested 550 psi f/ 5 min O.K. Increas
kage. Bleed off pressure.Opened Annular BOP and observed hydraulic oil in Annular BOP. Decided to change Annular BOP.Di
tightened bolts btwn Annular BOP and Double Ram. N/D 13 5/8'' x 5K (10K Flange) Annular BOP.

Inc 0.5 Azi


Inc 0.75 Azi
Inc 0.5 Azi
Inc 0.75 Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Inc Azi
Csg Size (inch) 20" Csg Depth (m)
Csg Size (inch) 17 1/2" Csg Depth (m)
Csg Size (inch) 13 3/8" Csg Depth (m)
Csg Size (inch) Csg Depth (m)
Csg Size (inch) Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GEOLOGICAL SUMMARY
Lithology Descriptions

Shows
Description

GAS DATA
Total C1 C2 C3
(%) ppm ppm ppm

Well site Top MD Actual Depth


Actual Difference
Depth TVDss
Thickness
(M) m +/-

735 -417

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


735 -417
735 -417
740 -422
755 -437
764 -446
778 -460
792 -474
792 -474
808 -490
816 -498
822 -504
829 -511
901 -583
911 -593
911 -593

06:00 UPDATE
Depth (mTVD RT) 914 Current Activity

N/U 13 5/8'' x 10K Annular BOP, tighten bolts btwn Annular BOP and Double Ram.M/U 13 3/8'' Cup Type Tes
5/8" 10M Annular BOP 600 psi f/ 5 min & 2000 psi f/ 20 min.O.K. Pressure test of 13 5/8" 10 M Pipe Ram 60

BOP Test, RIH and Drill out cement.

Team Crew
Days on Akram Maqsud
Days on Dlnya Hoshyar
Days on Ahmed Adnan

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


GYP.8
Rpt No 29
ROP m/h

Annular BOP and Double Ram. N/D 13 5/8'' x 5K (10K Flange) Annular BOP

5'' DP+ 13 3/8'' cup tester + 1 stand 5'' DP to test BOP stack.Closed Pipe Ram, P/T Pipe ram
ween casing head spool and riser spool.Changed top seal of ram blosks and tightened bolts
ol and mud cross. Well filled w/ water.Repeated pipe ram test w/600 psi observe leakage f/
nular BOP and tested 550 psi f/ 5 min O.K. Increased pressure to 2000 psi observed
n Annular BOP. Decided to change Annular BOP.Disconnect hydraulic lines of Annular BOP.
Flange) Annular BOP.

Csg Depth (m) 4m


Csg Depth (m) 406m
Csg Depth (m) 913m
Csg Depth (m)
Csg Depth (m)

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


ion

iC4 nC4 iC5 nC5


ppm ppm ppm ppm

Basis of Pick

BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells


BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)


BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells
BY ROP, CUTTING SAMPLE (LITHOLOGY) and correlation with around wells

Pressure test of 13 5/8" 10 M Pipe Ram 600 psi f/ 5 min & 2000 psi f/ 20 min. O.K.

BOP and Double Ram.M/U 13 3/8'' Cup Type Tester for Pressure Test.Pressure test of 13
n.O.K. Pressure test of 13 5/8" 10 M Pipe Ram 600 psi f/ 5 min & 2000 psi f/ 20 min. O.K.

Akram Maqsud Days Off


Dlnya Hoshyar Days Off
Ahmed Adnan Days Off

Kar Oil Gas / Field DepartmentConfidentialDaily Geology Report (DGR)