Você está na página 1de 16

PUNJAB NSC D3 : Journey to Top

PB YOY NSC Cell Level D3-


Turnaround

Turn around started in July, when NSC D3 was best for past 3 years ,
and in 3 months PB Attained No1 Position nationally in Both D1 and D3

Ericsson Internal | 2015-01-13 | Page 2


NSC Cell Level D3- Dec’13

PUNJAB was at Number 8 position in Dec13 Pan India with 80.62 % MTD

Ericsson Internal | 2015-01-13 | Page 3


NSC Cell Level D3- 10 months later

PB is at no1 for consistently two months in row .


Jan MTD is looking upward with Cell level touching magic figure of 92
Ericsson Internal | 2015-01-13 | Page 4
PB NSC D3 CL Turn Around
Contributors- Dec13 to Dec 14
% Gain( 7
PB NSC D3 Actions Bucketization (Dec’13 to Dec’14 Comparison) %)

Intra Cell Paramter Optimisation 3%


Periodic AFP in NSC BSC's 0.80%

Parameter Audit for Inconsistency & Standardization(


0.50%
HOC,POC, HO Para, Adj Para)

HR dimensioning based on TTCONGSHO 0.70%


No. of Sites integrated during the Year 0.87%
Physical Optimization/ HYEIGNE Improvement 1%
No. of Antenna Replaced  Cells /Mount Correction (Infra
0.25%
issues) etc

Ericsson Internal | 2015-01-13 | Page 5


PB NSC D3 CL Turn Around
Contributors- IHO Tuning Settings
COMMAND PARAMETER DESCRIPTION DEF.
Controlling parameters
RLIHC, RLIHP IHO Intra cell handover switch. ON
RLIHC, RLIHP SSOFFSETDL Offset for signal strength downlink. 0

RLIHC, RLIHP SSOFFSETDLAFR Offset for signal strength downlink for AMR FR connections 0

RLIHC, RLIHP QOFFSETUL Offset for quality uplink. 0


RLIHC, RLIHP QOFFSETULAFR Offset for quality uplink for AMR FR connections. 0
RLIHC, RLIHP QOFFSETDL Offset for quality downlink. 0
RLIHC, RLIHP QOFFSETDLAFR Offset for quality downlink for AMR FR connections 0
RLIHC, RLIHP TMAXIHO Timer for handover counter. time between intra-cell handovers 6
RLIHC, RLIHP MAXIHO Maximum number of consecutive intra-cell handovers 0
is a timer during which intra-cell handover is inhibited after
having performed too many consecutive intra-cell
RLIHC, RLIHP TIHO handovers. The parameter is also used when inhibiting a 10
subcell change from an underlaid to an overlaid subcell.
The parameter is set per subcell.

TINIT is set higher than TMAXIHO.


MAXIHO is set to 0 to inhibit HR to FR conversions due to Qualilty

Ericsson Internal | 2015-01-13 | Page 6


PB NSC D3 CL Turn Around
Contributors- IHO Tuning Impact

Implemented in NSC BSC Mid July and approx4 % gain in NSC D3

Ericsson Internal | 2015-01-13 | Page 7


PB NSC D3 CL turn around contributors- IHO
tuning impact BSC Wise
delta
w.r.t
COUNT Date &
BSC avergae
NSC/SC OF Time of Average 16-Jul 17-Jul 18-Jul 19-Jul 20-Jul 21-Jul 22-Jul 23-Jul 24-Jul 25-Jul 26-Jul 27-Jul 28-Jul
Name from
CELLS Change
previous
week
R_ROPAR NSC 260 17th July 87.54 1 79.15 84.35 88.21 82.51 83.27 83.27 87.45 86.31 81.37 84.03 85 83.46 86.54
PBRVR01 NSC 244 18th-July 73.33 -12.33 77.18 78.42 86.72 85.89 83.4 83.4 90.46 89.63 90.87 87.3 89.34 82.79 85.66
R_NKDR NSC 243 21st July 79.84 -13.16 86.5 86.67 80 81.48 81.07 92.18 92.59 93.42 94.24 93.83 90.53 86.83 93
R_SMRL NSC 349 21st July 86.2 -0.95 75.36 80 77.71 71.71 76.86 77.43 89.43 92.57 86.29 85.71 87.11 88.25 87.14
JALBSC1 NSC 221 22nd-July 71.37 -18.67 74.65 75 78.18 75.45 67.73 77.38 92.31 94.57 89.14 91.44 91.4 88.24 90.05
JALBSC3 NSC 266 22nd-July 88.56 -6.18 89.85 89.85 86.09 71.8 79.7 74.44 89.85 93.23 92.86 92.86 92.11 91.35 94.74
R_DSUA NSC 335 22nd-July 75.23 -11.33 72.75 73.05 76.35 71.86 67.16 68.96 80.9 89.58 80.54 83.63 79.1 77.91 86.57
PBRPG01 NSC 196 22nd-July 83.56 -8.28 85.2 84.18 79.59 87.76 81.63 82.14 92.86 91.84 90.82 86.73 88.27 85.2 91.84
PBRPL01 NSC 80 22nd-July 68.67 -13.83 74.68 60.76 63.29 74.68 65.82 55 80 75 82.5 82.5 83.75 77.5 82.5
JALBSC2 SC 280 23rd-July 89.99 -4.3 89.89 88.45 84.84 90.97 87 83.75 83.75 90.25 91.34 90.36 92.86 94.64 94.29
JALBSC5 NSC 326 23rd-July 81.37 -9.73 88.04 90.49 84.97 80.37 80.67 76.99 85.89 94.17 90.18 91.1 90.18 87.42 91.1
PBBSC6 SC 326 23rd-July 91.54 -4.48 92.94 90.18 91.1 92.26 85.58 94.17 94.17 94.48 94.48 95.09 94.17 84.97 96.01
PBRCB01 NSC 221 23rd-July 76.82 -8.45 72.94 76.47 74.21 77.83 73.76 79.19 76.02 90.95 85.52 86.43 85.97 82.35 85.27
PBRHS01 NSC 248 23rd-July 88.41 3.73 75.4 75.4 75.4 82.26 71.77 74.6 75.81 92.34 81.85 87.5 85.89 84.68 84.68
R_GDPR NSC 358 23rd-July 74.57 -9.79 71.79 75.42 75.7 72.91 67.32 64.53 73.18 84.08 79.89 80.17 76.54 73.74 84.36
R_NSPN NSC 370 23rd-July 85.58 -0.91 84.32 83.24 85.68 62.7 73.71 71.08 83.29 87.06 88.38 82.97 86.49 83.51 86.49
R_SRNA NSC 269 24th July 72.31 -4.52 69.52 59.48 65.43 64.31 59.85 58.36 68.03 71.38 69.52 65.43 69.89 67.66 76.84
R_JNTP NSC 366 25th-July 79.27 -7.89 83.24 79.67 81.04 60.71 68.49 69.67 82.24 81.69 83.33 85.25 83.88 80.6 87.16
R_MKSR NSC 225 25th-July 78.67 3.11 80.89 80 80 75.56 73.78 73.33 80 80.89 78.67 79.56 76 77.33 75.56
R_RJPR NSC 292 25th-July 80.23 -9.5 85.27 84.59 81.85 83.22 79.45 78.42 86.64 85.27 82.19 82.53 87.33 88.36 89.73
R_ZIRA NSC 218 25th-July 83.21 -7.15 85.71 84.86 83.03 77.98 77.52 73.39 79.36 83.03 87.61 87.61 85.78 81.65 90.37
R_ASR3 NSC 366 28th- July 73.27 -5.41 75.41 77.6 77.32 62.84 69.13 68.31 72.13 77.32 78.14 77.87 75.68 75.41 78.69
PBBSC5 SC 307 28th-July 94.42 -2.32 95.51 91.35 91.03 89.42 89.1 93.59 93.27 90.71 92.08 93.07 94.75 92.51 96.73
PBRBK01 NSC 220 28th-July 84.2 2.83 85.91 86.82 82.27 80.91 79.09 85.45 86.36 80 78.64 80.45 80.45 84.09 81.36
R_JNDL NSC 244 28th-July 91.53 -3.56 92.62 92.62 87.7 61.48 79.92 81.15 87.3 92.21 90.98 92.21 89.75 86.48 95.08
R_MOGA NSC 431 28th-July 89.8 -1.15 86.31 85.38 86.77 89.79 84.22 84.45 85.61 91.88 89.79 88.17 87.7 83.06 90.95
R_NAWA NSC 370 28th-July 74.57 -4.62 71.93 76.84 73.3 74.39 73.02 73.02 79.29 85.29 75.48 74.93 76.84 77.57 79.19

NSC BSC’s gained by 7 to 8 % on average


Ericsson Internal | 2015-01-13 | Page 8
NSC Cell Turn Around Contributors- IHO Tuning
Counter wise Analysis Worst BSC

CELEVEN CELEVEN CELEVEN CELEVEN Good


% DROP TCH Total HOINBQ HOSUCT HOATTH HOSUCH
Date BSC Hour CNDROP TNDROP %HSR % HR TI.HOIN TI.HOIN TI.HOINS TI.HOINB Qual
3 blocking Traffic A CHOPT RPACK RPACK
UQA DQA UC OCH (oto5) %

7/18/2014 JALBSC1 20 6417 2868 1.72 1.06 97.64 4705.17 62.17 1844 10411 10644 275 11 150 42987 42624 99.92
7/21/2014 JALBSC1 20 5872 2972 1.8 0.74 97.42 4547.98 60.54 1761 10622 11134 268 19 18 40978 40647 99.92
7/22/2014 JALBSC1 20 3994 1790 1.12 0.09 97.38 4524.84 75.84 4 24 26 0 0 92 53962 53305 99.92
7/23/2014 JALBSC1 20 3314 1615 1.07 0.04 97.87 4542.26 66.92 6 26 27 3 0 30 37998 37552 99.92

• IHO based on Quality become negligible


• Half rate packing -unpacking Increased

Ericsson Internal | 2015-01-13 | Page 9


NSC Cell Turn Around Contributors- IHO Tuning Impact
Drive Test results

PRE

POST

Drive test result confirm number of Intracell reduce significantly


Ericsson Internal | 2015-01-13 | Page 10
NSC Cell Turn Around Contributors-
Periodic AFP 2 times in Year

AFP implemented on 11th Jan’15, resulting in improvement by 1%

Ericsson Internal | 2015-01-13 | Page 11


PB NSC D3 CL turn around
Contributors – Impact of New Sites
%
Impact
Month Jan'14 Jan'15 of New
Total Sites on Air since Dec'13 463 463
Total New Cells on Air Since Dec'13 1387 1387
Top 5 Neighbour cells 6339 6339
D3>2.5 896 405 54.80
D1>2 291 177 39.18
Utilisation>150% 788 528 32.99
Traffic 104161.76 87657.34 15.84

54 % improvement in worst neighbour cells with new sites getting on air

Ericsson Internal | 2015-01-13 | Page 12


NSC Cell Turn Around Contributors- New
Sites Optimisation Process Strengthening

35.02 34.21 28.87 33.67 11.54


Month Feb'14 March'14 June'14 Aug'14 Jan'15
Total Active Cells 277 418 762 1001 1387
D3>5% 33 52 65 104 30
D3>2.5% 97 143 220 337 160

New site AT and Optimisation process was strenghtened in June14 ( Focus


on Tuning of parameter /additions on high traffic carrying cells)
Earlier New sites integrated cells were having more than 30 % cells in worst
D3 kitty which is now reduced to 12%

Ericsson Internal | 2015-01-13 | Page 13


NSC Cell Turn Around Contributors-
Other Best Practices Followed

 Traffic Dip tracker circulation on Daily basis helps in early


detection of various operational issues
 Parameter inconsistency checked at cell level every 15
days
 BSC level parameter check every month
 Focus on NSC capping cells , separate tracker is floated
to operations
 Separate consolidated Physical Optimisation tracker is
maintained which helps tracking and improves in
correcting Site database as well
 Height mismatch in old/new expansion cases is identified
and rectified

Ericsson Internal | 2015-01-13 | Page 14


NSC Cell Turn Around Contributors-
Other Best Practices Followed

 Half rate /FPDCH dimensioning for TRX block cases on


daily basis for TCH Blocking and reversion post
correction has given significant improvement in blocking
KPIs
 Dip break tracker floated by NPI on daily basis
 Neighbour audit ( including Zero attempt cells ) fortnightly
 Degradation tracker on weekly basis to minimise cells
falling in consistent worst kitty.
 Site visit tracker of NPI engineer is maintained and
mandatory 5 days visit per month for worst D3 cell is
ensured.

Ericsson Internal | 2015-01-13 | Page 15