JINDAL POWER LTD

INSTRUCTION

Following equipment changeover schedule is to be followed for Unit-1:-

1. 1st of every month : 1. Vapour Extraction. Fans of MOT /


Generator / and Seal steam.

2. 1st and 15th of every month : 1. D/A level controllers CD-14 / CD-
17 in ‘B’ shift.
2. Generator Seal Oil Pump
3. DMCW PUMP

3. Every Monday : 1. LOP of Mill – A


2. CEPs.
3. ECO Hopper Pump
4. DMCW BOOSTER PUMP

4. Every Tuesday : 1. LOP of Mill – B, LOP Of PA Fan-A


2. DMCW pump / Service water pump.
3. Boiler Feed Pump ( IN PRESENCE
OF ELECT & C&I IN CASE OF BFP-
C)

5. Every Wednesday : 1. LOP of Mill- C, LOP Of PA Fan-B


2. Vacuum pump of condenser.
3. BALP
4. ACW PUMP U-1

6. Every Thursday : 1. LOP of Mill – D, LOP Of ID Fan-A,


LOP Of ID Fan-B
2. Fire water pump (Trial To Be Taken).
3. BAHP.
4. ACW PUMP U-2

7. Every Friday : 1. LOP of Mill – E, LOP Of FD Fan-A,


LOP Of FD Fan-B
2. Air compressor.
3. ESP vacuum pumps depending on
availability.
4. HP/ LP Seal Water Pump In ASPH-I

8. Every Saturday : 1. HFO pumps.


2. LDO Pump.
3. LOP Of APH-A, B Both Guide
Bearing & Support Bearing
4. HP/ LP Seal Water Pump In ASPH-II
JINDAL POWER LTD