Escolar Documentos
Profissional Documentos
Cultura Documentos
b Volume decomposition
a a) 1 Cuboid = a·b·h
b) 4 Pyramids = 4·(A-a)/2·(B-b)/2·h/3
c) 4 Prisms = 1/2·b·h·(A-a)+1/2·a·h·(B-b)
h
Total = (A·B+a·b+(A·b+a·B)/2)·h/3
h = 2.5 m, A = 8 m, B = 12 m, a = 2 m, b = 6 m
A V = (8·12+2·6+(8·6+2·12)/2)·2.5/3 m3 = 120 m3
B
wGs
(3) S r = → Sr = 0.20×2.5/0.667 = 75%
e
Embankment: ρd = 1.6 g/cm3, w = 0.20 (mass conservation of soil and water)
(4) ρ=
t (1 + w ) ρ d → ρt = (1+0.20)×1.6 g/cm3 = 1.92 g/cm3
W
g t ρ=
= tg → W = 120 m3×1.92 g/cm3×9.8 m/s2 = 2.26×106 N = 2.26 MN
V
Excavation site: ρt = 1.8 g/cm3
W
g t ρ=
(5) = tg → V = 2.26 MN/(1.8 g/cm3×9.8 m/s2) = 120 m3×1.92/1.8 = 128 m3
V