STRATEGIC RESERVOIRS AT MAKKAH PHASE II & TAIF PHASE I

REVISION SHEET

DOC. TITLE: GA Drawing of Tank #1

FROM REV : A FROM REV : B

DOC. NO : 7 5 - Q P 1 0 - S - 0 0

REV. DATE : 5/23/2018

CHANGES TO THE DOCUMENT :

ENGINEER'S NOTE NO CONTRACTOR'S ACTI

The following comments shall be considered for above mentioned documents as following:

1. In “drawing title” and “location” cells, it is stated that this general


arrangement is for tank #1 in “Sharai” site which had been moved to the new Noted and revised accordingly
location in “Al Moghamass”.

2. The sit key plan is for the old site in “Sharai”. Noted and revised accordingly

3. Qiblah direction is wrong due to using wrong site layout. Noted and revised accordingly

4. Pump outlet nozzle is not located (as per the approved Tank Sizing Noted and revised as per Tank Sizing Calculat
Calculation Report AH-EH-D-0081). Storage Tanks at Makkah (75-QC20-J-005-Re

5. Outlet and overflow nozzles level should match with approved Tank Sizing Noted and revised as per Tank Sizing Calculat
Calculation Report AH-EHD-0081. Storage Tanks at Makkah (75-QC20-J-005-Re
STRATEGIC RESERVOIRS AT MAKKAH PHASE II & TAIF PHASE I

REVISION SHEET

DOC. TITLE: GA Drawing of Tank #1

FROM REV : A FROM REV : B

DOC. NO : 7 5 - Q P 1 0 - S - 0 0

REV. DATE : 5/23/2018

CHANGES TO THE DOCUMENT :

ENGINEER'S NOTE NO CONTRACTOR'S ACTI

6.Bottom slope should be changed to 1% according to document number


Noted and revised accordingly
(QP10-Q-5588) in tender document instead of 1:120.

7. Site class B should be changed to site class D in earthquake data according


Noted and revised accordingly
to (SBC301 - Section 14.1 - clause 14.1.11).

8. Height of aluminum dome roof should be provided. Noted and revised accordingly

As per API-650-12th-Add-2-Jan-2016 Table 5


9. Width of roof walkway should be provided minimum width of the walkway shall be 610 m
making adjustments at all projections.

10 . Detail of Periphery walkway and handrail at the top of tank should be Refer Mark A1 in tank accessories table for de
provided. Periphery walkway and handrail

Please note that, when the plates to be procure


manufacturer directly i.e from the mill (and no
the plate thicknesses shall be ordered as per th
thickness values since the Mills are capable of
plates with the thicknesses in decimal values &
measured easily with calibrated gauges/ instru

All our thickness calculations are in complian


The thickness values cannot be rounded to nex
11 Shell plates that mentioned in drawing are (44.1mm, 42.6mm, 36.15mm, thickness since the plates tonnage/ weight wil
29.65mm, 23.2mm, 16.75mm and 10.45mm), it is recommended to provide significantly.
plates thickness with right number in order to avoid difficulties in finding
plates with thicknesses nearest to 0.1mm.
STRATEGIC RESERVOIRS AT MAKKAH PHASE II & TAIF PHASE I

REVISION SHEET

DOC. TITLE: GA Drawing of Tank #1

FROM REV : A FROM REV : B

DOC. NO : 7 5 - Q P 1 0 - S - 0 0

REV. DATE : 5/23/2018

CHANGES TO THE DOCUMENT :


11 Shell plates that mentioned in drawing are (44.1mm, 42.6mm, 36.15mm,
29.65mm, 23.2mm, 16.75mm and 10.45mm),
ENGINEER'S NOTEit NOis recommended to provide CONTRACTOR'S ACTI
plates thickness with right number in order to avoid difficulties in finding
plates with thicknesses nearest to 0.1mm.
Metscco is procuring the plates from Plates M
Mill. The mill tolerance is already considered
Plates manufacturer has already acknowledge
Metscco Purchase Order with all the technical
has further complied to Metscco’s clause whic
‘Negative tolerance in the thickness is not acc
For your reference, please find attached attac
Manufacturers Purchase Order Acknowledgem
technical compliances.

OTHER CHANGES (REASONS FOR CHANGES) :


None

OTHER DOCUMENTS AFFECTED :


None

Submitted :

Yahya Mustata Date


Distributed : SR (PED) SR (S&R) SF EH
AT MAKKAH PHASE II & TAIF PHASE I

EVISION SHEET

ES TO THE DOCUMENT :

CONTRACTOR'S ACTION

oned documents as following:

Noted and revised accordingly

Noted and revised accordingly

Noted and revised accordingly

Noted and revised as per Tank Sizing Calculation Report for


Storage Tanks at Makkah (75-QC20-J-005-Rev E)

Noted and revised as per Tank Sizing Calculation Report for


Storage Tanks at Makkah (75-QC20-J-005-Rev E)
AT MAKKAH PHASE II & TAIF PHASE I

EVISION SHEET

ES TO THE DOCUMENT :

CONTRACTOR'S ACTION

Noted and revised accordingly

Noted and revised accordingly

Noted and revised accordingly

As per API-650-12th-Add-2-Jan-2016 Table 5.17 point #2 : The


minimum width of the walkway shall be 610 mm (24 in.), after
making adjustments at all projections.

Refer Mark A1 in tank accessories table for detials of Detail of


Periphery walkway and handrail

Please note that, when the plates to be procured from the plates
manufacturer directly i.e from the mill (and not from the stockiest),
the plate thicknesses shall be ordered as per the desired designed
thickness values since the Mills are capable of manufacturing the
plates with the thicknesses in decimal values & those can be
measured easily with calibrated gauges/ instruments.

All our thickness calculations are in compliance with API 650.


The thickness values cannot be rounded to next higher value of
thickness since the plates tonnage/ weight will increase
significantly.
AT MAKKAH PHASE II & TAIF PHASE I

EVISION SHEET

ES TO THE DOCUMENT :

CONTRACTOR'S ACTION

Metscco is procuring the plates from Plates Manufacturer i.e from a


Mill. The mill tolerance is already considered in the thicknesses.
Plates manufacturer has already acknowledged the receipt of
Metscco Purchase Order with all the technical compliances. Mill
has further complied to Metscco’s clause which states that
‘Negative tolerance in the thickness is not acceptable’.
For your reference, please find attached attachement#1 (Plate
Manufacturers Purchase Order Acknowledgement) with all the
technical compliances.

Date
EH