REVISION SHEET
DOC. NO : 7 5 - Q P 1 0 - S - 0 0
The following comments shall be considered for above mentioned documents as following:
2. The sit key plan is for the old site in “Sharai”. Noted and revised accordingly
3. Qiblah direction is wrong due to using wrong site layout. Noted and revised accordingly
4. Pump outlet nozzle is not located (as per the approved Tank Sizing Noted and revised as per Tank Sizing Calculat
Calculation Report AH-EH-D-0081). Storage Tanks at Makkah (75-QC20-J-005-Re
5. Outlet and overflow nozzles level should match with approved Tank Sizing Noted and revised as per Tank Sizing Calculat
Calculation Report AH-EHD-0081. Storage Tanks at Makkah (75-QC20-J-005-Re
STRATEGIC RESERVOIRS AT MAKKAH PHASE II & TAIF PHASE I
REVISION SHEET
DOC. NO : 7 5 - Q P 1 0 - S - 0 0
8. Height of aluminum dome roof should be provided. Noted and revised accordingly
10 . Detail of Periphery walkway and handrail at the top of tank should be Refer Mark A1 in tank accessories table for de
provided. Periphery walkway and handrail
REVISION SHEET
DOC. NO : 7 5 - Q P 1 0 - S - 0 0
Submitted :
EVISION SHEET
ES TO THE DOCUMENT :
CONTRACTOR'S ACTION
EVISION SHEET
ES TO THE DOCUMENT :
CONTRACTOR'S ACTION
Please note that, when the plates to be procured from the plates
manufacturer directly i.e from the mill (and not from the stockiest),
the plate thicknesses shall be ordered as per the desired designed
thickness values since the Mills are capable of manufacturing the
plates with the thicknesses in decimal values & those can be
measured easily with calibrated gauges/ instruments.
EVISION SHEET
ES TO THE DOCUMENT :
CONTRACTOR'S ACTION
Date
EH