Construction Sequence of a House
4
ACC Limited Good construction practices 26.06.2010
Formwork
5
ACC Limited Good construction practices 26.06.2010
Why cover blocks?
6
ACC Limited Good construction practices 26.06.2010
Do not use of Aggregates as Cover Blocks
7
ACC Limited Good construction practices 26.06.2010
8
ACC Limited Good construction practices 26.06.2010
Cover Blocks for Durability
9
ACC Limited Good construction practices 26.06.2010
Cover Blocks
10
ACC Limited Good construction practices 26.06.2010
Control Slump
11
ACC Limited Good construction practices 26.06.2010
Concrete Mixing
Avoid Manual concrete mixing.
12
ACC Limited Good construction practices 26.06.2010
Water
Add Water
by
Measurement
at
Construction
Site
13
ACC Limited Good construction practices 26.06.2010
14
ACC Limited Good construction practices 26.06.2010
Segregation & Bleeding
Avoid
Segregation
&
bleeding
of
concrete
15
ACC Limited Good construction practices 26.06.2010
Segregation
16
ACC Limited Good construction practices 26.06.2010
17
ACC Limited Good construction practices 26.06.2010
Placing of Concrete
18
ACC Limited Good construction practices 26.06.2010
Compaction
Compaction means removing
air from concrete
20
ACC Limited Good construction practices 26.06.2010
21
ACC Limited Good construction practices 26.06.2010