18. Record consumed Stock Items (Materials Record – Direct Application) ....................................................................................... 36
Option 1: Record a new reading on the Reading Points window of an item ................................................................................ 47
Step 3: (optional) F ill the Specifications tab with technical information required for the selected object
type (previously define d on the Configuration settings)
Step 1: Select the “Compute based on R ecords” option on item’s Operational Data tab
1. Click on New
2. Select record’s Date and Time
3. Fill the Partial Record field
4. Click on OK to save
1. Click on New
2. Activate the Direct Application option
3. Select the Cost Document
4. Confirm the Operator, Fuel and Item
5. Select record’s Date and Time
6. Fill the item’s Partial Record and the Quantity of fuel
7. Select the cost Account
8. Click OK to save
1. Click on New
2. Select Fuel Supply Record option
1. Click on New
2. (optional) Select the Item Type on “…” button
3. If an item type had been selected, the Code is automatically generated;
If not, this field is free
4. Fill the Description
5. Define the estimated duration for this standard work (in hours)
6. (optional) Select the Work Description type
7. Select the Criticality level
8. In the Tasks tab, you can describe the tasks to be realized
In the other tabs (Man-Hours, Stock Items, Other, Documents) you can
estimate/attach all the resources for this work:
Man-Hours and its cost
Materials and its cost
Suppliers and its cost
Documents with relevant information for this work
th th th
(check 11 , 12 and 13 chapters of this manual)
9. Click OK to save. Repeat this procedure as many times as necessary.
Note: Maintenance Plan (MP) = group (the list/the group) of all Maintenance Schedules (MSch)
Example: Define a MSch of item’s maintenance plan (MP without maintenance cycle)
1. Click on New
2. Select the Work Type
3. Select Work Descriptions tab to visit the
Standard Work Description Library
4. Fill the Description for the MSch
5. Click on New and choose Work
Description Library option. Select all the
standard works you want to import to the
MSch
6. It is possible to show/hide the tasks of
the standard works descriptions imported
If there was no Standard Work
Descriptions at the Library:
a) Create a new one now:
Click on New → New Work Description
b) Use the Tasks tab to describe the work,
use the Man-Hours tab to estimate MH
7. Pick the work descriptions you want to stablish Library Connection. If this feature is
and its costs, use the Stock Items tab to
picked you can edit in the library the work and all the maintenance plans that
estimate materials and its costs, use the
have that work will be automatically updated
Other tab to estimate suppliers and its
8. Edit the Periodicity of the work based on Calendar and/or Records (running records)
costs and estimate the duration of the
9. Once we are creating a MP without maintenance cycle the Next MSch is itself
work (in hours)
Click OK to save. Repeat this procedure as many times as necessary.
Navaltik Management, Lda. 11 February 2018
ManWinWin Express – User Manual
Example: Repeat a MSch from an item to another item of the same object type
Example: Repeat a complete MP for an item to one or more items of the same object type
Notes:
Nr. of systematic WO = Nr. of MSch that compose a MP (MP without maintenance cycle)
Nr. of systematic WO = Nr. of maintenance cycles that compose a MP (MP with maintenance cycle(s))
Step 2: Create a new Work Order (WO) and fill the Origin tab
1. Click on New
2. Select the MSch previously prepared that
supports this WO. The information contained in
that MSch is automatically imported to the WO
3. (optional) Select the internal or external
Performer/Manager
Step 2: Create a new Work Order, type a Description and fill the Origin tab
1. Click on New
2. Type a Description
3. Select the Work Type
4. Indicate the estimated repair time (in hours)
5. (optional) Select the internal or external
Performer/Manager
1. Click on Issue
2. Indicate the Issued and Start Date and Time
3. Click OK to save
Step 2: Terminate a WO
Note: When you terminate a systematic work order, it is automatically created the following one, based on the
periodicity which is defined on the Maintenance Schedule (of the Item´s Maintenance Plan)
Step 3: Close a WO
1. Click on Closing
2. Click OK to save
3. Click Yes to confirm the operation
1. Click on Tools
2. Select Records → MH Record
1. Click on New
2. Select or confirm the Cost Doc. associated with the Employee
selected (ignore this step if you are not using Cost Documents)
3. Select or confirm the Employee (Account and MH Cost fields will be
automatically filled)
4. Indicate the Date and the Start and End hours (MH Effort and Cost
fields will be automatically filled ; you can also apply a Factor to the MH
effort or edit the MH cost)
5. Select where to allocate/impute the MH: WO, Item or simply to a Cost
Center (or Client)
6. Select or confirm the Cost Account
7. Click OK to save
1. Click on New
2. Select MH Record option
1. Click on Tools
2. Select Records → Materials Record
1. Click on New
2. Select Direct Application option
3. Select or confirm the Cost Doc. (ignore this step if
you are not using Cost Documents)
4. Select the Stock Item
5. Indicate the Date and Time
6. Indicate the Quantity
7. Edit or confirm the Unit Cost and VAT (can be 0%)
8. Select where to allocate/impute the Material: WO,
Item or simply to a Cost Center (or Client)
9. Select or confirm the Cost Account
10. Click OK to save
1. Click on New
2. Select Materials Record option
1. Click on Tools
2. Select Records → Other Record
1. Click on New
2. Select or create the Cost Doc. (ignore this step
if you are not using Cost Documents)
3. (optional) Select the Supplier
4. Fill the Item and Description fields
5. Indicate the Date
6. Edit or confirm the Cost and VAT (can be 0%)
7. Select where to allocate/impute the Material:
WO, Item or simply to a Cost Center (or Client)
8. Select or confirm the Cost Account
9. Click OK to save
1. Click on New
2. Select Other Record option
1. Click on New
2. Fill the Code
3. Fill the Description
4. Fill the Unit
5. Click OK to save
1. Click on New
2. Select the Parameter
3. Fill Minimum, Maximum, Alarm 1, Alarm 2 fields
4. Click OK to save
Step 1: Open the New Reading window of a Reading Point and record the reading
Step 2: Open the Reading window of a Reading P oint and record the reading
1. Click on New
2. Select the Date from which this
RQT is accounted by the application
3. Edit the schedule (Start and End) or
the Required Time (RQT Day) for the
week (from Monday till Sunday)
4. Click OK to save
1. Click on New
2. Select the Date from which this OPT is
accounted by the application
3. Select the intended option. In this case,
OPT=RQT-DTRM:
RQT - Required Time
DTRM - Down Time Related to Maintenance
4. Click OK to save
1. Click on New
2. Pick on Down State column all the levels that undergo down
time (only the item, or the item and the levels above)
3. Edit on From and To columns the date and time of down time
4. Click OK to save
Step 2: Create the FMEA Tree for each Component of each Item Type
Note: The list/tree of item types and their components were previously created on Configuration button (see
Configuration user’s manual)
1. Select on the tree the Cause for which you want to develop the FMEA tree
2. Click on New
3. Select the Standard Work Description intended (or create a new one by
clicking on New on Standard Work Description Library window)
4. Click on Go To
Step 1: Fill the Diagnosis tab (when you are registering a WO)
Step 2: Fill the Work Descriptions tab (when you are registering a WO)
Step 3: Check the automatic development of the FMEA tree (after terminate the WO)
Note: The process of creating indicators is equal for any indicators type (economic, technical, organizational or
custom)
1. Select Dashboard module
2. Click on Indicators button
3. Select Technical Indicators
1. Click on Compute
2. Click OK to save
Example: Create the indicator that compute the percentage of pump 1 corrective work orders versus pump 1 and 2
corrective work orders
Note: The process of creating indicators is equal for any indicators type (economic, technical, organizational or
custom)
1. Select Dashboard module
2. Click on Indicators button
3. Select Custom Indicators
1. Click on Compute
2. Click OK to save
Note: You can introduce values for manual parameters in the systems (at any level of Functional Organization), cost
centers and maintenance items
1. Click on a New
2. Click on Parameter and
select the one that you want
3. Indicate the Year
4. Edit the values of that
parameter for that year
5. Click OK to save
1. Click on New
2. Fill the Code
3. Fill the Description
4. Select Start and End dates
5. Select the Account you want to budget
6. Click on New
7. Select the Cost Center for that Account that you want to budget
8. Edit the Budget value for that Account and Cost Center
9. Click on OK to save
Repeat from point 5, as many times as the entries to be
budgeted.