This inspection report details 10 issues found during an inspection of equipment BC02 and BC04 by the EHS team. Corrective actions were assigned to maintenance manager (MM) and production manager (PM) along with target completion dates. Issues included protruding metal, unguarded parts, material buildup, and other safety hazards that required guards, covers or reinforcements to be added. All corrective actions were assigned target completion dates between October 24-28, 2018.
This inspection report details 10 issues found during an inspection of equipment BC02 and BC04 by the EHS team. Corrective actions were assigned to maintenance manager (MM) and production manager (PM) along with target completion dates. Issues included protruding metal, unguarded parts, material buildup, and other safety hazards that required guards, covers or reinforcements to be added. All corrective actions were assigned target completion dates between October 24-28, 2018.
This inspection report details 10 issues found during an inspection of equipment BC02 and BC04 by the EHS team. Corrective actions were assigned to maintenance manager (MM) and production manager (PM) along with target completion dates. Issues included protruding metal, unguarded parts, material buildup, and other safety hazards that required guards, covers or reinforcements to be added. All corrective actions were assigned target completion dates between October 24-28, 2018.