PROJECT DESCRIPTION OBJECTIVELY SOURCES OF ASSUMPTIONS AND PRE
INTERVENTION LOGIC VERIFIABLE VERIFICATION CONDITIONS
INDICATORS (OVIs) (SOV)
1. 1.1.
1.2. 1.1.
2. 2.1. 1.2.
2.2. 2.1.
3. 3.1. 2.2.
3.2. 3.1.
3.2.
The activities (sufficient and necessary) that have Main resources (physical Means translated into Important events, conditions or decisions
to be undertaken by the project in order to produce and non-physical costs. outside control of the project which must
results. necessary to carry out prevail
activities). VLIR-UOS
1.1. budget lines could be
4 1.2. used. investment costs
1.3. operational costs
investment items personnel costs
2.1. main operational scholarship costs
2.2. expenses coordination costs
2.3. number, level and
person months of TOTAL:
3.1. personnel
3.2. number and level
3.3. of scholarships
Pre conditions
5
Conditions that need to be fulfilled before
the project can start.
the green coloured cells (A1 – A2 – A3) need to be completed and described in sufficient detail
the yellow coloured cells (A4 – B4- C4 – D2 – D3 – D5) need to be completed in an indicative manner
the white cells do not need to be completed at this stage