PROJECT HAZID Study SESSION DATE

CLIENT JOB NO
SECTION
PREVENTIVE &
MAJOR ACTION
GUIDEWORD CAUSES MITIGATION F S R RECOMMENDATION F S R
EFFECTS BY
MEASURES

1. Fabrication / 1.1. Complexity


Installation 1.2.Transportation
2.1.1.1. Ensure work
2.1. personnel area is clear and
2. Impact / 2.1.1. Crushing /
presence in work access and egress
Crushing Injury / Fatality
area allow room to avoid
trapping situation.
3.1.1.1. Emergency
procedures should be
in place in case of
3.1. Improper 3.1.1. Damage
load movement.
3. Unexpected slinging of load the Crane /
3.1.1.2. Position
movement 3.2. Unbalanced Crashing /
slings correctly and
load Injuries
check load balance,
lower and re-sling if
not balanced.
4.1.1.1. Ensure all
materials are stacked
4. Incorrect No foreseen in a stable condition
Stacking Hazards and packers are
suitable and in good
condition.

5.1. Improper 5.1.1. Damage the 5.1.1.1. Only qualified


5. Slinging Crane / Crashing / persons to sling the
slinging of load
Injuries load.