DETAILED ATA-16 JOBS DETAILS
LAGGING BEARINGS
LOW SPEED
COUPLINGS
condition ok
LAGGING BEARINGS
HEAD DRUM NOT DONE NOT CHANGED
SNUB DRUM NOT DONE NOT CHANGED
DRUMS TAIL DRUM NOT DONE NOT CHANGED
TAKE-UP NOT DONE RENEWED
BEND DRUMS DONE RENEWED
CARRYING
ROLLERS
RETURN
CARRYING FRAMES
JD 1307 FRAMES
A&B
RETURN FRAMES
JD 1307 FRAMES
CARRYING SELF ALIGNING
A&B
RETURN SELF ALIGNING
BELT
condition ok
ondition ok
Old ball mill motor and gear box removed fro location for overhauling .
Motor shaft play problem .Rotor dis mantled and shaft machining and balacing done
Gear box DE & NDE side oil seals renewed, .H.S coulpng grid teeth damaged. Old motor side
coupling machined to required size and positioned.
Gear box and motor base sand blasting done
GB base bolts thread damaged. Base hole cleaning and tapping done. New bolts issued from ware
house (2"1/2" x 5" )bolts size and machined to required size.
Gear box overhauling completed shifted to site for alignment. COMPLETED
OBM MOTOR had problem with H.S coupling fixing.Had difference of about 20 tou clearence on
PA 606 shaft.Coupling fixing area had machined along with bearing part area during repair job
motor side coupling materila bulid up done and machined to required size.
Motor along with coupling to be shifted to area and alignment to be finished
Pinion bearings to be inspected and greasing to be done.
Girth Gear sump cleaning and trunion bearins oil renewal.
Hydralic lift pumps suction & discharge side overhauling.
OBM H.S & L.S Laser Alignment done.During running condition monitoring readings taken.Motor
side rotor unbalance problem observed.Motor base back bolts looseness observed.
Final inspection of grids .Gaps to be checked in between grids .final inspection done
OBM discharge Screw conveyor NDE side chain, sprocket removed from location fro renewal.
Dimensions taken and new sprocket given for machining.
DE & NDE side bearings inspected. Found NDE SIDE BEARING was damaged .
JD 615 Nde side bearing renewed with 22222 EK / C3 bearing and with new sleeve. COMPLETED
All the doors opened from location for operation cleaning and flute to be inspected fro damages.
New sprocket to be positioned and Alignment to be done and chain and guard to be fixed
screw conveyor top covers to be closed and handovering.
Gear box removed from location oil seals and hold back to be renewed renewed.
New hold back fixed to gear box and erected in position
Alignmnet to be done. Oil to be checked and top up to be done.
JD 616 Tail end shaft side both east and west bearings renewed. COMPLETED
Total 16no's buckets during ATA and 18 no's buckets before ATA were renewed.
scaffoding to be arranged for side covers patch work.
Damaged covers welded and handedovered..
OBM air slide covers opening .cloth cleaning and renewal ,box up
NBM air slide covers opening .cloth cleaning and renewal ,box up
SABCON NBM discharge end air slide covers opening .cloth cleaning and renewal ,box up COMPLETED
ENGINEE
GRS discharge air slide covers opening .cloth cleaning and renewal ,box up
RING
GRS air pads covers opening ,cloth cleaning and renewal ,box up
PA 606 OLD BALL MILL AIR SLIDE CLOTH RENEWAL JOB IN PROGRESS BY BHUVANESWARI. SERVICE PR TO BE MADE.
29 HS AND LS COUPLING GRID TO BE RENEWED INSPECTED LOW SPEED GRIDS TO BE RENEWED. AVALIBLE IN STORES
BOLTS PR :- 1262135 GRIDS
PR :-1260462
OBM SR.PR :- 401815
Torque wrench service pr to be
Girth gear split ring bolts torquing to be done. done
SPRAY LUBRICATION SYSTEM TO BE INSTALLED INSTALLED . PR:-1261696
6 DRIVEN SPROCKETS TO BE RENEWED Material received .
7 SCREW CONVEYOR - (OLD MILL NDE BEARING TO BE RENEWED
JD 615
DISCHARGE END)
SCREW TO BE INSPECTED
8 PR:-1241391
9 DAMAGED BUCKETS TO BE CHANGED 26 BUCKETS RENEWED AVALIBLE :-44 NO'S
20th
18th
21st
22nd
21st