2019 ROADWAY CAPITAL IMPROVEMENT PROGRAM

DEPA R TMEN T OF P UB L I C W OR KS

This list includes only: asphalt and concrete roadway improvements, and bridge rehabilitation projects.
This is not a comprehensive list of the larger 2019 transportation capital improvement program.
Updated: January 23, 2019. Project list subject to change.

Project Type Project Number Project Name / Segment Limits


Project Type
Bridge Rehabilitation Project Number 79th Street over Fall Creek (0701F)
BM-07-017 Project Name / Segment Limits
Bridge Rehabilitation BM-11-100
BM-07-017 Monon Trailover
79th Street overFall
Kessler
CreekBlvd
(0701F)
Bridge Rehabilitation BM-14-027
BM-11-100 63rd
MononStreet
Trailover
overIndian
KesslerCreek
Blvd (1406F)
Bridge Rehabilitation BM-15-006
BM-14-027 Dandy Trail over Indian
63rd Street Big Eagle Creek
Creek STP FY 2019
(1406F)
Bridge Rehabilitation BM-16-502
BM-15-006 Georgetown Rd over
Dandy Trail over Dry Run
Big Eagle (1610F)
Creek STP FY 2019
Bridge Rehabilitation BM-17-060
BM-16-502 Cold Spring Road
Georgetown overDry
Rd over Crooked Creek (1715F) and 38th Street EB over White River (1703F)
Run (1610F)
Bridge Rehabilitation BM-20-002
BM-17-060 38th Street over
Cold Spring RoadCSX
overRailroad
CrookedSTP FY 2019
Creek (1715F) and 38th Street EB over White River (1703F)
Bridge Rehabilitation BM-25-020
BM-20-002 Senate Ave.over
38th Street overCSX
Fall Railroad
Creek (2527L)
STP FYSTP FY 2019
2019
Bridge Rehabilitation BM-25-179
BM-25-020 Commerce
Senate Ave.Ave.
overover Pogues(2527L)
Fall Creek Run Bridge STP
STP FY FY2020
2019
Bridge Rehabilitation BM-25-180
BM-25-179 Oriental
Commerce St over
Ave. Pogues Run (2520L)
over Pogues Run Bridge STP FY2020
Bridge Rehabilitation BM-30-010
BM-25-180 Lynhurst Drive
Oriental St overover MarsRun
Pogues Ditch (3002F) STP FY 2019
(2520L)
Bridge Rehabilitation BM-41-016
BM-30-010 Franklin
LynhurstRoad
Driveover
overBig RunDitch
Mars Creek (4102F)
(3002F) STP
STP FYFY 2020
2019
Bridge Rehabilitation BM-41-017
BM-41-016 Edgewood over
Franklin Road Little
over BigBuck
Run (4105F)
Creek (4102F) STP FY 2020
Bridge Rehabilitation BM-45-005
BM-41-017 Morgantown Road
Edgewood over over
Little Pleasant
Buck Run STP FY 2020
(4105F)
Bridge Rehabilitation
Replacement BM-32-009
BM-45-005 Pagoda Drive Road
Morgantown (Garfield
overPark) over Run
Pleasant Pleasant Run(3216L)
STP FY 2020 STP FY 2019
Bridge Replacement BR-11-003
BM-32-009 Westfield Blvd(Garfield
Pagoda Drive over IWCPark)
Canal (1101F)
over STP Run(3216L)
Pleasant FY 2020 STP FY 2019
Bridge Replacement BR-13-047
BR-11-003 Fall Creek Blvd
Westfield over over
Blue IWC
Creek (1304F)
Canal (1101F) STP FY 2020
Bridge Replacement BR-18-002
BR-13-047 Monon Trail
Fall Creek over
over 38th
Blue Street
Creek CMAQ FY 2020
(1304F)
Bridge Replacement BR-19-008
BR-18-002 Sheridan Avenue
Monon Trail over Bridge over Pogues
38th Street CMAQ FYRun (1920L) STP FY2020
2020
Bridge Replacement BR-32-133
BR-19-008 Bridge over
Sheridan Pleasant
Avenue Runover
Bridge Creek
Pogues Run (1920L) STP FY2020
Bridge Replacement BR-37-030
BR-32-133 Hanna Dollar Hide
Bridge over Pleasant Run(3612L)
Creek
Resurface
Bridge Replacement RS-18-007
BR-37-030 Pennsylvania StreetHide
Hanna over Dollar Resurfacing
(3612L) from 12th Street to 25th Street
Resurface ST-19-073
RS-18-007 College Ave from
Pennsylvania FallResurfacing
Street Creek Pkwyfrom
to 38th
12thStStreet to 25th Street
Resurface ST-19-075
ST-19-073 Southport
College AveRdfrom
fromFall
Bluff Rd to
Creek Meridian
Pkwy to 38thStSt(Highway 135)
Resurface ST-19-075 Southport Rd from Bluff
Meridian
Rd toStMeridian
(HighwaySt135) to US 31
(Highway 135)
Resurface ST-19-104
ST-19-075 52nd St from
Southport Rd High
fromSchool Rd St
Meridian to (Highway
Lafayette 135)
Rd to US 31
Resurface ST-19-104 64th
52ndSt
Stfrom
from Michigan Rd Rd
High School to Coburn Ave Rd
to Lafayette
Resurface ST-19-104 91st
64th St
St from
from Ditch Rd toRdWestfield
Michigan to CoburnBlvd
Ave
Resurface ST-19-104 Ditch
91st StRdfrom
fromDitch
Westland Rd to 79thBlvd
Rd to Westfield St
Resurface ST-19-104 Harcourt Rd from
Ditch Rd from Westlane
Westland Rd79th
Rd to to Dugan
St Dr
Resurface ST-19-105
ST-19-104 21st St from
Harcourt Senate
Rd from Blvd to Capital
Westlane Ave Dr
Rd to Dugan
Resurface ST-19-105 52nd
21st StStfrom
fromSenate
Keystone
BlvdAve
to to Allisonville
Capital Ave Rd
Resurface ST-19-105 52nd St from Westfield BlvdtotoAllisonville
Keystone Ave College Ave Rd
Resurface ST-19-105 Shadeland AveWestfield
52nd St from from I-70Blvd
WBtoExit RampAve
College to Kennsington Dr
Resurface ST-19-106
ST-19-105 16th St from
Shadeland Polco
Ave fromStI-70
to Lafayette Rd to Kennsington Dr
WB Exit Ramp
Resurface ST-19-106 Crawfordsville Rd from
16th St from Polco St toCunningham
Lafayette RdRd to Auburn St
Resurface ST-19-106 Kessler Blvd NDr
Crawfordsville Rdfrom
from16th St to Lafayette
Cunningham Rd
Rd to Auburn St
Resurface ST-19-108
ST-19-106 42nd StBlvd
Kessler fromNDr
Flamingo W DrSttotoShady
from 16th Ln Rd
Lafayette
Resurface ST-19-108 42nd St from Pasadena St Dr
Flamingo W to Shadeland
to Shady LnAve
Resurface ST-19-108 Carrol
42nd StRdfrom
fromPasadena
ProspectStStto
toShadeland
Warehouse Rd
Ave
Resurface ST-19-108 Kitley
CarrolAve fromProspect
Rd from BrookvilleStRd
to to EpleasantRd
Warehouse Run Pkwy S Dr
Resurface ST-19-108 Mitthoeffer Rd from
Kitley Ave from Prospect
Brookville StEpleasant
Rd to to Washington St S Dr
Run Pkwy
Resurface ST-19-108 Pleasant RunRd
Mitthoeffer Pkwy
fromS Prospect
Dr from Kitley Ave to 10th St
St to Washington St
Resurface ST-19-108 Ritter AveRun
Pleasant from Brookville
Pkwy Rd Kitley
S Dr from to Hibben Ave10th St
Ave to
Resurface ST-19-108 Michigan St
Ritter Ave from Brookville Rdtoto10th St Ave
Hibben
Resurface ST-19-109
ST-19-108 Bluff Rd
Ritter from
Ave Troy
from Ave to St
Michigan West St St
to 10th
Project Type Project Number Project Name / Segment Limits
Resurface ST-19-108 Pleasant Run Pkwy S Dr from Kitley Ave to 10th St
Resurface ST-19-108 Ritter Ave from Brookville Rd to Hibben Ave
Resurface ST-19-108 Ritter Ave from Michigan St to 10th St
Resurface ST-19-109 Bluff Rd from Troy Ave to West St
Resurface ST-19-109 Hickory Rd from Indian Creek Rd to Edgewood Ave
Resurface ST-19-109 Indian Creek Rd from Hickory Rd to Fairlane Dr
Resurface ST-19-109 Meridian School Rd from Rahke Rd to Meridian St
Resurface ST-19-109 Shelby St from County Line Rd to E Stop 10 Rd
Resurface ST-19-109 West St from Bluff Rd to Wisconsin St
Resurface TS-18-012 Binford Blvd from 38TH ST to 75th St
Resurface TS-18-012 Fall Creek Pkwy from Keystone Ave to 38th St
Streets ST-19-091 11th St from Pennsylvania St to Delaware St
Streets ST-19-091 Holt Rd from Washington St to Rockville Rd
Streets ST-19-091 Michigan St from Tomlinson Dr to Holt Rd
Streets ST-19-091 Southeastern Av from Acton Rd to Village Dr
Streets ST-19-092 30th St from Ritter Ave to Campbell Ave
Streets ST-19-092 Arlington Av from 25th St (W) to Sexton Ave
Streets ST-19-092 Fall Creek Pkwy N Dr from Dequincy St to Emerson Way
Streets ST-19-092 Massachusetts Av from Brookside Ave (W) to Commerce Ave
Streets ST-19-092 Ohio St from College St to Pine St
Streets ST-19-092 Pine St from Vermont St to Michigan St
Streets ST-19-093 38th St Ramps from Kessler Blvd N Dr to
Streets ST-19-093 Georgetown Rd from 38th St to Lafayette Rd
Streets ST-19-094 Keystone Av from Redfern Rd to Lawrence Ave
Streets ST-19-094 Raymond St from Garfield Dr to Shelby St

Post Date: 5/30/2018 Page 1 of 1


Last Update: 8/8/2018 Project list and cost is subject to change as we move towards final design. Print Date: 1/23/2019