Escolar Documentos
Profissional Documentos
Cultura Documentos
STRAT
S/N System
1 Control System
2 Control System
Communcation
3
System
4 Electrical System
Cathodic Protection
5
System
6 Earthing System
7 Electrical Building
8 Chlorination Building
9 Piping
10 Piping
11 Piping
11 Piping
S/N System
1 Control System
2 Piping
S/N System
1 Control System
2 Piping
2 Piping
3 Piping
S/N System
1 Control System
S/N System
1 Control System
Communication
2
System
Communication
3
System
4 Furniture
Interface Tie-In List
STRATEGIC RESERVOIRS - T
Interface between ATWTS Tiaf Tie-In Station (MAPA) Control System and
Shoaiba control System thru Existing Taif Terminal.
Power supply for ATWTS Tiaf Tie-In Station (MAPA) control valves, MOVs,
flow meter, WQM, Control system as follows:
1- One feeder C.B for MOVs and Control valves.
2- One feeder C.B for lighting and Power Sockets.
3- Two UPS Feeders for ATWTS Tiaf Tie-In Station (MAPA) control system.
4- One Auxiliry AC (Non-UPS) Feeder for ATWTS Tiaf Tie-In Station
(MAPA) control system.
5- One UPS feeder C.B for Flow Meter.
6- One UPS Feeder for WQM.
Downstream set point details of control valve (MAPA scope) in Taif tie-in
station area.
Downstream set point details of control valve (MAPA scope) in Taif tie-in
station area.
Signals exchange between AICC (MTST) control system and SSEM PSA1
control system for required resevouirs LIT signals and other signals as
required during detail design.
1- Taif Reservoirs LIT signals to SSEM PSA1 control system.
2- Inlet Flow Signal of PSA1 to AICC (MTST) control system which
required for chlorination system.
3-any other signals required.
Interface between new 60" storm water piping to existing storm system
Between AICC (MTST) and Existing SWCC Taif Terminal Control Roo
AICC MAPA
Distribution Distribution Hardwired.
Boards Boards
MAPA PIPING AICC PIPING Butt weld
MAPA AICC
MAPA AICC
AICC
SSEM PSA1 DCS Soft Link
StationControl
Control system Modbus TCP/IP
System
e Tank
NWC AICC
AICC
StationControl Existing SWCC
Soft link thru
System at Taif Terminal
FOC
Electrical Control Room.
Building
N/A
AICC
StationControl Existing SWCC
System at Taif Terminal
Electrical Control Room.
Building
N/A
Date:
NWC
2. NWC shall provide approval for trail pit excavation.
NWC
2. NWC shall provide approval for trail pit excavation.
10.02.2019 open
10.02.2019 open
30.05.2019 open
open
open
open
open
open
open
open
Due date Status Remarks
open
open
open
open
06.08.2018
06.08.2018
06.08.2018
06.08.2018