Você está na página 1de 30

I

STRAT

A Interface Between AICC (MTST) and MAPA (ATWTS)

S/N System

1 Control System

2 Control System

Communcation
3
System

4 Electrical System

Cathodic Protection
5
System

6 Earthing System
7 Electrical Building

8 Chlorination Building

9 Piping

10 Piping

11 Piping
11 Piping

B Interface Between AICC (MTST) and SSEM (TTRK)

S/N System

1 Control System

2 Piping

C Interface Between AICC (MTST) and Existing NWC Conc

S/N System
1 Control System

2 Piping

2 Piping

3 Piping

D Interface Between AICC (MTST) and Existing SWCC Tai

S/N System
1 Control System

E Interface Between AICC (MTST) and Existing SWCC Tai

S/N System

1 Control System

Communication
2
System
Communication
3
System

4 Furniture
Interface Tie-In List
STRATEGIC RESERVOIRS - T

Between AICC (MTST) and MAPA (ATWTS)

Interface point Description

Signals Exchange between ATWTS Taif Tie-In station control system


(MAPA) and MTST control system (AICC) which required for chlorination
System injector calculations at ATWTS inlet line.
1- Flow Signal of ATWTS Taif Tie-In.
2- CL2 Signal of ATWTS Taif Tie-In WQM.

Signals Exchange between ATWTS Taif Tie-In station control system


(MAPA) and MTST control system as follows:
1- LIT Signal (Common) from Startigic Reservoir.
2- LSHH Signal (Common) from Startigic Reservoir.
3- Status Signals for MOVs between Two Feed Lines (4 MOVs).

Interface between ATWTS Tiaf Tie-In Station (MAPA) Control System and
Shoaiba control System thru Existing Taif Terminal.

Power supply for ATWTS Tiaf Tie-In Station (MAPA) control valves, MOVs,
flow meter, WQM, Control system as follows:
1- One feeder C.B for MOVs and Control valves.
2- One feeder C.B for lighting and Power Sockets.
3- Two UPS Feeders for ATWTS Tiaf Tie-In Station (MAPA) control system.
4- One Auxiliry AC (Non-UPS) Feeder for ATWTS Tiaf Tie-In Station
(MAPA) control system.
5- One UPS feeder C.B for Flow Meter.
6- One UPS Feeder for WQM.

Cathodic Protection system for ATWTS Taif Tie-In station


Installation of ATWTS Taif Tie-In station control system (MAPA) in
Electrical Building

Installatiion of WQM of ATWTS Taif Tie-In in Chlorination building

Interface between 60" pipline of Arafat – Taif WTS(MAPA)to Taif Tie-In


station (AICC)

As per SWCC tender drawing (Arafat - Taif) QP20-D-6353 Tie-


InStationTaifStrategicReservoir-P&ID-Rev0, Notes#9 : 60" Valve to be
provided by station contractor (MAPA). Existing spool piece to be
removed

Downstream set point details of control valve (MAPA scope) in Taif tie-in
station area.
Downstream set point details of control valve (MAPA scope) in Taif tie-in
station area.

Between AICC (MTST) and SSEM (TTRK)

Interface point Description

Signals exchange between AICC (MTST) control system and SSEM PSA1
control system for required resevouirs LIT signals and other signals as
required during detail design.
1- Taif Reservoirs LIT signals to SSEM PSA1 control system.
2- Inlet Flow Signal of PSA1 to AICC (MTST) control system which
required for chlorination system.
3-any other signals required.

Interface between 40 " outlet pipling netween new taif reservoir


pipline to pumping station PS A1 Taif-Turubah WTS)

Between AICC (MTST) and Existing NWC Concrete Tank

Interface point Description


Location and Installation of three level transmitter on the top of the
existing NWC concrete Tank which required to control outlet control
valves of taif new Reservoirs

Interconnection of the new reservoir inlet piping with the existing 2 x


1400 mm inlet headers of existing Taif Strategic Reservoir

Interconnection of the new reservoir outlet piping with the existing 2 x


800 mm inlet headers of existing Taif Strategic Reservoir

Interface between new 60" storm water piping to existing storm system

Between AICC (MTST) and Existing SWCC Taif Terminal Reservoirs

Interface point Description


level signal of SWCC Existing Taif Terminal Reservoirs (4 Nos.) required
for controlling of the control valves at inlet of new Taif Reservoirs Tie-in
Station

Between AICC (MTST) and Existing SWCC Taif Terminal Control Roo

Interface point Description

Installtion of Remote Workstation at Existing SWCC Taif Terminal Control


Room to monitor and control new Taif Reservoirs.

installation of Network Rack and Fiber Optic Distribution Frame (FODF)


at Existing control room
Fiber Optic Cable (FOC) between new Electrical Building and Existing
SWCC Taif terminal Control Room.

Furniture required for Existing SWCC Taif Terminal Control Room.


rface Tie-In List
C RESERVOIRS - TAIF

From To Iterface Type

MAPA Control AICC Station


Hardwired.
System Control System

AICC Station MAPA Control


Hardwired.
Control System System

AICC Fiber MAPA Fiber


Optic Optic Fiber Optic
Distribution Distribution Patch Cords
Frame (FODF) Frame (FODF)

AICC MAPA
Distribution Distribution Hardwired.
Boards Boards
MAPA PIPING AICC PIPING Butt weld

MAPA AICC Flanged

MAPA AICC
MAPA AICC

From To Iterface Type

AICC
SSEM PSA1 DCS Soft Link
StationControl
Control system Modbus TCP/IP
System

SSEM PIPING AICC PIPING Butt weld

e Tank

From To Iterface Type


NWC AICC

NWC PIPING AICC PIPING Flanged End

NWC PIPING AICC PIPING Flanged End

NWC AICC

rminal Reservoirs (4 Nos.)

From To Iterface Type


Existing SWCC
AICC Station
Taif Terminal Harwired
Control System
Reservoirs

rminal Control Room.

From To Iterface Type

AICC
StationControl Existing SWCC
Soft link thru
System at Taif Terminal
FOC
Electrical Control Room.
Building

N/A
AICC
StationControl Existing SWCC
System at Taif Terminal
Electrical Control Room.
Building

N/A
Date:

Required Action Action By

1- AICC to provide provision of the signals in station


control system and provide termination details to
MAPA.

2- All cables, cable routes, terminations at both AICC


Ends,....etc. shall be done by MAPA.

1- AICC to provide provision of the signals in station


control system and provide termination details to
MAPA.

2- All cables, cable routes, terminations at both AICC


Ends,....etc. shall be done by MAPA..
1- AICC to provide Design and termination details for
FODFs at Electrical building and Existing Taif Terminal
AICC
Control Room to MAPA.

2- All cables, cable routes, terminations at both


Ends,....etc. shall be done by MAPA.

1- MAPA shall provide Electrical load list for UPS and


MAPA
Non-UPS Loads to enable AICC to size Transformer and
UPS systems accordingly.

2- AICC to provide Design and termination details for


above feeders to MAPA.

3-All cables, cable routes, terminations at both


Ends,....etc. shall be done by MAPA.

1- MAPA shall provide Piping design and layout for


ATWTS Taif Tie-In station to AICC. MAPA

2- AICC to check, size & design station piping CPS


accordingly.
1- MAPA to Provide dimensions and GA drawing of
control system Panels, communication Rack/panel,
MAPA
electrical distrubtion boards and control desk layout to
AICC
2- AICC to check, size & design Electrical building
accordingly.

3- All installation, supports, cables, cable routes,


terminations at both Ends,....etc. shall be done by
MAPA.
1- MAPA to Provide dimensions and GA drawing of WQM
Panels to AICC. MAPA

2- AICC to check, size & design Chlorination building


accordingly.
3- all Piping, supports, cables, cable route,…etc. for
WQM shall be done by MAPA.

1- AICC will provide 60" pipe invert level, Pipe material


details, wall thickness, internal lining detials and tie-in AICC
point co-ordinates for interface point.

2- MAPA shall provide Taif tie-in station area drawing,


station shafts detaisl and piping layout drawing (up to MAPA
MAPA scope)

3- MAPA shall provide Steady-state, maximum and


minimum flow and pressure conditions at station MAPA
interfaces

3- Final tie-in weld shall be done by the Station


MAPA
Contractor (MAPA)

1- MAPA shall provide face to face, Valve Ga drawing


MAPA
and actuator datasheet of 60" motorised butterfly
valve
2. AICC will provide valve shaft detials for 60" motorised
AICC
butterfly valve

3.MAPA to confirm the delivery schedule and erection


MAPA
schedule of 60" motorised butterfly valve

1- AICC will provide minimium required pressure at


Downstream set point details of control valve (MAPA AICC
scope)
2. MAPA shall provide detials of control valve (Cv value,
Cv curves, Control Conditions, Calculation of the risk of MAPA
cavitation)

Required Action Action By

1- SSEM shall provide soft signals list which required to


be exchange betweenAICC StationControl System and
SSEM
SSEM PSA1 DCS Control system.

2- AICC to check and take the same in consideration in


SCS design.

3- All installation, supports, network raks, network


switches, media converters, cables, cable routes,
terminations at both ends, ...etc. shall be done by
SSEM.

1- AICC will provide 40" pipe invert level, Pipe material


details, wall thickness, internal lining detials and tie-in
AICC
point co-ordinates for interface point.

3- SSEM shall provide Taif tie-in station area drawing,


station shafts detaisl and piping layout drawing SSEM

4- Final tie-in weld shall be done by the Station


SSEM
Contractor (SSEM)

Required Action Action By


AICC to Arrange Site visit with , K&A and SWCC to
investigated and finalized the following at the site.
1- location of transmitter at the top of the existing NWC AICC
concrete Tank.
2- Cable route for power and instruments cables.

1- AICC need to perform trail pit excavation to verifiy


the detials of existing 2 x 1400mm pipe as per As-built
AICC
drawings.

NWC
2. NWC shall provide approval for trail pit excavation.

3. Based on Point#2, AICC will provide Interface detials


new reservoir inlet piping with the existing 2 x 1400mm AICC
inlet headers of existing Taif Strategic Reservoirm

1- AICC need to perform trail pit excavation to verifiy


the detials of existing 2 x 800mm pipe as per As-built AICC
drawings.

NWC
2. NWC shall provide approval for trail pit excavation.

3. Based on Point#2, AICC will provide Interface detials


new reservoir outlet piping with the existing 2 x 800mm AICC
inlet headers of existing Taif Strategic Reservoirm

1- AICC need to perform trail pit excavation to verifiy


the detials of existing serivce pipes crossting the new AICC
60" storm piping

2. NWC shall provide approval for trail pit excavation. NWC

3. Based on Point#2, AICC will provide Interface detials


AICC
between new 60" storm water piping to existing storm
system

Required Action Action By


AICC to Arrange Site visit with K&A and SWCC to
investigated and finalized the following at the site.
1- Existing level transmitters conditions.
2- Possibility to install new LITs in case of no possipility
AICC
to take the level signals from existing level transmitters.
3- Location to install new RIO panel to transfer level
signals to SCS.
4- Cable route for power, FO and instruments cables.

Required Action Action By

AICC to Arrange Site visit with K&A and SWCC to


investigate and finalize the following at the site.
1- the Existing control Room condition.
2- location of new remote Workstation. AICC
3- Location of power supply to feed new remote
Workstation.

AICC to Arrange Site visit with K&A and SWCC to


investigate and finalize the following at the site.
1- Determine Location to install new Network rack
including FODF.
2- Determine Location of power supply Panel for new
AICC
Network switches.
3- Determine location of interface cabinet with El
Shoaiba for Telephone and data system integration.
4- determine interface ports/termination details for the
new link inside interface cabinet.
AICC to Arrange Site visit with K&A and SWCC to
investigate and finalize the following at the site.
1- open and inspection of the existing Duct banck
Manholes to check free duct for Fiber optic Cable up to
AICC
existing SWCC Taif terminal Control Room.
2- check and specifying fiber optic cable route inside
existing SWCC Taif terminal Control Room up to new
Network Rack location.

AICC to Arrange Site visit with K&A and SWCC to check


and finalize the required Furniture and upgarde of the AICC
existing Control Room as per G02.
04.07.2018 Rev.0

Due date Status Remarks

10.02.2019 open

10.02.2019 open

30.05.2019 open

open

open
open

open

open

open

open
Due date Status Remarks

open

Due date Status Remarks


06.08.2018

open

open

open

Due date Status Remarks


06.08.2018

Due date Remarks

06.08.2018

06.08.2018
06.08.2018

06.08.2018