Escolar Documentos
Profissional Documentos
Cultura Documentos
1/MI01(01)
MAINTENANCE INSTRUCTION SHEET
(DISTRIBUTION BOARD)
Result
No. Work Description Frequency
Yes No N/A Remark
1 Distribution Board
d Retighten termination
f Checked MCCB
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI02(01)
MAINTENANCE INSTRUCTION SHEET
(RISING AND LITERAL MAINS)
Result
No. Work Description Frequency
Yes No N/A Remark
1 RISING AND LITERAL MAINS
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI03(01)
MAINTENANCE INSTRUCTION SHEET
(SUB-MAIN WIRING/CABLING)
Result
No. Work Description Frequency
Yes No N/A Remark
1 SUB-MAIN WIRING/CABLING
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI04(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 WIRING ACCESSORIES
Check the coloring for conduit and trunking not
a
damage
Check termination clamp for conduit and
b
trunking
Check cover for trunking and conduit accessories
c
not missing
d Check all joint in good condition ( loose/contact )
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI05(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 STRUCTURED CABLING SYSTEM
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI06(01)
MAINTENANCE INSTRUCTION SHEET
(FINAL SUB-CIRCUIT)
Result
No. Work Description Frequency
Yes No N/A Remark
1 FINAL SUB-CIRCUIT
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI07(01)
MAINTENANCE INSTRUCTION SHEET
(LIGHTING MANAGEMENT CONTROL SYSTEM)
Result
No. Work Description Frequency
Yes No N/A Remark
1 LIGHTING MANAGEMENT,CONTROL SYSTEM
a Blow dust
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI08(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 FIRE BARRIEL
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI09(01)
MAINTENANCE INSTRUCTION SHEET
(FEEDER PILLAR)
Result
No. Work Description Frequency
Yes No N/A Remark
1 FEEDER PILLAR
a Vacuum dust
b Retighten termination
c Check contactor
f Check MCCB
h Lighting
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI10(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 PABX
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI11(01)
MAINTENANCE INSTRUCTION SHEET
(LIGHTNING PROTECTION SYSTEM)
Result
No. Work Description Frequency
Yes No N/A Remark
1 LIGHTNING PROTECTION SYSTEM
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI12(01)
MAINTENANCE INSTRUCTION SHEET
(EARTHING SYSTEM)
Result
No. Work Description Frequency
Yes No N/A Remark
1 EARTHING SYSTEM
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI13(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 MATV SYSTEM
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI14(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 WATER HEATER
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI15(01)
MAINTENANCE INSTRUCTION SHEET
(AUDIO AND VIDEO SYSTEM)
Result
No. Work Description Frequency
Yes No N/A Remark
1 AUDIO AND VIDEO SYSTEM
(1.1) Video Screen & Projection System
Inspect metal base frame of monitor, screen, and
a
rollers for corrosion, repair or paint if corroded.
Service video cassette player, laser vision player,
b caption camera, computers and related
equipment as per duration.
c Test master power supply.
d Retighten all connections and termination.
e Ensure screen unit is functional.
f Clean large screen PMMA for stain dirt’s.
(1.2) Sound Reinforcement System
Inspect for functionality of complete sound
a
reinforcement system.
Clean power amplifier, speakers, paging and
b
other audio related equipment.
c Retighten all connections & termination
(1.3) Conference System
Inspect for functionality of complete conference
a
system.
Clean power amplifier, delegate conferences sets
b
and other related equipment
c Retighten all connections & termination.
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI16(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 PA SYSTEM
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI17(01)
MAINTENANCE INSTRUCTION SHEET
(BCS)
Result
No. Work Description Frequency
Yes No N/A Remark
1 BCS
G Defrag disk
I Vacuum dust
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI18(01)
MAINTENANCE INSTRUCTION SHEET
(GENSET)
Result
No. Work Description Frequency
Yes No N/A Remark
1 GENSET
A Room is clean.
T Check turbocharger. (2 ≤ X ≤ 6) A
U Drain off diesel tank.
Check diesel level in main tank & service tank.
V
(Minimum 0.75 %)
W Check fuel transfer pump (diesel tank).
Load Test Data(5 min):
Time:
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI19(01)
MAINTENANCE INSTRUCTION SHEET
(LV SWITCHGEAR SSB-1/BKN)
Result
No. Work Description Frequency
Yes No N/A Remark
1 LV SWITCHGEAR SSB-1/BKN
D kA (max = 50 kA)
D kA (max = 50 kA)
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI20(01)
Result
No. Work Description Frequency
Yes No N/A Remark
1 LV SWITCHGEAR A/C MSB-1/MSB-2
D kA (max = 50 kA)
D kA (max = 50 kA)
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI21(01)
MAINTENANCE INSTRUCTION SHEET
(LV SWITCHGEAR MSB-1/MSB-2)
Result
No. Work Description Frequency
Yes No N/A Remark
1 LV SWITCHGEAR MSB-1/MSB-2
D kA (max = 50 kA)
D kA (max = 50 kA)
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI22(01)
MAINTENANCE INSTRUCTION SHEET
(PV MSB)
Result
No. Work Description Frequency
Yes No N/A Remark
(1.1) PV MAIN DB
C AMP(A)
D kA
C AMP(A)
D kA
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI23(01)
MAINTENANCE INSTRUCTION SHEET
(HARMONIC FILTER)
Result
No. Work Description Frequency
Yes No N/A Remark
(1.1) AHF MSB 1A
C RUNNING AMP(A) :
C RUNNING AMP(A) :
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI24(01)
MAINTENANCE INSTRUCTION SHEET
(HARMONIC FILTER)
Result
No. Work Description Frequency
Yes No N/A Remark
(1.1) AHF MSB 2A
C RUNNING AMP(A) :
C RUNNING AMP(A) :
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI25(01)
MAINTENANCE INSTRUCTION SHEET
(ROTARY UPS)
1 Client / Institution PMO/ ELECTRICAL 4 Scheduled Date For PPM
Result
No. Work Description Frequency
Yes No N/A Remark
1 ROTARY UPS
A Inspect for leakage of acid - replace cell if any.
B Record individual battery voltage. (24 ≤ X ≤ 35)V
C Clean terminal from acid corrosion, if any
Record individual battery impedance-
D
(5≤ X ≤ 20 mΩ).
Inspect connections between cells are secure
E
clean and lubricate with petroleum jelly.
Re-measure and records cell output voltage after
F
maintenance in battery log sheet.
G Record battery discharge curve.
H Ensure cleanliness at cubicles.
Tighten all connections (Mechanical and
I
Electrical).
Clean all heat sink, capacitor and P.C.B's (use dry
J
brush or vacuum cleaner)
K Ensure the cleanliness of cubicles
L Ensure all electrical connections perfectly
M Ensure control circuit working perfectly
N Inspect completeness of switch functions
Ensure the cleanliness of 'cubicles'(Maintenance
O
by-pass switch)
Inspect completeness of harmonic spectrum and
P
distortions
R Record downstream neutral earth voltage
Conduct mandatory power failure simulation test
S for UPS (to be done concurrently with gen-set
test)
Inspect for leaks deformation on A.C and D.C
T
capacitors
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI26(01)
MAINTENANCE INSTRUCTION SHEET
(TRANSFORMER)
Result
No. Work Description Frequency
Yes No N/A Remark
1 TRANSFORMER
(1.1) Transformer No.T1A
Temperature :
A
(Alarm = 120 0C, Trip= 150 0C)
B Any sparking sounds (Yes/No) :
E Transformer No.T2B
Temperature :
F
(Alarm = 120 0C, Trip= 150 0C)
G Any sparking sounds (Yes/No) :
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI27(01)
MAINTENANCE INSTRUCTION SHEET
(HT SWITCHGEAR)
Result
No. Work Description Frequency
Yes No N/A Remark
1 HT SWITCHGEAR
F Panel condition
H Room temperature
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI28(01)
MAINTENANCE INSTRUCTION SHEET
(BIPV)
Result
No. Work Description Frequency
Yes No N/A Remark
1 Distribution Board
D Retighten termination
F Checked MCCB
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI29(01)
MAINTENANCE INSTRUCTION SHEET
(PARANS SOLAR LIGHTING)
Result
No. Work Description Frequency
Yes No N/A Remark
A Check incoming supply
E Any abnormality
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date:
KFM/P7.5.1/MI30(01)
MAINTENANCE INSTRUCTION SHEET
(DPM SYSTEM)
Result
No. Work Description Frequency
Yes No N/A Remark
a Check Status
b Data Logged
c Checked cleanness
d Any abnormality
Verification
Prepared by: Verified by:
………………………………………………………………. ……………………………………………………………….
(Technician) (Supervisor / Engineer)
Name: Name:
Date: Date: