Você está na página 1de 17

MABEY SOLUTIONS FOR THE

MINING / OIL & GAS / ENERGY


SECTOR

DECEMBER 2018
ACCESS BRIDGE FOR OILFIELD IN COLOMBIA
CLIENT: FRONTERA ENERGY (PACIFIC RUBIALES / PETROMINERALES )

Compact 200 bridge used


to provide new access for
heavy transport vehicles
to an oilfield
ACCESS BRIDGE FOR OILFIELD IN COLOMBIA
CLIENT: FRONTERA ENERGY (PACIFIC RUBIALES / PETROMINERALES )

Several C200™ bridges


used for exploration and
relocated to different
sites during the project
THE PAPUA NEW GUINEA LNG UPSTREAM PROJECT
CLIENT: EXXON MOBIL

120m gas
pipeline bridge
was installed in
just 9 months
NEW ACCESS OVER PIPE WORK IN THE REFINERY, UK
CLIENT: CHEVRON

21m length and 4.2m


wide Compact 200™.
Built in only 3 days
NEW ACCESS OVER PIPE WORK IN THE REFINERY, UK
CLIENT: CHEVRON

Assembled using
only a 4 man team
and telehandler
CHANGUINOLA HYDROELECTRIC ACCESS BRIDGE IN PANAMA
CLIENT: AES CHANGUINOLA CIVIL WORKS

140m bridge designed


to carry 120t vehicles
UNLOADING PLATFORM FOR OIL DISCHARGE VESSELS, THE PHILIPPINES
CLIENT: UNIOIL CORPORATION

The jetty can


accommodate up to
six oil tankers and
42t vehicles
UNLOADING PLATFORM FOR OIL DISCHARGE VESSELS, THE PHILIPPINES
CLIENT: UNIOIL CORPORATION

524m long bridge in


multiple spans with
a 4.2m wide deck

Client: Unioil Corporation


Country: The Philippines
Solution: Mabey bridge used as jetty to accommodate up to six oil tankers. 524m long in multiple spans with a 4.2m wide deck
UNLOADING PLATFORM FOR OIL DISCHARGE VESSELS, THE PHILIPPINES
CLIENT: UNIOIL CORPORATION

Assembled in
only 28 days
ACCESS BRIDGE TO THE GLENKERIE WIND FARM IN THE UK
CLIENT: INFINIS / I&H BROWN

15m bridge
assembled in 1 day
PONTOON ACCESS BRIDGE WITH BARGES USED AS CARRIERS
CLIENT: TOTAL – EXPLORATION SITE

Compact 200™
bridge, clear span
39m and 7.35m wide
ACCESS TO THE CONSTRUCTION OF THE CHAGLLA DAM IN PERU
CLIENT: EMPRESA DE GENERACIÓN HUALLAGA SA

50m bridge carrying


300t during a load test
required by the client
ACCESS TO THE CONSTRUCTION OF THE CHAGLLA DAM IN PERU
CLIENT: EMPRESA DE GENERACIÓN HUALLAGA SA

Mabey supplied 7x C200™


bridges, that were
relocated during the project
LONGANNET POWER PLANT A DIFFERENT USE OF C200™ BRIDGES
CLIENT: SCOTTISH POWER

A combination of bridging
units used to support a
115m coal conveyor
BRIDGE ACCESS FOR UNDERGROUND TURBINE IN GERMANY
CLIENT: WALTER BAU AG

Mabey bridge used to access a


shaft 1km underground during
the construction of the
Goldisthal Pumped Storage
Station

Client: Walter Bau AG


Country: Germany
Solution:
THANK YOU!

WWW.MABEY.COM

Você também pode gostar