DECEMBER 2018
ACCESS BRIDGE FOR OILFIELD IN COLOMBIA
CLIENT: FRONTERA ENERGY (PACIFIC RUBIALES / PETROMINERALES )
120m gas
pipeline bridge
was installed in
just 9 months
NEW ACCESS OVER PIPE WORK IN THE REFINERY, UK
CLIENT: CHEVRON
Assembled using
only a 4 man team
and telehandler
CHANGUINOLA HYDROELECTRIC ACCESS BRIDGE IN PANAMA
CLIENT: AES CHANGUINOLA CIVIL WORKS
Assembled in
only 28 days
ACCESS BRIDGE TO THE GLENKERIE WIND FARM IN THE UK
CLIENT: INFINIS / I&H BROWN
15m bridge
assembled in 1 day
PONTOON ACCESS BRIDGE WITH BARGES USED AS CARRIERS
CLIENT: TOTAL – EXPLORATION SITE
Compact 200™
bridge, clear span
39m and 7.35m wide
ACCESS TO THE CONSTRUCTION OF THE CHAGLLA DAM IN PERU
CLIENT: EMPRESA DE GENERACIÓN HUALLAGA SA
A combination of bridging
units used to support a
115m coal conveyor
BRIDGE ACCESS FOR UNDERGROUND TURBINE IN GERMANY
CLIENT: WALTER BAU AG