WORK PERMIT INDEX

S.NO WP.NO DATE DESCRIPTION

1 17-18/01 1/7/2017 CAPACITOR BANK PM LTSS-2

2 17-18/02 1/7/2017 MONTHLY PM OF BATTERY BANK AND CHARGER

3 17-18/03 2/7/2017 CAPACITOR BANK PM LTSS-1

4 17-18/04 4/8/2017 H/Y PM OF ACB AT OLD SIC BUILDING

5 17-18/05 5/8/2017 H/Y PM OF ACB AT SOLAR CELL

6 17-18/06 6/8/2017 CONTACTOR HUMMING SOUND IN RTCC PANEL

7 17-18/07 7/8/2017 BATTERY BANK PM WORK DG ROOM

8 17-18/08 7/8/2017 BATTER BANK PM WORK IN MSDS

9 17-18/09 12/8/2017 33KV ISOLATOR SWITCH MAINTENANCE AND DOUBLE POLE

10 17-18/10 19/8/2017 H/Y PM OF CAPACITOR AND ACB

11 17-18/11 19/8/2017 DG ACB DG-1,2,3 H/Y PM

12 17-18/12 17/8/2017 AUX DISTRIBUTION PANEL

13 17-18/13 22/8/2017 PMTC LED FITTING 3 NOS FIXING ( HIEGHT WORK)

14 17-18/14 26/8/2017 SIC BUILDING

15 17-18/15 2/9/2017 MSDS BATTERY BANK AND CHARGER 1 & 2

16 17-18/16 2/9/2017 LTSS-1 (01A,1D,2A,2D) ,LTSS-2( 1A,1D,2A,2D) CAPACITOR BANK PM

17 17-18/17 2/9/2017 110 V DC BATTERY BANK PM

18 17-18/18 3/9/2017 LTSS-1 17B ACB AND LTSS-219C ACB

19 17-18/19 9/9/2017 LDB,PDB,ACDB PM IN SECURITY GATE-1

20 17-18/20 9/9/2017 415V LT LDB PANEL 415V LT SLDB #1 PANEL MSDS

21 17-18/21 10/9/2017 415V PDB PANEL IN MSDS

22 17-18/22 10/9/2017 DG ROOM ACB FEEDER 17F1 FUEL INCOMER

23 17-18/23 16/09/2017 PMTC 415 LT PDB-2D -2E-2E1,2F AND ACB F.NO 8B,8C,
24 17-18/24 23/09/2017 SOLAR CELL I/C OF PDB -1 ,415V LT SLDB-1,2,3,4,5, 415V LT LDB

25 17-18/25 23/09/2017 DG ROOM 18F1 SOLAR CELL SHUNT DOWN FOR CABLE TERMINATION WORK

26 17-18/26 24/09/2017 LTSS-1 SLDB # 1 PDB # 2M AND FPB #2

27 17-18/27 1/10/2017 MSDS BATTERY BANK AND CHARGER 1 & 2

28 17-18/28 1/10/2017 DG ROOM BATTERY BANK PM

29 17-18/29 2/10/2017 LTSS-2 PM CAPACITOR BANK

30 17-18/30 14/10/2017 PM OF ADMIN BUILDING

31 17-18/31 14/10/2017 PM OF TTI BUILDING

32 17-18/32 18/10/2017 STREET LIGHT CHECKING WORK

33 17-18/33 21/10/2017 H/Y PM OF ACB 4B,4C,6B,8B & 8C ,6C AND 11B

34 17-18/34 28/10/2017 H/Y PM OF ACB F.N0 15B ,15C 17B ,17C

35 17-18/35 4/11/2017 BATTERY BANK AT MSDS

36 17-18/36 4/11/2017 BATTERY BANK AT DG ROOM

37 17-18/37 5/11/2017 CAPACITOR BANK 21A,21D,20A,01A,01D,2A,2D LTSS-1 PM

38 17-18/38 1/12/2017 MONTHLY PM OF BATTERY BANK 11VDC MSDS AND DG ROOM

39 17-18/39 16/12/2017 H/Y PM OF ACB AT LTSS-2

40 17-18/40 30/12/2017 PM OF PDB AT PMTC

41 17-18/41 6/1/2018 PM OF BATTERY BANK ( 110V DC DG ROOM)

42 17-18/42 6/1/2018 PM OF BATTERY BANK(110V DC) MSDS

43 17-18/43 7/1/2018 PM OF CAPACITOR BANK LTSS-1 AND LTSS-2

44 17-18/44 19/01/2018 PM OF PDB# 1,2& 3 , MAIN I/C ACB LDB-1 ,2 AND ACB

45 17-18/45 3/2/2018 PM OF BATTERY BANK(110V DC) MSDS

46 17-18/46 3/2/2018 PM OF BATTERY BANK ( DG ROOM)

47 17-18/47 4/2/2018 PM OF CAPACITOR BANK ( LTSS-1 & LTSS-2) LTSS-2 APFC PANEL

48 17-18/48 10/2/2018 EARTH PIT MEGGER WORK

49 17-18/49 11/2/2018 EARTH PIT MEGGER WORK

50 17-18/50 17/2/2018 CNOC PM ( OLD) ASPE SCHEDULE


51 17-18/51 19/02/2018 CNOC PM ( NEW) ASPE SCHEDULE

52 17-18/52 24/02/2018 CMD PM AS PER SCHEDULE

53 17-18/53 2/3/2018 PM OF BATTERY BANK (110V) MSDS AND DG ROOM


X
N REMARKS

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

LE POLE COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

ITOR BANK PM COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

8C, COMPLETED
415V LT LDB COMPLETED

BLE TERMINATION WORK COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

-1 PM COMPLETED

DG ROOM COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

COMPLETED

CB COMPLETED

COMPLETED

COMPLETED

PFC PANEL COMPLETED

COMPLETED

COMPLETED

COMPLETED
COMPLETED

COMPLETED

COMPLETED