PILE BORE LOG

Project UST MLCP (Phase 01) Trivandrum Rig No.


Package Piling Foundation Works Doc. No. VF/SYN/MLCP/IR No.
Contractor Vijaya Foundations Pvt Ltd Date:
PILE BORE LOG DETAILS BORING DETAILS
Location Type Time Depth (m)
Drawing No. Boring Tool Date From To From To Remarks
Pile No. Cut-off Level (m)
Dia of Pile Top of casing/liner (m)
Depth of Pile from COL (m) Existing GL (m)
Founding Level (m) Bore Depth from GL (m)
FLUSHING DETAILS
Started Date Completed Date
Time Started Time Completed
REINFORCEMENT DETAILS Cage Length (m)
Description Length Total Length in 'm' (Diameter wise)
Diameter in 'mm'
of Bars Nos. (m)
Main Bars
Main Bar Laps
Inner Rings
Spirals
Spirals
Spiral Laps
Spiral Laps
Hook Rod
Total Length Total
Total Weight
CONCRETING DETAILS
Type of Cement /Grade Commence Date Time
Concrete Grade Finish Date Time
Mix Ratio No. of Cubes Taken Contractor: PMC/Client
Slump (mm) Volume of Concrete
3
Theoretical Consumption (Bags) Theoretical (m ) Sign:
3
Actual Consumption (Bags) Actual (m ) Date