Você está na página 1de 29

Drawing1

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:13

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

E L E M E N T F O R M A T I O N 17:00:14

L I N E A R E Q U A T I O N S O L U T I O N 17:00:14

FORMING STIFFNESS AT ZERO (UNSTRESSED) INITIAL CONDITIONS

TOTAL NUMBER OF EQUILIBRIUM EQUATIONS = 3138


NUMBER OF NON-ZERO STIFFNESS TERMS = 79635

NUMBER OF EIGENVALUES BELOW SHIFT = 0

L I N E A R S T A T I C C A S E S 17:00:15

USING STIFFNESS AT ZERO (UNSTRESSED) INITIAL CONDITIONS

TOTAL NUMBER OF CASES TO SOLVE = 5


NUMBER OF CASES TO SOLVE PER BLOCK = 5

LINEAR STATIC CASES TO BE SOLVED:

CASE: SW
CASE: LIVE
CASE: FINISHES
CASE: WALL
CASE: ALL DEAD

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:15

CASE: C1
Page 1
Drawing1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.001350 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.02


TIME FOR CONTROLLING ANALYSIS = 0.52
TIME FOR FORMING STIFFNESS MATRIX = 0.12
TIME FOR SOLVING STIFFNESS MATRIX = 1.44
TIME FOR CALCULATING DISPLACEMENTS = 0.12
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.14
----------
TOTAL TIME FOR THIS ANALYSIS = 2.36

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:18

CASE: C2
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000
Page 2
Drawing1

CASE: C2
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.002221 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.02


TIME FOR CONTROLLING ANALYSIS = 0.42
TIME FOR FORMING STIFFNESS MATRIX = 0.08
TIME FOR SOLVING STIFFNESS MATRIX = 1.54
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.20
----------
TOTAL TIME FOR THIS ANALYSIS = 2.36

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:20

CASE: C3
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

CASE: C3
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
Page 3
Drawing1
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.002608 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.02


TIME FOR CONTROLLING ANALYSIS = 0.46
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.78
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.18
----------
TOTAL TIME FOR THIS ANALYSIS = 1.60

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:22

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:23

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:24

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:24

Page 4
Drawing1

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.001136 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.30


TIME FOR CONTROLLING ANALYSIS = 1.06
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.52
TIME FOR CALCULATING DISPLACEMENTS = 0.14
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.10
----------
TOTAL TIME FOR THIS ANALYSIS = 2.18

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:26

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:27

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:27

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
Page 5
Drawing1
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:27

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.000817 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.26


TIME FOR CONTROLLING ANALYSIS = 0.60
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.60
TIME FOR CALCULATING DISPLACEMENTS = 0.38
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.30
----------
TOTAL TIME FOR THIS ANALYSIS = 2.20

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:30

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:31

RUNNING ANALYSIS WITHIN THE GUI PROCESS


Page 6
Drawing1
USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:31

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:31

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.006215 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.24


TIME FOR CONTROLLING ANALYSIS = 0.56
TIME FOR FORMING STIFFNESS MATRIX = 0.08
TIME FOR SOLVING STIFFNESS MATRIX = 0.62
TIME FOR CALCULATING DISPLACEMENTS = 0.20
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.24
----------
TOTAL TIME FOR THIS ANALYSIS = 1.94

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:33

Page 7
Drawing1
SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)
File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:34

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:34

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:34

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.003788 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.22


TIME FOR CONTROLLING ANALYSIS = 0.46
TIME FOR FORMING STIFFNESS MATRIX = 0.04
TIME FOR SOLVING STIFFNESS MATRIX = 0.60
Page 8
Drawing1
TIME FOR CALCULATING DISPLACEMENTS = 0.28
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.16
----------
TOTAL TIME FOR THIS ANALYSIS = 1.76

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:36

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:37

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:37

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:37

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Page 9
Drawing1
Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.012124 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.20


TIME FOR CONTROLLING ANALYSIS = 0.70
TIME FOR FORMING STIFFNESS MATRIX = 0.02
TIME FOR SOLVING STIFFNESS MATRIX = 0.54
TIME FOR CALCULATING DISPLACEMENTS = 0.12
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.12
----------
TOTAL TIME FOR THIS ANALYSIS = 1.70

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:39

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:40

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:40

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

Page 10
Drawing1
E L E M E N T F O R M A T I O N 17:00:40

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.006526 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.40


TIME FOR CONTROLLING ANALYSIS = 0.50
TIME FOR FORMING STIFFNESS MATRIX = 0.04
TIME FOR SOLVING STIFFNESS MATRIX = 0.52
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.08
----------
TOTAL TIME FOR THIS ANALYSIS = 1.64

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:42

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:43

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:43

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
Page 11
Drawing1
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:43

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.021051 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.44


TIME FOR CONTROLLING ANALYSIS = 0.40
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.50
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.10
----------
TOTAL TIME FOR THIS ANALYSIS = 1.60

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:45

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:46

Page 12
Drawing1

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:47

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:47

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.017423 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.46


TIME FOR CONTROLLING ANALYSIS = 0.36
TIME FOR FORMING STIFFNESS MATRIX = 0.04
TIME FOR SOLVING STIFFNESS MATRIX = 0.58
TIME FOR CALCULATING DISPLACEMENTS = 0.08
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.08
----------
TOTAL TIME FOR THIS ANALYSIS = 1.60

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:48
Page 13
Drawing1

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:50

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:50

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:50

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.025960 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.32


TIME FOR CONTROLLING ANALYSIS = 0.38
Page 14
Drawing1
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.52
TIME FOR CALCULATING DISPLACEMENTS = 0.14
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.06
----------
TOTAL TIME FOR THIS ANALYSIS = 1.48

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:51

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:52

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:53

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:53

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
Page 15
Drawing1
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.020689 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.52


TIME FOR CONTROLLING ANALYSIS = 0.46
TIME FOR FORMING STIFFNESS MATRIX = 0.10
TIME FOR SOLVING STIFFNESS MATRIX = 0.54
TIME FOR CALCULATING DISPLACEMENTS = 0.08
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.08
----------
TOTAL TIME FOR THIS ANALYSIS = 1.78

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:55

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:56

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:56

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000
Page 16
Drawing1

E L E M E N T F O R M A T I O N 17:00:56

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.016195 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.52


TIME FOR CONTROLLING ANALYSIS = 0.44
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.58
TIME FOR CALCULATING DISPLACEMENTS = 0.14
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.06
----------
TOTAL TIME FOR THIS ANALYSIS = 1.80

A N A L Y S I S C O M P L E T E 2019/01/31 17:00:58

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:00:59

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:00:59

CASE: C1
Page 17
Drawing1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:00:59

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.020449 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.38


TIME FOR CONTROLLING ANALYSIS = 0.48
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.50
TIME FOR CALCULATING DISPLACEMENTS = 0.08
TIME FOR DETERMINING EVENTS = 0.02
TIME FOR UPDATING STATE = 0.08
----------
TOTAL TIME FOR THIS ANALYSIS = 1.60

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:01

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

Page 18
Drawing1
B E G I N A N A L Y S I S 2019/01/31 17:01:02

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:03

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:03

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.031501 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.46


TIME FOR CONTROLLING ANALYSIS = 0.38
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.52
TIME FOR CALCULATING DISPLACEMENTS = 0.12
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.08
----------
TOTAL TIME FOR THIS ANALYSIS = 1.62

Page 19
Drawing1

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:04

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:01:05

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:05

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:05

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.006570 1.000000 1.000000 1.000000

Page 20
Drawing1
TIME FOR INITIALIZING ANALYSIS = 0.50
TIME FOR CONTROLLING ANALYSIS = 0.52
TIME FOR FORMING STIFFNESS MATRIX = 0.08
TIME FOR SOLVING STIFFNESS MATRIX = 0.62
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.08
----------
TOTAL TIME FOR THIS ANALYSIS = 1.90

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:07

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:01:08

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:08

CASE: C1
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:08

CASE: C1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
Page 21
Drawing1
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.021173 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.44


TIME FOR CONTROLLING ANALYSIS = 0.46
TIME FOR FORMING STIFFNESS MATRIX = 0.10
TIME FOR SOLVING STIFFNESS MATRIX = 0.60
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.12
----------
TOTAL TIME FOR THIS ANALYSIS = 1.82

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:10

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:01:12

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:12

CASE: C2
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
Page 22
Drawing1
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:12

CASE: C2
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.000471 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.38


TIME FOR CONTROLLING ANALYSIS = 0.42
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.50
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.14
----------
TOTAL TIME FOR THIS ANALYSIS = 1.60

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:14

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:01:15

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:15
Page 23
Drawing1

CASE: C2
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:15

CASE: C2
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.005303 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.24


TIME FOR CONTROLLING ANALYSIS = 0.34
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.52
TIME FOR CALCULATING DISPLACEMENTS = 0.08
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.10
----------
TOTAL TIME FOR THIS ANALYSIS = 1.34

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:17

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

Page 24
Drawing1

B E G I N A N A L Y S I S 2019/01/31 17:01:18

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:18

CASE: C2
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:18

CASE: C2
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.010683 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.28


TIME FOR CONTROLLING ANALYSIS = 0.40
TIME FOR FORMING STIFFNESS MATRIX = 0.04
TIME FOR SOLVING STIFFNESS MATRIX = 0.62
TIME FOR CALCULATING DISPLACEMENTS = 0.08
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.12
----------
Page 25
Drawing1
TOTAL TIME FOR THIS ANALYSIS = 1.54

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:19

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:01:21

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:21

CASE: C3
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:21

CASE: C3
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

Page 26
Drawing1
0 0 1 Conv 1 0.002730 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.38


TIME FOR CONTROLLING ANALYSIS = 0.48
TIME FOR FORMING STIFFNESS MATRIX = 0.08
TIME FOR SOLVING STIFFNESS MATRIX = 0.68
TIME FOR CALCULATING DISPLACEMENTS = 0.10
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.10
----------
TOTAL TIME FOR THIS ANALYSIS = 1.82

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:23

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:01:24

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:24

CASE: C3
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:24

CASE: C3
Page 27
Drawing1
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.019461 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.22


TIME FOR CONTROLLING ANALYSIS = 0.42
TIME FOR FORMING STIFFNESS MATRIX = 0.06
TIME FOR SOLVING STIFFNESS MATRIX = 0.96
TIME FOR CALCULATING DISPLACEMENTS = 0.08
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.16
----------
TOTAL TIME FOR THIS ANALYSIS = 1.90

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:26

SAFE Post Tensioning 12.3.2 (Analysis Build 8858/32)


File: C:\Users\Syed Sohail\Desktop\TRY\asim\safe new\Drawing1.LOG

B E G I N A N A L Y S I S 2019/01/31 17:01:27

RUNNING ANALYSIS WITHIN THE GUI PROCESS


USING THE ADVANCED SOLVER (PROVIDES LIMITED INSTABILITY INFORMATION)

N O N L I N E A R S T A T I C A N A L Y S I S 17:01:27

CASE: C3
STARTING FROM ZERO (UNSTRESSED) INITIAL CONDITIONS
LOAD CONTROL TYPE = FORCE
NUMBER OF STAGES = 1
TYPE OF GEOMETRIC NONLINEARITY = NONE
INCLUDE ELASTIC MATERIAL NONLINEARITY = NO
INCLUDE INELASTIC MATERIAL NONLINEARITY = YES
Page 28
Drawing1
METHOD TO USE WHEN HINGES DROP LOAD = UNLOAD ENTIRE STRUCTURE
SAVE POSITIVE INCREMENTS ONLY = NO
RELATIVE FORCE CONVERGENCE TOLERANCE = 1.00E-05
RELATIVE EVENT TOLERANCE = 0.010000

E L E M E N T F O R M A T I O N 17:01:27

CASE: C3
STAGE NUMBER (OF 1 STAGES) = 1
ENTIRE STRUCTURE IS ACTIVE = YES
CHANGES TO ELEMENTS IN STRUCTURE = ADD ONLY
TIME AT BEGINNING OF STAGE (DAYS) = .000000
DURATION OF STAGE (DAYS) = .000000

Saved Null Total Iteration Relative Curr Step Curr Sum Max Sum
Steps Steps Steps this Step Unbalance Size of Steps of Steps
( 1 25 200 10/40 1.000000 1.000000 1.000000 1.000000)

0 0 1 Conv 1 0.009574 1.000000 1.000000 1.000000

TIME FOR INITIALIZING ANALYSIS = 0.30


TIME FOR CONTROLLING ANALYSIS = 0.48
TIME FOR FORMING STIFFNESS MATRIX = 0.04
TIME FOR SOLVING STIFFNESS MATRIX = 0.94
TIME FOR CALCULATING DISPLACEMENTS = 0.12
TIME FOR DETERMINING EVENTS = 0.00
TIME FOR UPDATING STATE = 0.14
----------
TOTAL TIME FOR THIS ANALYSIS = 2.02

A N A L Y S I S C O M P L E T E 2019/01/31 17:01:29

Page 29

Você também pode gostar