Project No  5164 16  01  001   Sht. No.

1 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
 
 
 
 
 
 
 
 
 
 
 
 
 
 
Hoarding Calculations 
 
for 
 
Hoardtek 
 
at 
 
May Day Barnsley 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 2 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   

Table of Contents 
1  Introduction ......................................................................................................................................................... 3 
2  Drawings .............................................................................................................................................................. 3 
3  Materials .............................................................................................................................................................. 4 
3.1  Component Properties and Characteristics ................................................................................................. 4 
4  Design standards and codes ................................................................................................................................ 5 
5  Loading ................................................................................................................................................................ 6 
5.1  Dead loads .................................................................................................................................................... 6 
5.2  Live loads ...................................................................................................................................................... 6 
5.2.1  Wind loads ............................................................................................................................................ 6 
6  Design checks ...................................................................................................................................................... 7 
6.1  Wind Calculations ......................................................................................................................................... 7 
6.2  Wind Zone Dimensions ................................................................................................................................ 8 
6.3  Sliding Coefficient ......................................................................................................................................... 8 
7  Overturning in Zone A ......................................................................................................................................... 9 
7.1  Sliding in Zone A ......................................................................................................................................... 10 
8  Overturning in Zone B ....................................................................................................................................... 11 
8.1  Sliding in Zone B ......................................................................................................................................... 12 
9  Overturning in Zone C ....................................................................................................................................... 13 
9.1  Sliding in Zone C ......................................................................................................................................... 14 
10  Overturning in Zone D ....................................................................................................................................... 15 
10.1  Sliding in Zone D ......................................................................................................................................... 16 
 
   
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 3 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   

1 Introduction 
 
The following calculations cover the as built hoarding, which is to facilitate site demarcation at May Day Barnsley. 
 
The calculations within are based on the typical arrangement of the greatest span / length/ loads. Any spans / 
lengths / loads of a lesser value are covered within this document.  
 

 
Figure 1 – Showing a cross section of the hoarding, showing the lever arm used. 

2 Drawings 
 
N/A 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 4 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
3 Materials 
 Conventional tube (galvanized steel) & fitting components. 
 Hoardtek Proprietary panels 
 Concrete blocks 
 

3.1 Component Properties and Characteristics 
 
Components:  Dimension /  Self‐weight  Safe working    Safe working 
  Category    moment MMAX    shear VMAX 
 
Steel tube  48.3 mm Ø  4.37 kg/m  1.12 kNm    29.20 kN 
(New, Galvanized) 
 
  225 mm  25 kg/m2 
 
 
Couplers:  Class  Self‐weight  Safe Working Load 
 
Right angle /  Class ‘A’  1.2 kg  6.1 kN 
Double  Class ‘B’  1.5 kg  9.1 kN 
 
Swivel  Class ‘A’  1.25 kg  6.1 kN 
  Class ‘B’  1.55 kg  9.1 kN 
 
Factored coupler value applied for   1.8 kg EACH 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 5 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
4 Design standards and codes 
 
TG 20:13  2013  Design Guide ‐ Technical guidance on the use of BS EN 12811‐1 
TG 04:11   2011   Anchorage Systems 
SG 04:10   2010   Preventing Falls in Scaffolding 
SG 25:10   2010   Access and Egress from Scaffolds 
CG 06:09   2009   Scaffold Design 
BS EN 12811‐1  2003   Temporary works equipment – Part 1: Scaffolds – Performance requirements  
     and general design 
BS EN 12812  2008   Falsework – Performance requirements and general design 
BS EN 13374  2013   Temporary edge protection systems – Product specification – Test methods 
BS EN 39  2001   Loose steel tubes for tube and coupler scaffolds – Technical delivery  
     conditions 
BS 1139‐1‐2  1990   Metal Scaffolding – Part 1: Tubes – Section 1.2 Specification for aluminium  
     tube 
BS 1139‐2‐2  2009   Metal Scaffolding – Part 2: Couplers – Section 2.2: Aluminium couplers and  
     special couplers in steel – Requirements and test methods 
BS 2482  2009   Specification for timber scaffold boards 
BS EN 1991‐1‐1  2002   Eurocode 1: Actions on structure – Densities, self‐weight and imposed loads 
BS EN 1991‐1‐4  2005   Eurocode 1: Actions on structure – Wind 
BS EN 1991‐2  2003   Eurocode 1: Actions on structures – Part 2: Traffic loads on bridges 
BS EN 1993‐1‐1  2005   Eurocode 3: Design of steel structures – Part 1‐1: General rules and rules for  
     Buildings 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 6 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
5 Loading 

5.1 Dead loads 
 
– see leg loads below In accordance with section 3.1 component properties. 
  – dead load of scaffold refer to section 6 – design checks. 
 

5.2 Live loads 
 

5.2.1 Wind loads 
  In accordance with BS EN 1994‐1‐4: 2005 
  refer to section 6.1 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 7 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
6 Design checks 

6.1 Wind Calculations 

 
Table 1 – Showing the wind pressure acting on the hoarding. 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 8 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
6.2 Wind Zone Dimensions 

 
Figure 2 – Showing the layout of the hoarding dimensions. 
 

6.3 Sliding Coefficient 
 
The sliding coefficient is to be taken as concrete on tarmac which gives a static friction coefficient of 0.4. Static 
friction coefficient was obtained from BS 5975:2008+A1:2011 table 24 and BS EN 12812:2008, Annex B, Table B.1. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 9 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
7 Overturning in Zone A 
 

 
Table 2 – Showing overturning moment in zone A for both parallel and perpendicular arrangements of hoarding. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 10 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
7.1 Sliding in Zone A 
 

 
Table 3 – Showing sliding force occurring in zone A for both parallel and perpendicular arrangements of the hoarding. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 11 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
8 Overturning in Zone B 
 

 
Table 4 ‐ Showing overturning moment in zone B for both parallel and perpendicular arrangements of hoarding. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 12 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
8.1 Sliding in Zone B 
 

 
Table 5 ‐ Showing sliding force occurring in zone B for both parallel and perpendicular arrangements of the hoarding. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 13 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
9 Overturning in Zone C 
 

 
Table 6 ‐ Showing overturning moment in zone C for both parallel and perpendicular arrangements of hoarding. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 14 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
9.1 Sliding in Zone C 
 

 
Table 7 ‐ Showing sliding force occurring in zone C for both parallel and perpendicular arrangements of the hoarding. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 15 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
10 Overturning in Zone D 
 

 
Table 8 ‐ Showing overturning moment in zone D for both parallel and perpendicular arrangements of hoarding. 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 
Project No  5164 16  01  001   Sht. No. 16 of 16 
 
Client   Hoardtek 
Suite 233/234 Baltic Chambers, 50 Wellington Street,  Project Title  May Day Barnsley Hoarding 
Glasgow. G2 6HJ  
Subject   Hoarding Calculations 
Tel: 0141 404 3990     Fax: 020 504 8565 
Email: info@rdgengineering.co.uk  Engineer  David Ostrowski   Date:  04/08/2016 
   
10.1 Sliding in Zone D 
 

 
Table 9 ‐ Showing sliding force occurring in zone D for both parallel and perpendicular arrangements of the hoarding. 

Prepared  DO  Checked  FS  Approved  FS  Revision  01  DO 


Date  04/08/2016  Date  04/08/2016  Date  04/08/2016     Date      16/08/2016
5164‐16‐01‐001 
 