Client Hoardtek
Suite 233/234 Baltic Chambers, 50 Wellington Street, Project Title May Day Barnsley Hoarding
Glasgow. G2 6HJ
Subject Hoarding Calculations
Tel: 0141 404 3990 Fax: 020 504 8565
Email: info@rdgengineering.co.uk Engineer David Ostrowski Date: 04/08/2016
Hoarding Calculations
for
Hoardtek
at
May Day Barnsley
Table of Contents
1 Introduction ......................................................................................................................................................... 3
2 Drawings .............................................................................................................................................................. 3
3 Materials .............................................................................................................................................................. 4
3.1 Component Properties and Characteristics ................................................................................................. 4
4 Design standards and codes ................................................................................................................................ 5
5 Loading ................................................................................................................................................................ 6
5.1 Dead loads .................................................................................................................................................... 6
5.2 Live loads ...................................................................................................................................................... 6
5.2.1 Wind loads ............................................................................................................................................ 6
6 Design checks ...................................................................................................................................................... 7
6.1 Wind Calculations ......................................................................................................................................... 7
6.2 Wind Zone Dimensions ................................................................................................................................ 8
6.3 Sliding Coefficient ......................................................................................................................................... 8
7 Overturning in Zone A ......................................................................................................................................... 9
7.1 Sliding in Zone A ......................................................................................................................................... 10
8 Overturning in Zone B ....................................................................................................................................... 11
8.1 Sliding in Zone B ......................................................................................................................................... 12
9 Overturning in Zone C ....................................................................................................................................... 13
9.1 Sliding in Zone C ......................................................................................................................................... 14
10 Overturning in Zone D ....................................................................................................................................... 15
10.1 Sliding in Zone D ......................................................................................................................................... 16
1 Introduction
The following calculations cover the as built hoarding, which is to facilitate site demarcation at May Day Barnsley.
The calculations within are based on the typical arrangement of the greatest span / length/ loads. Any spans /
lengths / loads of a lesser value are covered within this document.
Figure 1 – Showing a cross section of the hoarding, showing the lever arm used.
2 Drawings
N/A
3.1 Component Properties and Characteristics
Components: Dimension / Self‐weight Safe working Safe working
Category moment MMAX shear VMAX
Steel tube 48.3 mm Ø 4.37 kg/m 1.12 kNm 29.20 kN
(New, Galvanized)
225 mm 25 kg/m2
Couplers: Class Self‐weight Safe Working Load
Right angle / Class ‘A’ 1.2 kg 6.1 kN
Double Class ‘B’ 1.5 kg 9.1 kN
Swivel Class ‘A’ 1.25 kg 6.1 kN
Class ‘B’ 1.55 kg 9.1 kN
Factored coupler value applied for 1.8 kg EACH
5.1 Dead loads
– see leg loads below In accordance with section 3.1 component properties.
– dead load of scaffold refer to section 6 – design checks.
5.2 Live loads
5.2.1 Wind loads
In accordance with BS EN 1994‐1‐4: 2005
refer to section 6.1
6.1 Wind Calculations
Table 1 – Showing the wind pressure acting on the hoarding.
Figure 2 – Showing the layout of the hoarding dimensions.
6.3 Sliding Coefficient
The sliding coefficient is to be taken as concrete on tarmac which gives a static friction coefficient of 0.4. Static
friction coefficient was obtained from BS 5975:2008+A1:2011 table 24 and BS EN 12812:2008, Annex B, Table B.1.
Table 2 – Showing overturning moment in zone A for both parallel and perpendicular arrangements of hoarding.
Table 3 – Showing sliding force occurring in zone A for both parallel and perpendicular arrangements of the hoarding.
Table 4 ‐ Showing overturning moment in zone B for both parallel and perpendicular arrangements of hoarding.
Table 5 ‐ Showing sliding force occurring in zone B for both parallel and perpendicular arrangements of the hoarding.
Table 6 ‐ Showing overturning moment in zone C for both parallel and perpendicular arrangements of hoarding.
Table 7 ‐ Showing sliding force occurring in zone C for both parallel and perpendicular arrangements of the hoarding.
Table 8 ‐ Showing overturning moment in zone D for both parallel and perpendicular arrangements of hoarding.
Table 9 ‐ Showing sliding force occurring in zone D for both parallel and perpendicular arrangements of the hoarding.