7 ITEM NO. ATTACHED ITEM NO. ATTACHED ITEM NO. ATTACHED NO. DATE BY
8 PUMP P-2616 A/B/C/D/E/F 1 29/7/2011
9 MOTOR 2 1/9/2011
10 GEAR 3 3/10/2011
11 TURBINE 4
12 APPLICABLE OVERLAY STANDARD(S): 5
13 OPERATING CONDITIONS (5.1.3) LIQUID (5.1.3)
14 FLOW, NORMAL (m3/h) RATED 10 (m3/h) LIQUID TYPE OR NAME
15 OTHER
16 HAZARDOUS l FLAMMABLE (5.1.5)
25
26 SITE DATA (5.1.3) CORROSIVE / EROSIVE AGENT (5.12.1.9)
48 HORIZONTAL VERTICAL l SERVICE FACTOR 1 l MAX. SUCTION SPECIFIC SPEED: ACCOR. API (5.1.11)
49 l VOLTS/PHASE/HERTZ 400 / 3PH / 50 Hz l MAX. SOUND PRESS. LEVEL REQ'D 85 @ 1m (dBA) (5.1.16)
51 MINIMUM STARTING VOLTAGE (6.1.5) -20% EST MAX SOUND POWER LEVEL (dBA) (5.1.16)
58 BEARINGS (TYPE/NUMBER): STEAM MAX. PRESS. MAX. TEMP. MIN. PRESS. MIN. TEMP.
59 RADIAL / DRIVERS
60 THRUST / HEATING
61 VERTICAL THRUST CAPACITY COOLING WATER: (5.1.19) SOURCE
62 UP (N) DOWN (N) SUPPLY TEMP. (°C) MAX. RETURN TEMP. (°C)
63 NORM. PRESS. (bar) DESIGN PRESS. (bar)
64 MIN. RET. PRESS. (bar) MAX. ALLOW. D.P. (bar)
65 CHLORIDE CONCENTRATION: (mg/kg)
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
WASTE WATER PUMP P-2616 - DATA SHEET
Company doc. no.: Rev.: C0 D0 D1 Engineering doc. no.:
N/A Sheet 3 to 5 10J01762-MAC-DS-000-0016
NOTES
1
2
3
4 Each unit supply shall include, but not be limited to the following:
5 - Vertical suspended barrel type pump built to API Std 610 LATEST Edition
6 - sealing system according to API std. 682
7 - electric motor driver,75 kW and above, shall be provided with space heater and one PTC for phase
8 - Flexible coupling with spacer between thrust bearing and motor and rigid coupling with spacer between
9 pump and thrust bearing
10 - Non-spark coupling guard, brass material
11 - Vent piping and valves
12 - locally mounted instruments and safety devices, if any
13 - separate mounting plate and foundation bolts
14 - set of special tools necessary for the installation, commissioning and maintenance
15 - spare parts for commissioning
16 - spare parts for two years operation (separate quotation)
17 - all necessary equipment to ensure the respect of the noise levels limits
18 - painting
19 - shop tests and inspections
20 - Sub-Manufacturers coordination
21 - Engineering services (all necessary design drawings and documents, certified control
22 inspection and testing, operation and four copies of maintenance manuals, etc.)
23 - Power rating, speed are indiative only. To be verified/confirmed by Manufacturer
24 - The electric motor shall be installed in Zone 2 (Minimum),
25 The degree of protection shall be adeguate : Ex d/e IIB T3
26 - SEALING SYSTEM INSTRUMENTATION CHARACTERISTICS:
27 Instrument symbols and identification shall be in accordance with ISA S.5.1 (please, refers to project
28 document 10J01762-PRO-DW-000-001_3 - Symbol and legend for P&IDs (Instrumentation)).
29 All instruments shall be identified by tag numbers using stainless steel tag attached to the instrument.
30 Electrical field instruments shall be certified flameproof enclosures type (Ex-d IIB T3 min, to be
31 confirmed later). Mechanical protection shall be IP-65 (min) as per IEC 60529 for electronic instruments
32 and IP-55 (min) for mechanical instruments. Instrument electrical connections shall have isometric thread
33 ISO M20. Switches shall be provided with hermetically sealed voltage free contacts, single pole,
34 double throw (SPDT), rating 2A@24VDC. Technical bulletins, material certificates, mechanical/electrical
35 protection certificates, calibration certificates for instrumentation shall be as per purchaser requisition
36 documents.
37 - The pump shall be installed in a open sump (concrete type). The line shaft lenght shall be 2 m approx (to be
38 defined later)
39 Vendor shall indicate in his offer the missing data:
40
41
42
43 A DIFFERENTIAL LEVEL BETWEEN DISCHARGE NOZZLE mm
44 B MINIMUM LIQUID LEVEL FROM BOTTOM OF SUMP mm
45 C DISTANCE BETWEEN SUCTION BELL AND BOTTOM OF SUMP mm 50
46 (B-C) MINIMUM SUBMERGENCE mm
47 D MINIMUM DIMENSION REQUIRED FROM PUMP LIFTING mm
48 E MINIMUM DISTANCE BETWEEN TWO PUMPS ( FOR FIG. 1 OR 2 ) mm
49 F MINIMUM DISTANCE BETWEEN PUMP CENTER AND WALL OF SUMP mm
50 H SUMP DEPTH mm 2050
51 L DISTANCE BETWEEN FINISH BASE AND DISCHARGE NOZZLE mm
52
53
54
55
56
OFFSITES ENGINEERING WORKS FOR THE ERBIL REFINERY 40,000 B/D EXPANSION PROJECT
WASTE WATER PUMP P-2616 - DATA SHEET
Company doc. no.: Rev.: C0 D0 D1 Engineering doc. no.:
N/A Sheet 4 to 5 10J01762-MAC-DS-000-0016
2 ROTATION: (VIEWED FROM CPLG END) CW CCW MANUFACTURER'S STANDARD l OTHER (SEE BELOW)
3 PUMP TYPE: (1.3) PUMP:
4 l VS1 VS2 VS3 VS4 VS5 VS6 VS7 BY COMPANY
5 CASING MOUNTING: SUMP COVER PLATE PUMP SURFACE PREPARATION
6 INLINE SEPARATE MOUNTING PLATE (8.3.8.3.1) PRIMER
7 SEPARATE SOLE PLATE (8.3.8.3.3) FINISH COAT
8 CASING SPLIT: BASEPLATE / COLUMN: (6.3.17)
9 AXIAL RADIAL BASEPLATE SURFACE PREPARATION
10 CASING TYPE: PRIMER
11 SINGLE VOLUTE MULTIPLE VOLUTE DIFFUSER FINISH COAT
12 CASE PRESSURE RATING: SHIPMENT: (7.4.1)
13 MAX ALLOWABLE WORKING PRESSURE (bar) DOMESTIC l EXPORT EXPORT BOXING REQUIRED
14 @ (°C) OUTDOOR STORAGE MORE THAN 6 MONTHS
15 HYDROTEST PRESSURE (bar) SPARE ROTOR ASSEMBLY PACKAGED FOR:
16 SUCTION PRESS. REGIONS MUST BE DESIGNED FOR MAWP (5.3.6) HORIZONTAL STORAGE VERTICAL STORAGE
17 NOZZLE CONNECTIONS: (5.4.2) TYPE OF SHIPPING PREPARATION
18 SIZE (DN) FLANGE FACING POSITION
19 RATING HEATING AND COOLING
6 l COORDINATION MEETING REQUIRED (9.1.3) SHOP INSPECTION (7.1.4) PERF. CURVE APPROVAL
7 MAXIMUM DISCHARGE PRESSURE TO INCLUDE (5.3.2) TEST WITH SUBSTITUTE SEAL (7.3.3.2b)
8 MAX RELATIVE DENSITY TEST NON-WIT WIT OBSERVE
9 MAX DIA. IMPELLERS AND/OR NO OF STAGES HYDROSTATIC TEST OF BOWLS l
10 OPERATION TO TRIP SPEED AND COLUMN (8.3.13.2)
11 CONNECTION DESIGN APPROVAL (5.12.3.4) HYDROSTATIC (7.3.2)
12 TORSIONAL ANALYSIS REQUIRED (5.9.2.1) PERFORMANCE (7.3.3) (1) l
13 TORSIONAL ANALYSIS REPORT (5.9.2.6) RETEST ON SEAL LKGE (7.3.3.2d)
14 PROGRESS REPORTS (9.3.3) NPSH (7.3.4.2)
15 OUTLINE OF PROCEDURES FOR OPTIONAL TESTS (9.2.5) COMPLETE UNIT TEST (7.3.4.3) (1) l
16 ADDITIONAL DATA REQUIRING 20 YEARS RETENTION (7.2.2.1f) SOUND LEVEL TEST (7.3.4.4) (1) l
17 MANIFOLD PIPING TO SINGLE CONNECTION (6.5.1.6) CLEANLINESS PRIOR TO l
18 VENT VENT COOLING WATER FINAL ASSEMBLY (7.2.2.2)
19 MOUNT SEAL RESERVOIR OFF BASEPLATE (6.5.1.4) NOZZLE LOAD TEST (6.3.6)
20 FLANGES REQ'D IN PLACE OF SOCKET WELD UNIONS (6.5.2.8) 4 HR. MECH. RUN TEST(7.3.4.7.2)
21 CONNECTION BOLTING PTFE COATING SS MECHANICAL RUN UNTIL OIL
22 PAINTED l ASTM A153 GALVANIZED TEMP. STABLE (7.3.4.7.1)
23 INSTALLATION LIST IN PROPOSAL (9.2.3L) 4 HR. MECHANICAL RUN AFTER
24 VERTICAL PUMPS OIL TEMP. STABLE (7.3.4.7.3)