PART B - PILING WORKS

ITEM DESCRIPTION PAGE AMOUNT

PRECAST REINFORCED CONCRETE PILES (ALL PROVISIONAL)

SUMMARY

1 PILING EQUIPMENT & TEST PILE PIL/TEST/7 69,440.00

2 WATER TANK PIL/BA/1 254,604.00

324,044.00
TOTAL CARRIED TO SUMMARY

SUM/PIL/1
PART B - PILING WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

PRECAST REINFORCED CONCRETE PILES (ALL PROVISIONAL)

General Notes:
This Bill of Quantities shall be read in conjunction with
structural drawing as specified

All drawing shall be read in conclusion with all relevant


structural architecture, mechanical and electrical drawings.
The piles shall be 200mm x 200mm reinforced concrete pile;
as specified. Refer to the Specifications, General Conditions
and Preliminaries and Trade Preambles for items applicable to
the Piling Works

Equipment and Plant


The Contractor shall provide all equipment, plant and vehicles
including frame, lifting and driving devices and temporary
guide rails with maintenance and supply of fuel and lubricants
and other equipment necessary for the proper execution and
completion
The Contractor shall be responsible to provide approved piling
machine to minimise the effects of vibration, air pollution,
noise and detrimental disturbance to the existing building and
surrounding
The piling machine shall remain on site through out the
contract period. It shall not be removed from site until
completion of all piling works.
The Contractor shall visit the site and take note of close
proximity of the existing building nearby which shall be
adequately and safely protected against settlements,
structural defects and pollution during the period of
construction. Settlement monitor
The Piling Contractor shall undertake any remedies as
consequential defects of the existing building and surrounding
arising from piling operation.

TO COLLECTION

PIL/TEST/2
PART B - PILING WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

REINFORCED CONCRETE PILES (ALL PROVISIONAL)

Accuracy And Tolerance


The Contractor shall ensure the absolute true to position
vertically of all piles by providing all necessary guide rails etc.
during driving, the cost of which are deemed to have been
included in the rate entered in the Bills of Quantities.

Handling, Lifting and Pitching


Piles shall be only be supported at the specified points and, if
necessary at additional points between them.

Care shall be taken at all stages of handling of piles to avoid


damaging the piles. If the piles are put down temporarily after
being lifted, they shall be placed on trestles or blocks located
at the lifting points.

Piles shall be lifted and pitched accurately in their positions


and on appropriate lines and levels. Where piles have been
damaged due to handling, lifting and pitching, the Contractor
shall be required to replace such piles at his own expense.

Driving

Piles shall be drive true to position. Any pile which has been
driven out of position or alignment. Care shall be taken during
driving to prevent any tendency of the concrete piles twist or
rotate.

Piles shall be drive true to the required depth and on reaching


such depth to the required set as designed or as directed by
the S.O.

Driving Sequences and Risen Piles

Piles shall be driven in an approved sequences to minimize


the detrimental effects of heave and lateral displacement of

When required by the S.O. levels and measurement shall be


taken to determine the amount of the pile and ground
movement resulting from the driving process.

Where piles have risen as a result of driving adjacent piles,


the Contractor shall submit to the S.O. his proposals for
correcting this and the avoidance of it in subsequent work.

TO COLLECTION

PIL/TEST/3
PART B - PILING WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

REINFORCED CONCRETE PILES (ALL PROVISIONAL)

PILING EQUIPMENT

A Provide, assemble and set up on site necessary piling


equipment utilising plant and tools and subsequently
dismantle and remove from the site on completion of piling ITEM 20,000.00

B Allow for maintaining at all times on site necessary piling


equipment utilising plant, tools, fuel, operative and associated
labour for the whole duration of the piling works including all
standing/idling time and additional cost of all fuel, operative
and associated labour ITEM 10,000.00

C Allow for the moving of necessary piling equipment for all


building utilising plant and tools in and about the site as often
and whenever necessary including all necessary dismantling
and reassembling for piling operation at respective ground
formaiton level as shown in the site plan including any
temporary staging and platform constructed at the
Contractor's own expenses to ease piling operation and any
superficial excavation to facilitate movement of piling
equipment and plant ITEM 10,000.00

Setting Out, Resurvey And As-Built-Drawings

D Allow for providing labours, peg rods, survey instruments etc.


for setting out the works by a Licensed Surveyor and on
completion of the Piling Works allow for the employment of the
same Licensed Surveyor to check and prepare drawings
showing final position. On completion of the piling works, the
contractor should submit 6 set as-built drawing for all blocks
endorsed by surveyor for S.O. approval ITEM 5,500.00

PILING RECORD

E Allow for recording, maintaining and submission of piling


results for all blocks in triplicate, as described duly signed by
the contractor and the S.O.'s representative and delivery the
same to the S.O. as the works proceeds ITEM

TO COLLECTION 45,500.00

PIL/TEST/4
PART B - PILING WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

REINFORCED CONCRETE PILES (ALL PROVISIONAL)

TEST PILE

Supply, deliver, unload, handle, transport and pitch for driving


of precast reinforced concrete piles and spun piles to
manufacturer's details and S.O.'s /Engineer approval as
described:-

200mm x 200mm R.C Piles

A 200mm x 200mm Initial Pile, 9.00m long, including chilled


cast iron pile shoe and pointed toe No 5 270.00 1,350.00

Drive only precast reinforced concrete piles singly or cluster at


required level as described:-

200mm x 200mm R.C Piles

B 200mm x 200mm Initial Pile, 9.00m long, including chilled


cast iron pile shoe and pointed toe m 45 16.00 720.00

2,070.00
TO COLLECTION

PIL/TEST/5
PART B - PILING WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

REINFORCED CONCRETE PILES (ALL PROVISIONAL) (cont'd)

TEST PILE

CUT OFF
A Cut off 200mm x 200mm reinforced concrete pile to the
required level in accordance with the manufacturer's
reccommendation and S.O.'s /Engineer approval including
stripping to expose reinforcement bars, cut, bend and bind for
casting into pilecaps other necessaries (measured separately)
and dispose off surplus length and debris from site No 5 45.00 225.00

STATER
B Starter bar for 200mm x 200mm reinforced concrete pile
complete with plate tack welded to mild steel bar and
complete with concrete filling and pile surface to be roughened
all to Engineers Drawing No 5 129.00 645.00

C Extra for dolly to pile cap soffit level Rate Only

TESTING FOR WORKING AND TEST PILES

Provide all necessary labour, equipment, hydraulic jack,


deflection gauges, kentledge, temporary staging and other
necessary item to complete and test up to twice design
working load including all preparation to pile head and
attendance of Engineer and Supervisor during the test period
and removal upon completion as directed by the S.O.

D Load Test ; on 200mm x 200mm R.C pile ITEM 12,000.00

12,870.00
TO COLLECTION

PIL/TEST/6
PART B - PILING WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

REINFORCED CONCRETE PILES (ALL PROVISIONAL) (cont'd)

TESTING FOR WORKING AND TEST PILES (cont'd)

Carrying out Pile Analyser (PDA) Test with CAPWAP analysis


from field data and submitting full engineering report including
interpretation of test result with endorsement

A Test ; on 200mm x 200mm R.C pile No 5 1,800.00 9,000.00

9,000.00
TO COLLECTION

COLLECTION From Page

PIL/ 1 -

PIL/ 2

PIL/ 3 45,500.00

PIL/ 4 2,070.00

PIL/ 5 12,870.00

PIL/ 6 9,000.00
.

TOTAL SUMMARY CARRIED TO GENARAL SUMMARY 69,440.00

PIL/TEST/7
PART B - PILING WORKS

ITEM DESCRIPTION UNIT QTY RATE AMOUNT

PRECAST REINFORCED CONCRETE PILES (ALL PROVISIONAL)

Supply, deliver, unload, handle, transport and pitch for


driving of precast reinforced concrete piles and spun piles to
manufacturer's details and S.O.'s /Engineer approval as

200mm x 200mm R.C Piles

A 200mm x 200mm Initial Pile, 9.00m long, including chilled


cast iron pile shoe and pointed toe No 433 270.00 116,910.00

Drive only precast reinforced concrete piles singly or cluster


at required level as described:-

200mm x 200mm R.C Piles

B 200mm x 200mm Initial Pile, 9.00m long m 3,897 16.00 62,352.00

CUT OFF

C Cut off 200mm x 200mm reinforced concrete pile to the


required level in accordance with the manufacturer's
reccommendation and S.O.'s /Engineer approval including
stripping to expose reinforcement bars, cut, bend and bind
for casting into pilecaps other necessaries (measured
separately) and dispose off surplus length and debris from No 433 45.00 19,485.00
site
STATER

D Starter bar for 200mm x 200mm reinforced concrete pile


complete with plate tack welded to mild steel bar and
complete with concrete filling and pile surface to be No 433 129.00 55,857.00
roughened all to Engineers Drawing

254,604.00
TOTAL CARRIED TO SUMMARY

PIL/BA/8