Você está na página 1de 10

Anchor Manoeuvres for Anchor

Equipment with Roller Chain Stopper

Deck Machinery

Operation Manual

2010-11-29
Anchor Manoeuvres for Anchor Equipment
with Roller Chain Stopper

Pos: 1 /Decksmaschinen/Texte/Aufbau und Funktion/Grafik RKS Spannschloss @ 3\mod_1246861148698_311.doc @ 27212 @

4 3

Figure 1: roller chain stopper

1 Pawl
2 Anchor chain
3 Chain roller
4 Lashing device
Pos: 2 /Allgemeines/Dokumentensteuerung/Seitenwechsel @ 0\mod_1127910353774_0.doc @ 563 @

2/7 2010-11-29 Techen, Kerstin


Anchor Manoeuvres for Anchor Equipment
with Roller Chain Stopper

Pos: 3 /Decksmaschinen/Texte/Betrieb/Fieren Kettenstopper Spannschloss @ 4\mod_1283339204008_311.doc @ 37821 @ 1

1 Lower anchor
1. Use disconnection device to engage windlass.
2. Release spindle band brake of windlass.

!
When the anchor is heaved into the anchor pocket with full power, the anchor
pocket puts extreme strain on the winch drive when stopping.
Reel in the anchor at a low heaving speed and stop the drive immediately once the
anchor pocket is reached!
3. Heave anchor into anchor pocket.
4. Tighten windlass brake to maximum braking power.
5. Check that the pawl is lifted up completely.
6. Loosen the lashing device.
7. Take the lashing rope out of the lashing device and the anchor chain.

Figure 2: chain stopper in lowering position


8. Use the disconnection device to disengage the windlass.

!
If the chain is lowered too quickly, the centrifugal force lifts the chain links in the
cable lifter of the windlass.
The chain may only be lowered at a speed, at which the chain links are still guided
in the cable lifter.
Only slightly release the spindle band brake to begin with. Only increase the chain
speed very gradually by slightly loosening the spindle band brake. Ensure the
chain is being guided in the cable lifter!
9. Slightly release the windlass brake, and lower the anchor.

Techen, Kerstin 2010-11-29 3/7


Anchor Manoeuvres for Anchor Equipment
with Roller Chain Stopper

10. Once sufficient anchor chain has been lowered, tighten the windlass brake
to maximum braking force.

Pawl

Horizontal chain link

Frame

Figure 3: pawl inserted correctly

11. Flip pawl down.


The pawl must lie completely on the frame in front of a horizontal chain link.

Figure 4: pawl applied to horizontal chain link

Figure 5: pawl applied to vertical chain link

If the pawl is applied to a chain link, correct the location of the chain. There
are two options here:

4/7 2010-11-29 Techen, Kerstin


Anchor Manoeuvres for Anchor Equipment
with Roller Chain Stopper

• Very slightly release the windlass brake and lower the anchor chain
until the pawl slides in front of a horizontal chain link. Then tighten the
windlass brake to maximum braking power.
or
• Use the disconnection device to engage the windlass. Very slightly
release the windlass brake and mechanically heave the anchor chain
until the pawl slides in front of a horizontal chain link. Then tighten the
windlass brake to maximum braking force, before using the
disconnection device to uncouple the windlass.

Figure 6: chain stopper in clamping position


Pos: 4 /Allgemeines/Dokumentensteuerung/Seitenwechsel @ 0\mod_1127910353774_0.doc @ 563 @

Techen, Kerstin 2010-11-29 5/7


Anchor Manoeuvres for Anchor Equipment
with Roller Chain Stopper

Pos: 5 /Decksmaschinen/Texte/Betrieb/Anker hieven Kettenstopper Spannschloss (2010-09-01 13:09:56) @ 3\mod_1246864328013_311.do c @ 27242 @ 1

2 Hoist anchor

Figure 7: chain stopper in clamping position


1. Use disconnection device to engage windlass.
2. Release windlass brake.
3. Briefly hoist the anchor chain mechanically until the strain is removed from
the pawl and the pawl can be raised.
4. Tighten windlass brake to maximum braking power.
5. Lift up pawl.

Figure 8: chain stopper in hoisting position


6. Release windlass brake.

6/7 2010-11-29 Techen, Kerstin


Anchor Manoeuvres for Anchor Equipment
with Roller Chain Stopper

!
When the anchor is hoisted into the anchor pocket with full power, the anchor
pocket puts extreme strain on the drive when stopping.
In front of the anchor pocket reel in the anchor at a low heaving speed and stop the
drive immediately once the anchor pocket is reached!
7. Hoist anchor into anchor pocket.
8. Tighten windlass brake to maximum braking power.
9. Pull the lashing rope through a chain link and fix it in the lashing device.
10. Pull the wire rope using the lashing device until the anchor lies in the anchor
pocket.

!
When the pawl is inserted in this position, it is subjected to the weight of the anchor
and the anchor chain. In this case, it can no longer be released manually. It is no
longer possible to perform an emergency anchor manoeuvre.
Do not put strain on the pawl when the anchor has been hoisted!
!
Once the anchor has been hoisted, the weight of the anchor and the anchor chain
is not taken up by the pawl.
For safety reasons, leave the spindle band brake tightened to maximum braking
force if the lashing device is faulty!
=== Ende der Liste f ür Textmarke Inhalt ===

Techen, Kerstin 2010-11-29 7/7


Maintenance Plan

Deck Machinery

2012-01-31
Maintenance Plan

Pos: 1 /D ecksmaschinen/Text e/Instandhaltung/Wartungspl ä ne/Modul e/ 000_0_Intervall @ 4\m od_1256124429264 _311.doc @ 30 053 @ 1 @ 1

1 Before Starting Up
Pos: 2 /D ecksmaschinen/Text e/Instandhaltung/Wartungspl ä ne/Modul e/ A_Arbeit @ 4\m od_1256124432670 _311.doc @ 30060 @ 2 @ 1

1.1 Inspection
Pos: 3 /D ecksmaschinen/Text e/Instandhaltung/Wartungspl ä ne/Modul e/ 000_A_ 0_St andard @ 3\m od_1256050 753657_311.doc @ 29852 @ @ 1

• Look for damaged mechanical, hydraulic or electric components and


connections and tighten, repair or replace before starting up.
• Check safety equipment visually. Don't start the deck machinery with
defective or inoperative safety equipment!
• Look around the deck machinery for debris that could interfere with the
operation and remove before starting up.
Pos: 5 /D ecksmaschinen/Text e/Instandhaltung/Wartungspl ä ne/Modul e/ 150_0_Intervall @ 4\m od_1256124739482 _311.doc @ 30067 @ 1 @ 1

2 Monthly
Pos: 6 /D ecksmaschinen/Text e/Instandhaltung/Wartungspl ä ne/Modul e/ A_Arbeit @ 4\m od_1256124432670 _311.doc @ 30060 @ 2 @ 1

2.1 Inspection
Pos: 7 /D ecksmaschinen/Text e/Instandhaltung/Wartungspl ä ne/Modul e/ 150_A_ 0_St andard @ 3\m od_1256050766171_311. doc @ 29866 @ @ 1

• Look for misalignment of rods, brackets, arms, pivots, etc.. Repair as


needed.
• Check all components for the security of their installation, such as loose
bolts, worn / frail wiring, etc.. Tighten fasteners, repair wiring, etc., as
required.
• Check safety equipment and alarms are functioning properly, and provide
proof.
• Inspect structural members for corrosion, rust, cracks, or pitting of the
surface. Clean rust or corroded surface down to bare metal and refinish
using rust inhibitive base coat, followed with the three coat paint system and
final colour coat.
Pay Attention!
Welding only after consulting HATLAPA service department! Cracks may be
welded if such repair will not affect equipment’s capability.
Check especially protection of steel band on spindle band brake against corrosion
by being painted.
• Check bearings for wear and replace as required.
• Check electrical system for security, breakage and deterioration. Repair or
replace as needed.
Pos: 8 /D ecksmaschinen/Text e/Instandhaltung/Wartungspl ä ne/Modul e/ 150_A_ 1_Bandbre mse_allgemei n @ 4\mo d_1256204839748 _311.doc @ 30319 @ @ 1

• Check easy movement of spindle band brake and replace worn or oil-
smeared brake linings by new ones; see chapter "Maintenance
Recommendations for Spindle Band Brakes".
Pos: 14 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/B _Arbeit @ 4\mo d_1256125681448 _311.doc @ 30096 @ 2 @ 1

2.2 Cleaning
Pos: 15 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/150_B _0_Standard @ 4 \mo d_1256204624530_311.doc @ 30305 @ @ 1

• Clean the outside of all components.


Pos: 16 /D ecksm aschinen/Texte/Inst andhal tung /Wartungspläne/M odul e/150_B_1_E-M otor @ 4\m od_1256 135734893_311.doc @ 30223 @ @ 1

• Remove dust deposit on the electric motors.


Pos: 18 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/C_Arbeit @ 4\m od_1256125018532 _311.doc @ 30075 @ 2 @ 1

2.3 Lubrication
Pos: 19 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/150_C _0_St andard @ 3\m od_1256050766515 _311.doc @ 29873 @ @ 1

• Apply grease by grease gun to all grease nipples until the grease used has
completely worn away from the points of lubrication; for recommended
grease see chapter "Lubricating Charts".
Pos: 20 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/150_C _1_Ban dbr emse_allgemei n @ 4\mo d_1282736493289 _311.d oc @ 3766 6 @ @ 1

• Lubricate spindle of spindle band brake by brush; for recommended grease


see chapter "Lubricating Charts".

2/3 2012-01-31 Berkefeld, Mark


Maintenance Plan

Pos: 22 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/150_C _3_offene Getriebe @ 3\mo d_1256111558663 _311.doc @ 29963 @ @ 1

• Lubricate gear wheels by brush; for recommended grease see chapter


"Lubricating Charts".
Pos: 25 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/150_C _6_g eschlossene Getriebe @ 4\mo d_1256117248034_311.doc @ 30008 @ @ 1

• Check oil level in gear box and replenish oil as necessary; for amount and
recommended oil see chapter "Lubricating Charts".
Pos: 29 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/250_0_Intervall @ 4\mo d_1256125179578 _311.doc @ 30082 @ 1 @ 1

3 Every 500 Working Hours, at least Yearly


Pos: 32 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/C_Arbeit @ 4\m od_1256125018532 _311.doc @ 30075 @ 2 @ 1

3.1 Lubrication
Pos: 33 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/250_C _1_g eschlossenes Getriebe @ 4\ mo d_1256210914824_311.doc @ 30339 @ @ 1

• Replace gear oil completely; for amount and recommended oil see chapter
"Lubricating Charts".
Pos: 39 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/300_0_Intervall @ 4\mo d_1256130800452 _311.doc @ 3 0175 @ 1 @ 1

4 Yearly
Pos: 46 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/B _Arbeit @ 4\mo d_1256125681448 _311.doc @ 30096 @ 2 @ 1

4.1 Cleaning
Pos: 47 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/300_B _1_Schaltschränke @ 4\mo d_1256215071996 _311.doc @ 30384 @ @ 1

• Hoover the contactor cabinets inside.


Pos: 72 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/850_0_Intervall @ 4\mo d_1256125917565 _311.doc @ 30117 @ 1 @ 1

5 100 Working Hours after Initial Operation / Repair of a Component


Pos: 73 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/A _Arbeit @ 4\mo d_1256124432670 _311.doc @ 30060 @ 2 @ 1

5.1 Inspection
Pos: 74 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/850_A _0_Standard @ 3\mo d_1256052950555_ 311.doc @ 29913 @ @ 1

• Check that all mechanical connection elements that were loosened are firmly
seated.
Pos: 85 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/950_0_Intervall @ 4\mo d_1256126067003 _311.doc @ 30124 @ 1 @ 1

6 According to the Requirement of the Manufacturer


Pos: 86 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/A _Arbeit @ 4\mo d_1256124432670 _311.doc @ 30060 @ 2 @ 1

6.1 Inspection
Pos: 87 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/950_A _0_Seile @ 3\m od_125 6050773748_311.doc @ 29880 @ @ 1

• Check all wires/ropes:


Avoid sharp edges.
Avoid crossed wires/ropes on the drum.
Avoid excessive angles.
Change damaged wires/ropes.
Pos: 88 /D ecksmaschinen/Texte/Insta ndhal tung/ Wartung spl äne/M odul e/C_Arbeit @ 4\m od_1256125018532 _311.doc @ 30075 @ 2 @ 1

6.2 Lubrication
Pos: 90 /D ecksmaschinen/Text e/Instandhal tung/Wartungspl äne/M odul e/950_C _2_E-M otor @ 4\m od_1256196686349 _311.doc @ 30263 @ @ 1

• Lubricate bearings of the electric motors according supplier's documentation.


=== Ende der Liste für Textmar ke Inhalt ===