产品型号:QC190/930-73-10.3/540
编 号:50HL1146-0-0SM3
Number: 50HL1146-0-0SM3
编制:
Compile
校对:
Check
审核:
Confirm
0
第壱章 总则 Chapter 1 general rules
1
2 部分:锅炉机组》以及《火力发电厂基本建设工程启动及竣工验
2.1 准备 preparation
2.1.1 启动前全面检查炉内各部件包括锅炉附件,确认受压部件内无杂
hours.
4
temperature, normally it is 50~100℃ lower than rated load.
2.1.15 当锅炉汽压升到工作压力时关闭过热器上的疏水阀,调整安全阀 。
When boiler steam pressure rises to working pressure, close the water
distribution valve on the super heater and adjust safety valve.
2.1.16 汽包和过热器的安全阀整定压力应按中国标准执行。
Pressure of safety valve for steam drum and super heater shall be
according to requirement of Chinese Industrial Standards.
2.1.17 安全阀调整后,要进行一次动作试验。检查安全阀开启压力是否正
确、排汽能力是否够。安全阀校验后应加铅封或加锁,严禁用重物
压或用物卡死。安全阀校验后,应及时办理签证。After safety valve
has been adjusted, one time action test shall be carried out. Check if
safety valve start-up pressure is correct and steam exhaust capacity is
enough. After calibration, safety valve shall be lead sealing or added
with lock, pressing with heavy object or stuck with object is prohibited.
After calibration, safety valve shall be added visa in time.
2.1.18 启动升压曲线:start-up pressure rising curve
10
MPa
0
0 1 2 3 4 5 6 7 8 9 10
T (h)
2.本曲线系从冷态到该炉工作压力下饱和蒸汽温度所需时间。
1。
At the time of super heater blow wash, boiler shall be maintained about
75% of working pressure; pipe blowing factor shall be greater than 1.
3.2.2 吹洗过程中应有一次停炉冷却(12h 以上)提高吹洗效果。
During blow wash, there shall be one time stop boiler for cooling (over
12 hours) to improve blow wash effect.
3.2.3 吹洗完后,应整理记录,办理签证。After blow wash, records shall
be collected and visa shall be added.
3.2.4 锅炉在完成上述工作及部分试运行合格后,必须按 GB50273-
2009《锅炉安装工程施工及验收规范》和 DL5190.2-2012《电力
建设施工技术规范第 2 部分:锅炉机组》,全负荷下连续运行 72
小时,运行过程中应注意检查,以各部件和各附件均运行正常为
合格。 After boiler has been finished with above-mentioned work and
6
qualified part of trial assembly, must continuously operate the boiler for
72 hours at full load according to GB50273-2009 <code for
construction and acceptance of boiler installation engineering> and
DL5190.2-2012 《 Technical specification for thermal power erection
specification.
1. 全开主蒸汽阀前的排水阀和放空排汽阀,打开主蒸汽阀的旁路
阀。 Fully open water drain valve and air vent and steam exhaust
valve in front of main steam valve, and open by-pass valve of main
steam valve.
2. 缓慢打开主蒸汽阀,全开时,关闭旁路阀、排水阀、放空阀。
Slowly open main steam valve, close by-pass valve, water drain valve
and air vent valve when main steam valve is fully open.
7
3.3.2 保持送汽稳定,并且蒸汽温度稳定,达到汽机要求后向汽机送汽,
在开始向汽机送汽的同时,开大汽水调节阀保持汽包水位,此时
给 水 从 手 动 切 换 为 自 动 。 Maintain steam feed stable and steam
temperature stable, when steam turbine requirement is met, feed steam
to steam turbine. At the same time of beginning to feed steam to steam
engine, open steam water adjusting valve wider to maintain steam drum
water level, at this time feed water shall be switched from manual
mode to automatic mode..
3.3.3 主蒸汽温度由减温器调节,使用时应严格按说明书操作。 Main
steam temperature shall be adjusted by de-super heater, when applying
main steam temperature, shall operate strictly according to instruction
book.
3.3.4 炉水处理 boiler water treatment
3.3.4.1 给水、炉水要求:feed water, boiler water requirement:
硅:Si 应保证蒸汽符合标准
Shall guarantee that steam conforms to stardard
电导率:conductivity ≤0.3μs/cm
β:炉水水质成分控制值
要求总排污≤2%
3.3.4.2.6 排污时先开第二个阀门,再微开第一个阀门暖管后接着再开大,
控制排污量。关闭时先关第一个阀门,后关第二次阀门。
When blowing down, first open the second valve, then slowly open the
first valve, after heating of the pipe, open it more widely to control
blow down quantity. First close the first valve, and then close the
second valve.
3.3.4.2.7 严 禁 用 加 长 手 柄 开 启 排 污 阀 。 Open blow down valve with long
handle is prohibited.
3.4 正常停炉 normal stop of boiler
一般一年一次大修,维修时间 20 天。维修时人员由人孔装置进入
锅炉,特别是汽包,应轻装,严防携带随身物品(钥匙等)落入
下降管或划伤受热面管子。 Normally, there is one main repair each
year; the period duration is 20 days. During maintaining, people shall
9
enter boiler through manhole, especially, when entering steam drum,
people shall take as less articles as possible, for example, keys etc.
shall not be taken for the reason that it may drop into down comer or
scratch heating pipes.
3.4.1 停炉前对锅炉系统做好全面检查工作,了解设备损伤情况,拟订
定期排污,自动上水切换为手动控制。停炉后 6 小时以内,不允
不允许上水,放水。一般 12 小时后可以打开烟道门,放灰门进行
自然通风冷却,并上水放水一次。 14 小时后再上水放水一次,以
后每 2 小时上水放水一次,以便锅炉各部分均匀冷却。26 小时左
第四章 停炉后的保养
Chapter 4: maintenance after shut-down of the
boiler
250 mg/升
3h,压力降低后,保护液灌满整个锅炉,用加入溶液产生 0.15~
第伍章 事故与处理
Chapter 5: accident and treatment
1. 水位计玻璃板(管)质量不符合规定,制造质量差,有缺陷 。
The quality of level gauge glass plate (duct) doesn’t meet regulated
requirements; Fabrication quality is bad with defects.
2. 安装不正确,受热膨胀后引起压力不均造成破裂。Installation is
incorrect, which results in uneven pressure due to heat expansion and
causes crack.
3. 冲洗操作不当,没有对水位计充分预热就猛开猛关水位计阀门 。
Flushing operation is not proper, suddenly open and close level gauge
valve without adequately preheat water gauge.
5.1.2 水位计爆裂处理方法 disposal method of level gauge blow out
1.二只水位计当其中一只爆裂时,应监视另一只水位计。立即关闭
爆裂水位计的汽、水阀门,迅速更换爆裂的玻璃板(管)。安装好后
先开少许(半扣)汽空间阀门,使用微量蒸汽吹热玻璃板(管),
再开炉水端阀门,打开放水阀,直至放水阀有汽水混合物放出,然
后将放水阀关严,再将汽、水二端阀门开至正常操作位置。If one of
the two level gauges blows out, the other level gauge shall be watched.
Immediately close steam water valve of the cracked level gauge, rapidly
replace glass plate(pipe) with new one. After replacement, first half open
steam valve to heat glass plate (pipe) by blowing steam, and then open
boiler water side valve, open water draining valve until there is steam
water mixture coming out, and then tightly close water draining valve,
then open valves of steam side and water side to normal operational
position.
2.当汽包上所有水位计都同时爆裂时,应立即按紧急停炉事故处
理,然后迅速更换玻璃板(管),待水位计全部修复后再使锅炉按
开车程序投入运行。 If all level gauges of steam drum blow out at the
same time, this shall be treated as an urgent boiler shutdown accident,
then rapidly replace glass plate (pipe), after all level gauges have been
repaired, make boiler operate as per boiler startup procedure.
5.2 省煤器管损坏 damage of economizer pipe
15
5.2.1 省煤器管损坏现象:economizer pipe damage phenomenon:
进入锅炉的给水明显减少,水位连续下降。锅炉下部烟气出口有潮
湿或有水滴出,泄漏严重时排烟温度较正常工况有所下降。The
feeding water entering boiler obviously reduces, water level
continuously drops. Boiler lower part gas outlet has dampness or water
leakage. When leakage is serious, discharged gas temperature is some
lower that under normal operation condition.
省煤器管损坏的原因 cause of economizer pipe damage
1.制造时对接接头(指弯头处)检验不严。焊接缺陷没有暴露,热
2.人员进入炉内,此时采取紧急放水措施并开启给水泵。迅速查出
管子的损坏部位。每次检查时间不得超过 5 分钟,严格控制汽包水
死上下集箱连接管,放尽该根受热面管内部结水,与大气连通。 If
single tube leaks, may cut off at the area of inlet header and outlet header
and tightly block the connection pipe between upper and lower headers,
drain up inside water of the single heating tube and make it be connected
to atmosphere.
4.管子泄漏根数超过 20%时,采用堵管损失受热面的办法,将影
响排烟温度及给水温度,使锅炉正常操作参数偏移。建议停炉整体
更换。If the number of leaked tubes exceeds 20%, then adopt the method
of blocking damaged heating surface. However, it will influence outlet
gas temperature and feed water temperature so as to change boiler
normal operation parameter. It is suggested boiler be shut down for entire
change of damaged pipes.
5.3 蒸发区管损坏 damage of evaporative bundle pipe
5.3.1 蒸发区管损坏现象 evaporative bundle pipe damage phenomenon
蒸发区管件发生爆管时,有沉闷振动声,进入炉内的饱和水迅速气
化上升,从而使炉内烟气阻力降立即直线上升。烟气含水量也成倍
上升,随后阻力降又回落,直至正常工况左右,严重时伴随水位升
降,若不迅速停车处理,操作工况将恶化。If evaporative bundle pipe
blows out, there will be a vibration clunk and the saturated water
entering boiler will be rapidly evaporated and rise, consequently the gas
resistance drop will increase sharply. Gas moisture will also fold
increase; afterwards resistance drop will decrease again to about normal
working condition. Under the serious condition, water level will go up
and down, in the case, rapidly shut down the boiler, otherwise,
operational condition will worsen.
5.3.2 蒸发区损坏的原因 cause of evaporative bundle pipe damage
17
1 .停炉,冷炉,人员进入炉膛。 Boiler shut down, boiler cooling,
personnel enter furnace.
2 .检查泄漏及爆破处,爆破管子四周光滑无集灰并呈灰白色 。
Check leakage or damaged area, the damaged pipe is smooth and has no
ash collection around and appears white grey.
3.处理:Disposal
a .对翅片蒸发区而言,若破损仅有一根(一排)管或二根(二
排)管,可采用省煤器堵管办法应急处理。不同的是出口集箱在炉
内作业不太方便,要注意事项是堵出事故这一排的管子,炉内炉外
千万不要弄错。For fin evaporative bundle area, if only one pipe or one
row of pipes, or if only two pipes or two rows of pipes are damaged, then
we can use economizer blocking pipe method as a emergency disposal
method. The difference is that it is not very convenient to work on outlet
header inside of boiler. One thing that you shall pay attention to is that it
can not be wrong for inside or outside of furnace of the blocked accident
pipe or row of pipes.
若受热面破损三排以上,建议大修,全部或局部更换受热面。 If
three or over three rows of heating pipes are damaged, it is suggested
that it be heavily repaired, i.e. entirely or partly change heating surface.
b .对光管受热面而言,破损三排以下,采用进出口堵管处理,三
18
5.4.1 过热器爆管的现象 super heater blow out phenomenon
1.事故主要发生在过热器前三排管子上,因气流中颗粒冲刷磨损
加上高温材质强度下降,管道内蒸汽高速流动产生的推力,综合导
致受热管某薄弱点无法承受高压蒸汽的冲击而爆管。事故一般发生
在第一 次开 车阶段及三年以后 某一操作不当之时。 The accident
mainly happens to super heater first three rows of pipes because of gas
contained particle washing abrasion plus high temperature material
strength drop and also the pushing force of high speed piping steam flow,
these factors all together result in some heating pipe weak point can not
stand high pressure steam impact, therefore the pipe blows out. The
accident generally happens at first time boiler startup or a time of
improper operation after three years of boiler operation.
2.低负荷运行是导致过热器爆管的罪魁祸首。Low load operation is
the key factor that causes super heater pipe blows out.
锅炉开停车及正常运行时负荷忽然的变化(指高温烟气量及烟
气中焓值的下降),蒸发量(的降低)偏离设计值过多,人为造成
“届时工况”过热器面积过大,过热蒸汽温度超出既定设计值,管
材壁温使强度值接近或超过材质屈服限,导致爆管。这种事故在开
停车时占有突出的比例,而且锅炉过热器爆管中, 80%以上事故是
19
也 是 导 致 过 热 器 烧 坏 爆 管 的 主 要 因 素 。 Low steam quality or
disqualification of cooling water, severe pipe wall corrosion or pipe end
blocking are all main factors that cause super heater burns out or blows
out.
5.4.3 过热器爆管的处理 disposal method of super heater pipe blowing out
管长方向呈微 V 开口。外观上爆破点比正常管段略粗。用电筒照明查
虑更换一段爆破处的管段(管段长度>600 mm 为宜),此时的对
20
5.5.1 事故现象 accident phenomenon
1.水冷壁翅片与管焊接有缺陷,或制造及安装时严密性实验不认
1.首先打开泄漏烟尘处的外护板,沿烟气直线方向向下用手触感
高温点,打开此处保温,进行水冷壁翅片补焊(此时,无须人员入
炉),这种情况通常并非一个点泄漏,因此,要注意周边焊缝的查
核和补焊。其中注意事项是补焊焊高一般不得大于 4 mm,防止损
伤水冷壁管。 First open outside guard plate of gas leakage area, touch
and feel high temperature point with hand along gas linear direction
downwards, open insulation at this area to perform membrane wall fin
repair weld (at this time, no personnel is needed to enter furnace). In this
case, generally there is not only one leakage point, so it shall be noticed
of the around weld seam checking and repairing. One thing shall be
noticed that repair weld throat thickness shall not be higher than 4mm to
prevent the damage to membrane wall tubes.
2.若发现是水冷壁墙与墙之间的密封扁钢焊缝泄露,其补焊长度
第六章 其他事故处理
Chapter 6: the treatment of other accidents
6.1 锅炉在工况下的运行,管件及配件、阀门等时有损坏及泄露,应在锅
22