Você está na página 1de 8

Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

Position Title and No. (N) K-5; Tariff Expert / Economist


Name of Firm Eptisa Servicios de Ingenieria S.L.
Name of Expert Kanai Deb Nath
Date of Birth July 09, 1954
Citizenship Bangladeshi
Education:
 M.A. in Economics, University of Dhaka, 1976
 B.A. (Honours.) in Economics, University of Dhaka, 1975
Employment Record relevant to the assignment:
Employing Organization and your
Summary of activities performed relevant to the
Period Title/Position, Contact Country
Assignment
Information for Reference
Oct. 2016 till Eptisa Servicios de Ingenieria S.L., Conducting economic and financial analysis of the
Date Spain subprojects to justify the economic and financial viability
Position: Project Economist of the subprojects through determining IRR, NPV and
For reference: Bangladesh BCR to be implemented in 34 selected districts of the
Name: Mohammad Asad, DGM country as per ADB guidelines.
Tel: 01725963747
e-mail: masad@eptisa.com
Jan. 2016 to Associates for Development Services  In depth assessment of existing water Tariff
Sept. 2016 Limited (ADSL) structures of the pourashavas
Position: Economist /Regional  Thorough analysis of operational and maintenance
Rehabilitation and Resettlement costs, estimated operation expenses of water
Expert supply subprojects, investment costs, determined
For reference: weighted average cost of capital, assessed
Tel: +880-2-8142030, +880-2-8121981 minimum water requirements, conducted seminars
e-mail: info@adslbd.com for consultation and discussion on water tariff issues,
participated in public awareness campaign on water
Bangladesh usages
 Recommended for updating water tariff to make
pourashavas commercially sustainable Update
water tariff structure for the pourashavas
 Economic and financial analysis of the water supply
road, market subprojects to justify the economic and
financial viability of the subprojects through
determining the IRR, NPV and BCR to be implemented
in 7 selected Pourashavas under the UGIIP-3 & CTEIP
as per ADB guidelines.
Oct. 2015 to KMC for the Project CEIP (Ph-1), Supervise Socio-economic Survey; review, finalize and
Dec. 2015 BWDB implement the RAPs for the 1st four polders under package-
Position: Team Leader/Economist 1, prepare and implement RAPs for the remaining polders
For reference: under packages II & III. As the Team Leader was
Bangladesh
Mr Khairul Matin responsible for overall coordination of the tasks related to
Tel: +8801741127736 RAP/LAP including writing SIA /RAP reports based on field
e-mail: khairulmatin@gmail.com data to be collected through, Consultation Meetings, &
FGDs.
Jun 2015 to Freelance Consultants Preparation of RAP report based on data and information
Sept 2015 Position: Economist/Resettlement collected through socio-economic survey and
Expert Bangladesh CMs/FGDs, conducted along the route alignment of the
proposed DEEP and assisting team members in any other
areas when needed.
Feb 2014 to HB Consultants Ltd Was responsible to conduct the economic and financial
May 2015 Position: Deputy Team Leader analysis of the subprojects in order to justify their
/Economist /BME Specialist economic and financial viability through determining
For reference: Bangladesh the EIRR, NPV, BCR as per ADB guidelines . As the
Michael Ellis, Team Leader, CCRIP, LGED DTL, performed the tasks of organizing and compiling the
Tel: +4915119558036 reports of the team members, arranging other
e-mail: mellis3@wannado.fr administrative works as per need.
Jun 2012 to ACE Consultants Ltd. Closely monitoring the economic sustainability ,
Jan 2014 Position: Economist / Financial providing continuous feedback to the Government, PSC,
Analyst and implementing agencies on Project Performance and
For reference: Bangladesh impact of its various components, conduct economic and
Bienvenido Gilles, Team Leader,ECRRP. financial analysis to justify feasibility through
Tel: +88028413571 determining EIRR, FIRR, ENPV, FNPV, EBCR &
e-mail: gillesbcph@yahoo.com FBCR etc.

TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 1


“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”
Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

Mar 2012 to BETS Consulting Services Ltd Analyse economic profile of the city and its
Jun 2012 Position: Economist / Financial development and project alternative scenarios of
Analyst development. Moreover, conduction of economic and
For reference: financial analysis of the sub-projects of the selected
Mr. Badiuzzaman, General Manager, Bangladesh Pourashavas/city corporations and determination of
BETS EIRR, NPV, BCR applying Cost-Benefit Analysis
Tel :+8801714117715 (CBA) method and preparation of financial projections
e-mail: :+8801714117715 of the subprojects. Moreover, co-operating the Team Leader
when necessary.
Apr 2007 to Engineering & Planning Consultants Overall supervision of the Bench Mark (BM) surveys on
Mar 2012 Ltd. Socio-economic aspect of the project area, conducting of
Position: Transport Economist / Urban Cost-Benefit Analysis (CBA), preparation of financial
Development Economist projections, conduction of public consultation meetings at
Bangladesh
For reference: union levels, analysis of the field surveys and financial and
Mr. Rahmani, Director, EPC economic reports
Tel: +8801713016057
e-mail: rahmani@epc-bd.com
May 2005 to BETS Consulting Services Ltd. Analyse economic profile and project alternative
Feb 2007 Position: Sr. Economist / Monitoring & scenarios of development, economic and financial
Evaluation Specialist / Statistician analysis of water supply projects of the selected
cum Project Co-coordinator Pourashavas/city corporations and determination of
For reference: EIRR, NPV, BCR applying Cost-Benefit Analysis (CBA)
Mr. Badiuzzaman, GM. method and preparation of financial projections of the
Tel: +8801714117715 subprojects including analyzing existing water tariff
e-mail: bzaman@betsbd.com Bangladesh structures, costs, estimated operation expenses of
water supply subprojects, investment costs,
determined weighted average cost of capital,
assessed minimum water requirements in the
pourashavas to update it, participated in public awareness
campaign on water usages, and recommended a base
tariff for the pourashavas to maintain commercial
sustainability.
Apr. 1997 to Engineering & Planning Consultants Responsible for organizing and supervising the socio-
Apr 2005 Ltd. (EPC) economic survey, traffic survey, commodity transaction
Position: Economist / Associated survey. Also supervised the task of collection of information
Economist / Senior Community related to economic sectors that have direct/indirect
Organizer / Socio-economist influence of the development of infra-structure including
For reference: Markets and Growth Centers. On the basis of BM data,
Bangladesh
Mr. Al Amin, Team Leader, Mongla Master assessed and evaluated the benefit accrued in overall
Plan Project socio-economic sector in the project area due to
Tel: +8801712258563 implementation of the Rural Infrastructure Projects .
e-mail: mototonj@yahoo.com The economic and financial evaluation of the project
was submitted through determining EIRR, FIRR, B/C,
NPV of the Feeder Roads.
Jul 1993 to Feb Selkhoze Promexport; Moscow, Socio-Economic Survey in the project area; Traffic
1997 Russia. Survey on the project roads and conducted surveys in the
Bangladesh
Position: Asstt. Economist markets located in the project area covering transaction of
goods in these Trading Centers/Markets.
Sept 1982 to Local NGOs Assists with implementing and coordinating the strategy for
Oct 1992 Position: Program Organizer the Community Networks
Bangladesh
/Coordinator

Sept 1978 to Bangladesh Biman; Bangladesh Krishi  Responsible for the day-to-day duties of managing a
May 1980; Jun Bank banking branch in Bangladesh Krishi Bank
1980 to Aug Position: Sales Assistant/Branch Bangladesh  Responsible for sales activities in Bangladesh Biman
1982 Manager

Membership in Professional Associations & Publications:


 Economic Association of Bangladesh

Language Skills :
Language Reading Speaking Writing
English Excellent Excellent Excellent
Bengali Excellent Excellent Excellent

TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 2


“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”
Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

Adequacy for the Assignment:


Detailed Tasks Assigned on Consultant’s Team of Experts Reference to Prior Work/Assignments that Best Illustrates
Capability to Handle the Assigned Tasks
 Analyze the current tariff structure, rules and steps taken till Name of Project Design Advance, Rural Infrastructure
date to update the tariff structure to keep pace with the supply Assignment Maintenance Program (RIMP), ADB funded
and demand scenario of DWASA’s water supply and sewerage Year Oct. 2016 till Date
services; Location Upazilas under 34 selected districts of the country
 Meticulously look at the procurement, operational and including Coastal Zones of Bangladesh
maintenance cost of its services inclusive of the entire Client Local Government Engineering Department (LGED)
spectrum of DWASA’s expenses, which could be considered Main project The program will improve the maintenance of the
under the tariff setting procedure. In as, she/he shall features rural roads to climate-resilient standards with a focus
profoundly familiarize her/himself with the relevant water on results. The impact will be improved income. The
supply and sanitation policies, that provide some road map for outcome will be improved rural connectivity. The key
the setting of tariff and its concomitant issues e.g. supply outputs include (i) rural road infrastructure upgraded
issues, utilization issues, environmental issues, etc. and maintained; and (ii) institutional arrangement for
 Estimate operating expenditure over the twenty year period; road maintenance strengthened
 Estimate investment requirements to meet demand. On this, Position held Project Economist
he shall require to work with the chartered accountant/FS Activities Was responsible for conducting economic and
 Determine a weighted average cost of capital for IT Long Run performed financial analysis of the subprojects to justify the
Marginal Cost (LRMC) & required revenue calculations; economic and financial viability through determining
 Calculate LRMC over a 20 year time period; IRR, NPV and BCR as per ADB guidelines.
 Develop a long time revenue requirement of DWASA in order to
develop, operate and maintain its service extent for Dhaka
metropolitan area;
 Review appropriateness of current energy adjustment
provisions. On this, She/he shall require to work with the
chartered accountant/ FMS;
 Assess minimum potable water requirements of low income
households & discuss costs & benefits of a cross-subsidized
lifeline tariff for basic consumptions ( lifeline tariff);
 Conduct internal and as well, broad based seminar to discuss
the tariff issues and get the customers’ views in respect of the
qualitative and quantitative aspects water supply and sewerage
services of DWASA;
 Recommend a base tariff that would allow DWASA a
commercially sustainable operation of the relevant utilities;
 Contribute to writing of the inception Report; Carryout any other
task(s) assigned by the TL/PD
Name of Assignment ADB TA-8913 REG: Developing Integrated Urban Development Plans in Selected DMC Cities
Incorporating Urban Change Resilience Principles
Year Jan 2016 to Sept 2016
Location Bangladesh
Client Local Government Engineering Department (LGED)
Main project features The project will support a range of activities to help lay the groundwork for planning processes, and build capacity
in preparing and responding to climate change-induced shocks and stresses in medium-sized and secondary
cities. It will support the preparation of climate risk, vulnerability and urban system assessments that can inform
the development of regional and urban master plans, city development strategies and action plans, infrastructure
plans and identify opportunities to strengthen the performance of infrastructure investments.
Position held Economist/Regional Rehabilitation and Resettlement Expert
Activities performed  Economic and financial analysis of the water supply road, market subprojects to justify the economic and
financial viability of the subprojects through determining the IRR, NPV and BCR to be implemented in 7
selected Pourashavas under the UGIIP-3 & CTEIP as per ADB guidelines.
 In depth assessment of existing WATER TARIFF STRUCTURES of the pourashavas
 Thorough analysis of operational and maintenance costs, estimated operation expenses of Water
Supply subprojects, investment costs, determined weighted average cost of capital, assessed
minimum water requirements, conducted seminars for consultation and discussion on water tariff issues,
participated in public awareness campaign on water usages
 Recommended for updating WATER TARIFF to make pourashavas commercially sustainable Update
water tariff structure for the pourashavas
Name of Assignment Preparation of the Structure Plan, Master Plan and Detailed area Plan for the Extension of the Khulna
Master Plan area up to Mongla Town
Year Sep 2007 - Nov 2007
Location Khulna, Bangladesh
Client Khulna Development Authority (KDA)
TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 3
“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”
Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

Main project features Field surveys including socio-economic survey, survey on informal economic activities, traffic survey and other
surveys; analysis of the previous five Financial Years’ (FY) budgets of KDA , Mongla Port Paurashava and
nineteen union parishads under the project area, and preparation of the Structure Plan, Master Plan and Detailed
area Plan for the project area.
Position held Urban Development Economist
Activities performed  Conduct extensive reconnaissance field visit, collection of data and information on socio-economic,
manufacturing sector’s activity, infrastructure especially road conditions and creating a Bench Mark (BM)
data bank to be used in future for evaluation purpose.
 Performed Cost-Benefit analysis determined IRR, NPV and BCR, prepared model financial projections.
 Preparation of financial projections of the subprojects including analyzing existing WATER TARIFF
STRUCTURES, costs, estimated operation expenses of water supply system, investment costs,
determined weighted average cost of capital, assessed minimum water requirements in the pourashavas to
update it, participated in public awareness campaign on water usages, and recommended a base
WATER TARIFF for the pourashavas to maintain commercial sustainability.
 Conducted union level and Paurashava level assessment of socio-economic conditions of the project area.
Analyzing collected data and information providing guidelines to make the project area economically
developed
Name of Assignment Special Assistance for Project Formation-II, Karnaphuli Water Treatment Project
Year Aug 2005 - Dec 2005
Location Chittagong, Bangladesh
Client CWASA, Chittagong
Main project features Study the prevailing water supply systems, problems in operating economically, administrative
loopholes, developing monitoring system for improved service delivery in future and formulation of Short Term
Action Plan (STAP)
Position held Monitoring & Evaluation Specialist
Activities performed  Preparing and monitoring the Short Term Action Plan (STAP), assist expatriate consultant for execution of
the STAP.
 Economic data analysis regarding the water usage and assessment of economic sustainability of
water supply
 Cost analysis of water supply system
 Conditions of ware house and inventories, improvements due to following STAP directions, shortcomings
etc. Analysing these reports, corrective measures were suggested to attain better results.
Name of Assignment Coastal Climate Resilient Infrastructure Project (CCRIP), funded by ADB
Year Feb 2014 to May 2015
Location 30 Upazilas in 12 Coastal Districts of Bangladesh
Client Local Government Engineering Department (LGED)
Main project features To support Government of Bangladesh (GOB) efforts to make climate resilient infrastructures including roads,
markets, cyclone shelters and also make people aware to withstand climatic adverse situations and thus survive
in extreme climatic situations and to build long-term preparedness through strengthened disaster risk
management.
Position held Deputy Team Leader /Economist
Activities performed  Was responsible to conduct the economic and financial analysis of the subprojects in order to justify
their economic and financial viability through determining the EIRR, NPV, BCR as per ADB
guidelines.
 Carried out economic assessment of WATER SUPPLY sub-projects,
 As the DTL, performed the tasks of organizing and compiling the reports of the team members, arranging
other administrative works as per need and thus assisted the Team Leader where needed.
Name of Assignment Coastal Embankment Improvement Project, Phase-I (CEIP, Ph-1), funded by World Bank
Year Oct 2015 - Dec 2015
Location Khulna, Barisal, Patuakhali, and Barguna- coastal districts of Bangladesh
Client BWDB
Main project features Repair and rehabilitation of the Coastal Embankments to protect people and property within the embankments
and help withstand natural calamities, cyclones, flood through upgrading these embankments incorporating
climate resilient features in the improved design of the embankments.
Position held Team Leader/Economist
Activities performed Conducted detailed economic analysis, prepared Resettlement Action Plan (RAP), Land Acquisition Plan
(LAP), and arrange payments to the PAPs, ensuring safe guard aspects during the project implementation period
as per WB Guidelines.
Name of Assignment Dhaka Elevated Expressway Project (DEEP)
Year Jun 2015 - Sep 2015
Location Dhaka, Bangladesh
Client Bangladesh Railway
Main project features Formulation of Resettlement Action Plan (RAP) for the APs of Dhaka Elevated Expressway Project (DEEP) which
would be implemented in order to reduce the traffic jam of the capital city Dhaka.

TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 4


“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”
Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

Position held Economist/Resettlement Expert


Activities performed Preparation of RAP report based on data and information collected through CMs/FGDs and socio-economic
survey conducted along the route alignment of the proposed DEEP and assisting team members in any other
areas when needed.
Name of Assignment Emergency 2007 Cyclone Recovery and Restoration Project (ECRRP)
Year Jun 2012 to Jan 2014
Location 75 Upazilas in 13 Districts (Sidr/Aila affected) of Bangladesh
Client Planning Commission, Ministry of Planning
Main project features To support Government of Bangladesh (GOB) efforts to facilitate recovery from the damage to livelihoods and
infrastructure caused by Cyclone Sidr and to build long-term preparedness through strengthened disaster risk
management.
Position held Economist / Financial Analyst
Activities performed As an Economist provided support to PCMU in undertaking oversight M &E activities, and in providing continuous
feedback to the Government, PSC, and implementing agencies on Project Performance and impact of its various
components. Moreover, responsible for conduction of economic and financial analysis to justify feasibility
through determining EIRR, FIRR, ENPV, FNPV, EBCR & FBCR etc. of the beneficiary agricultural/fishery
farm houses under the project and co-operating Team Leader when necessary.
Name of Assignment Municipal Services Project (MSP) Module-B
Year Mar 2012 to Jun 2012
Location Different places of Bangladesh
Client Local Government Engineering Department
Main project features Preparation of Municipal Development Programmes for different types of urban situations in a sample of about 30
municipalities and also preparing specific packages of development sub-projects
Position held Economist/Financial Analyst
Activities performed Analyze economic profile of the city and its development for the period 2001-2010 and project alternative
scenarios of development. Moreover, conduction of economic and financial analysis of the sub-projects of
the selected Pourashavas/city corporations and determination of EIRR, NPV, BCR applying Cost-Benefit Analysis
(CBA) method and preparation of financial projections of the subprojects including Water Supply projects.
Moreover, co-operating the Team Leader when necessary.
Name of Assignment Preparation of Rangpur Master Plan for Rangpur Divisional Town Under District Towns Infrastructure
Development Project (DTIDP)
Year Dec 2011 - Mar 2012
Location Rangpur Town, Bangladesh
Client Local Government Engineering Department
Main project features Preparation of Structure Plan, Master Plan and Detailed area Plan for Rangpur Divisional Town
Position held Urban Development Economist
Activities performed Overall supervision of the Bench Mark (BM) surveys on Socio-economic aspect of the project area viz.
Household Survey, Slum Survey, Informal Economy Survey, Industrial Survey including formulation of survey
tools, providing guidelines, recruiting and training enumerators, conduction of Cost-Benefit Analysis (CBA),
preparation of economic and financial projections Water Supply projects, conduct public consultation
meetings at union levels, analysis of the field surveys and financial and economic reports etc.
Name of Assignment Municipal Services Project (MSP) financed by IDA, World Bank
Year Oct 2011 - Nov 2011
Location Different Municipalities of Bangladesh
Client Local Government Engineering Department
Main project features Framework development for selecting, designing, and implementing priority interventions for municipal
development
Position held Economic/Financial Analyst
Activities performed Evaluating the methodology by which the Pourashavas determine the economic and financial feasibility of the
projects including financial aspects like budgeting, preparation of financial projections of subprojects water
supply projects etc Moreover, co-operating the Team Leader in formulating the development framework and
doing Cost-Benefit analysis of projects when necessary
Name of Assignment Water Management Improvement Project (WMIP), BWDB, Bangladesh
Year Dec 2010 - Jun 2011
Location Bangladesh
Client Bangladesh Water Development Board
Main project features The project consists of three components: (i) System Improvement and Management Transfer (SIMT); (ii) O&M
Performance Improvement; and (iii) Institutional Improvement of BWDB, WARPO and PCU in Program Co-
ordination and Monitoring. Component (i) would support in batches for rehabilitation and improvement (R&I) of
about 81 existing medium (average area 2500 ha) and 21 large (average area 8400 ha) FCD and FCDI schemes;
component (ii) would support measures to improve the culture of the overall planning and execution of the O&M
cycle under BWDB; and the component (iii) would support the institutional improvement of BWDB and WARPO
Position held Economist

TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 5


“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”
Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

Activities performed Conducted all of Socio-Economic Field Survey, PRA, forming WMO groups, organizing meetings with project
beneficiaries, providing training on improvement water management system, organizing meetings with project
beneficiaries, doing economic analysis of subprojects to determine EIRR, NPV and BCR to justify the
economic feasibility of them, writing report. Etc
Name of Assignment Preparation of the Structure Plan, Master Plan and Detailed area Plan for the Extension of the Khulna
Master Plan area up to Mongla Town
Year Mar 2008 - Nov 2010
Location Khulna, Bangladesh
Client Khulna Development Authority (KDA)
Main project features Field surveys including socio-economic survey, informal economic activities survey, traffic survey and other
surveys; analysis of the previous five Financial Years’ (FY) budgets of KDA, Mongla Port Paurashava and
nineteen union parishads; preparation of the Structure Plan, Master Plan and Detailed area Plan for the project
area.
Position held Urban Development Economist/ Financial Analyst
Activities performed Overall supervision of the Bench Mark (BM) surveys on Socio-economic aspect of the project area viz.
Household Survey, Slum Survey, Economy Survey, Industrial Survey including formulation of survey tools, and
conduction of Cost-Benefit Analysis (CBA) of different farms and industrial units/establishments (SMEs) to
determine their IRR, NPV and BCR to examine economic and financial viability, conduct public consultation
meetings at union levels, analysis of the field surveys and financial and economic reports etc.
Name of Assignment Preparation of the Structure Plan, Master Plan and Detailed area Plan for Barisal Divisional Town
Year Dec 2007 - Feb 2008
Location Barisal, Bangladesh
Client Urban Development Directorate (UDD)
Main project features Surveys including socio-economic survey, survey on informal economic activities, traffic survey and other
surveys; analysis of the previous five Financial Years’ (FY) budgets of Barisal City Corporation (BCC), and
preparation of the Structure Plan, Master Plan and Detailed area Plan BCC.
Position held Urban Development Economist
Activities performed Overall supervision of the Bench Mark (BM) surveys on Socio-economic aspect of the project area viz.
Household Survey, Slum Survey, Economy Survey, Industrial Survey including formulation of survey tools,
conduction of Cost-Benefit Analysis (CBA) of different farms and industrial units/establishments (SMEs),
preparation of financial projections, finding out problems faced by the GCMs and suggesting remedial
measures, finding out problems and prospects in manufacturing sector and showing remedial steps, analysis of
the field surveys, financial and economic reports
Name of Assignment Dhaka-Chittagong Expressway (PPP) RHD, (1st phase),& (2 nd Phase) Bangladesh
Year Apr 2007 - Aug 2007& Nov to Dec 2007
Location Dhaka, Bangladesh
Client Roads and Highways Department (RHD) Funded by ADB
Main project features Feasibility Study of the proposed Dhaka-Chittagong Access Control Expressway, economic analysis, financial
analysis, and formulation of detailed design of the best alternative based on various field level surveys.
Position held Transport Economist
Activities performed Conduction of field surveys on Traffic and other areas of surveys elated to RUC, RAC, Accident Costs, prevailing
socio-economic conditions in the zone of influence of the proposed highway, determining AADT, VOC, TTC,
and creating a Bench Mark (BM) data base , compiling and analysis of survey data and doing economic
analysis to find out EIRR, FIRR, NPV and B/C ratio to justify the economic and financial feasibility of the project.
Name of Assignment Assessment of Procurement Management Capacity and its Institutionalization
Year Dec 2006 - Feb 2007
Location Dhaka, Bangladesh
Client World Bank, Dhaka Office
Main project features Assessment of Procurement Management Capacity and its Institutionalization of various government
departments, divisions and organizations of GOB. Improvement of overall management system and upgrade
present institutional system.
Position held Statistician cum Project Co-coordinator
Activities performed Preparation of part of technical proposal, survey tools, recruitment and training of field researchers, co-
ordination of total survey works, organizing and conducting workshops, generation of tables for analytical
purpose, writing analytical part of the report etc.
Name of Assignment District Water Resources Assessment (DWRA)
Year May 2004 - Apr 2005
Location Different places of Bangladesh
Client Local Government Engineering Department, funded by Asian Development Bank
Main project features Water resources and formulating District Water Resources Assessment (DWRA)
Position held Socio-economist
Activities performed Formulation of field survey questionnaire, supervision of field survey to collect socio-economic BM (Bench
Mark) data from the project Upazilas, analysis of data to assess benefit accrued through implementation of past
water development projects, contribution to formulate water resources development project plan based on Benefit
Monitoring Effects (BME), interaction with LGED and BWD officials, local NGO representatives, and local
TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 6
“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”
Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

people’s including different stakeholders of the project; finalized for approval of the DWRA Report
Name of Assignment Greater Faridpur Rural Infrastructure Development Project (D&S Consultancy Services)
Year Aug 2002 - Apr 2004
Location Greater Faridpur, Bangladesh
Client Local Government Engineering Department, funded byJapan Bank for International Co-operation (JBIC)
Main project features Road, bridges, culverts, growth centers, etc.
Position held Socio-Economist
Activities performed Organizing and supervising the task of collecting and analyzing data on Socio-economic characteristic
including demography, employment, production, income and expenditure, livelihood pattern, health and
education, etc. to be used for monitoring and evaluation during implementation of development projects. Also
responsible for organizing Labour Contracting Society (LCS) and providing Income Generating Training (IGA) to
them. Responsible for conducting field surveys on Traffic volume related to (a) Road traffic; AADTs, Modal shift,
VOCs & TTCs, Per Pkm/Tkm cost etc. (b) Market data; market visitors, turnover, auction and realize toll amount,
spoilage & saving etc. Determining EIRR, FIRR, NPV and B/C ratio of the roads constructed in the project
area.
Name of Assignment Infrastructure Development Project, Greater Sylhet District
Year Jul 2000 - Dec 2000
Location Greater Sylhet, Dhaka, Bangladesh
Client Local Government Engineering Department
Main project features Construction of Feeder Roads with a view to promote socio-economic development of the project districts.
Position held Economist
Activities performed Responsible for organizing and supervising the socio-economic field survey, traffic survey, commodity
transaction survey. Also supervised the task of collection of information related to economic sectors that have
direct/indirect influence of the development of infra-structure including Markets and Growth Centers. On the basis
of BM data, assessed and evaluated the benefit accrued in overall socio-economic sector in the project
area due to implementation of the Rural Infrastructure Projects. The economic and financial evaluation of the
project was submitted through determining EIRR, FIRR, B/C, NPV of the Feeder Roads under five Upazilas of
Greater Sylhet district.
Name of Assignment Pushkin Urban Development Project, Russia
Year Mar 1995 - Feb 1997
Location Russia
Client Pushkin Municipality
Main project features Reconstruction and rehabilitation of damaged roads in the municipality.
Position held Asstt. Economist
Activities performed Assisted Sr. Economist in rendering services to carryout traffic survey, market survey, (a) Road traffic; AADTs,
Traffic volume, Modal shift, VOCs & TTCs, Per Pkm/Tkm cost etc. (b) Market transaction study in the proposed
trading/market centers; market visitors, turnover, auction and realize toll amount, spoilage saving etc. Socio-
economic surveys, processing of data; forecasting of traffic generation and economic activities . Also
worked in collaboration with Sr. economist in Cost analysis, investment program, Economic and financial analysis
and carried out B/C ratio; NPV, EIRR, FIRR with sensitivity analysis, cash flow, etc.
Name of Assignment Krasnador Urban Development Project, Russia
Year Apr 1994 - Feb 1995
Location Russia
Client Krasnador Municipality
Main project features Repairing and reconstruction of municipality roads
Position held Asstt. Economist
Activities performed Assisted Sr. Economist in conducting Socio-Economic Survey in the project area; Traffic Survey on the project
roads and conducted surveys in the markets located in the project area covering transaction of goods in these
Trading Centers/Markets. Also, assisted in determining economic and financial viability of the project
through estimation of FIRR, EIRR, NPV and B/C of the project.
Expert’s contact information: (Email: hrindia@eptisa.com; Mobile No: +91-124-4696716)
Certification:
I, the undersigned, certify to the best of my knowledge and belief that
(i) This CV correctly describes my qualifications and experience
(ii) I amnot a current employee of the Executing or the Implementing Agency
(iii) In the absence of medical incapacity, I will undertake this assignment for the duration and in terms of the inputs specified for me in Form
TECH 6 provided team mobilizationtakes place within the validity of this proposal.
(iv) I was not part of the team who wrote the terms of reference for this consulting services assignment
(v) I am not currently debarred by a multilateral development bank
(vii) I, as the authorized representative of the firm submitting this Proposal for the “Capacity Building for Sustainability (CBS)
Consultants (Package No. DWSNIP/CBS/03.3)”, certify that I have obtained the consent of the named expert to submit his/her CV, and
that s/he will be available to carry out the assignment in accordance with the implementation arrangements and schedule set out in the
Proposal, and confirm his/her compliance with paras (i) to (v) above.

I understand that any willful misstatement described herein may lead to my disqualification or dismissal, if engaged.
TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 7
“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”
Kanai Deb Nath Form TECH-6: Curriculum Vitae (CV ) Tariff Expert / Economist

Date: 17.01.2018
[Signature of expert or authorized representative of the firm]
Day/Month/Year
Full name of authorized representative: ____ José Ignacio Soriano Artacho _____________________________________________

TECHNICAL PROPOSAL – EPTISA/ KPMG/ NRW 8


“CAPACITY BUILDING FOR SUSTAINABILITY (CBS) CONSULTANTS”

Você também pode gostar