Escolar Documentos
Profissional Documentos
Cultura Documentos
: 4740011 00 T-969 04
ITP No: 610 Rev.: 1
Date: 27 Nov. 2014
POWER AND CONTROL CABLE INSTALLATION Page 1 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011 E-073 70-5
MAIN ACTIVITY NAME: POWER AND CONTROL CABLE INSTALLATION EQUIPMENT NO: 56BBT UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Enka Teknik QC. Client/ Rep. Reference No.:
Cable route ready for cable H/R H/R
610-1.0 By checking completion of trays enough for cable pulling.
installation
Verify no undue mechanical stress is applied to cable during S S
installation.
Verify cable manufacturer’s criteria for max. Tension on
Correct cable type and size cables during pulling, no kinking.
Manufacturer's
610-2.0 which is free from damage Verify correct segregation/layering of cables.
Instructions
installed, as per requirement. Verify correct cable ID.
Verify correct splicing as per spec.
Verify min. bending radius of cable as per cable
manufacturer.
S S
Cable glanding/termination Verify terminating materials are of specified type. Manufacturer's
610-3.0
complete. Verify cable connection tight and secure. Instructions
610-6.0 Cable installation complete. Verify all inspection and tests complete and conformant. H H W
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 01
ITP No: 601 Rev.: 0
Date: 28 August. 2013
CABLE TRAY AND COVERS INSTALLATION Page 2 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011 E-082 59-1
MAIN ACTIVITY NAME: CABLE TRAY AND COVERS INSTALLATION AT STEP-UP EQUIPMENT NO: CABLE TRAY( STEP-UP 55) UNIQUE ID:
TRANSFORMER
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Enka Teknik QC. Client/ Rep. Reference No.:
Verify ITP-302 for primary structural steel complete. H/R H/R
Verify ITP-303 for secondary structural steel complete. ITP-302
Structural steel ready for
601-1.0 Verify ITP-250 complete for grouting of supports, if ITP-303
installation of cable trays.
applicable. ITP-250
Release for cable tray installation.
Manufacturer’s S S
601-2.0 Supports installed. Verify cable tray supports installed as per drawings/specs.
Instructions
Clamps, fittings, connectors, S S
hanger clamps, expansion
Verify anchor points located as per drawings, if applicable. Manufacturer’s
601-3.0 guides, installed as required.
Verify clamps, screws, fasteners correctly installed/tight. Instructions
See NOTE under item 601-4.0.
Cable trays, cable tray fittings, Verify clear from heat sources W W
dividers, barriers, isolators, etc.
Verify no damage
installed as required.
Verify sharp edges removed
Manufacturer’s
601-4.0 Verify dead end trays provided with tray end caps, if
NOTE: Connecting metal surfaces cleaned from Instructions
applicable
oil, dirt, oxidation, abraded once with emery
Verify galvanizing repairs made to areas which will be
paper and Corrosion inhibitor applied
Immediately prior to connection. inaccessible after installation
Verify touch up of galvanizing performed, if required H W
Manufacturer’s
601-5.0 Trays installation. All inspection complete and conformant.
Instructions
Release for cable pulling.
Cable tray installation complete By checking the completion for all cables/wires for the tray. H W
601-6.0 and all cables for the tray Release for installation of covers and fire-proofing of cable Drawings
pulled, terminated and tested. trays.
Verify correct material, type etc. S W W
Cable tray covers installation Manufacturers
601-7.0 Verify cable tray covers are undamaged, tight and secure.
complete. Instructions
Verify cover banding correct type, tight and secure.
H H W
601-8.0 Installation of covers complete. All inspection for covers complete and conformant.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 02
Rev.: 0
ITP No: 602 Date: 17 Dec 2013
COVERS, FIREPROTECTION, ETC. FOR CABLE TRAYS Page 3 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
S S
Verify correct grade, type of material
Cable tray fireprotection Manufacturers
602-3.0 Verify visual inspection.
installation complete. Instructions
.
S S
Permanent signs installation Verify signs such as tray system voltage class, tray number Manufacturers
602-4.0
complete. and safety signs as applicable. Instructions
W W
Verify grounding connections complete as per vendor
Grounding connections from
data/specification requirements. Manufacturers
602-5.0 tray to structural steel
Verify continuity checks performed and conformant, between Instructions
complete.
cable tray and structural steel.
H H W
Installation of covers, All inspection and tests complete and conformant.
602-6.0
fireprotection complete. Cable tray covers, fireprotection released..
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 03
Rev.: 0
ITP No: 603 Date: 26 August. 2013
CONDUIT INSTALLATION Page 4 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
To check the structural steel ready for conduit installation. H/R H/R
Structural steel, trenches ready
603-1.0 Verify co-ordinates, depth of underground conduits as per
for conduit installation.
drawing.
Verify conduit supported within maximum specified intervals S S
Vendor data.
603-2.0 Supports installed, as required. (if applicable).
Drawings
Verify correct size, type of material used.
Verify cleaned from dirt, cuttings and foreign material prior to S S
Rigid conduits and conduit installation
fittings as required. Verify conduits in parallel have a minimum equip. distance as
specified in the drawings.
603-3.0 Verify no welding of conduits Vendor data
NOTE: Conduit shall be
Verify threads coated with approved coating
installed neatly,
Straight and plumb and in the Verify conduit body openings are sealed against the water
correct location. leakage.
Verify space factor conformity, correct size of conduit, etc.
S S
603-4.0 Boxes installed, as required. Verify boxes supported independently from conduits. Vendor data
H H W
603-7.0 Conduit installation complete. Verify all inspection complete and conformant.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 05
Rev.: 0
ITP No: 620 Date: 28 August. 2013
POWER CIRCUIT INSTALLATION Page 5 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
Power circuit ready for cable Verify installation of conduits complete. H/R H/R
620-1.0 pulling and socket outlets Verify installation of junction boxes completed. Drawings
installation. Release for power circuit installation.
Verify sockets outlets and junction boxes enclosures suitable S S
Installation of socket outlets for the area. Manufacturer’s
620-2.0
and junction boxes complete. Verify mounting and location of socket outlets correct as per Instructions
installation drawings.
Verify continuity and insulation tests complete for service W W See table below
socket stations. for continuity and
Manufacturer’s
620-3.0 Cables installed. Verify terminations checked. insulation
Instructions
Verify loose connection checked. resistance
checks
Power circuit installation All inspection and tests complete and conformant. H H W
620-4.0
complete. Power circuit released.
TEST EQUIPMENT Insulation Resistance in Mohms
Continuity Sub-Contractor/Enka Teknik Sub-Contractor/Enka Teknik
TYPE Cable No
L1-L2 L1-L3 L1L2L3-N L1L2L3N-E Check Construction Signature & Date QC Signature and Date
AND SERIAL NO.:
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 06
Rev.: 0
ITP No: 621 Date: 28 August. 2013
POWER BOARD INSTALLATION Page 6 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
By checking the foundation and/or structural completions H/R H/R
enough for power board installation.
Structural steel, building,
Release for power board installation. ITP-222
621-1.0 foundation ready for power
ITP-302
board installation.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
Doc. No.: 4740011 00 T-969 07
STANDARD INSPECTION AND TEST PLAN Rev.: 0
ITP No: 622 Date: 28 August. 2013
Page 7 of 23
LIGHTING CIRCUIT INSTALLATION
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
H/R H/R
Concrete slabs ready for
Drawings
lighting pole installation. By checking completion of concrete slabs and/or structural
ITP-224 or
622-1.0 Structural steel ready for steel installations are enough for lighting installation.
ITP-231, ITP-
supports and lighting fixture Release for lighting circuit installation. 302 or ITP-303
installation.
Verify as per applicable lighting drawings. S S
Verify correct location of switches.
Lighting layout
Lighting supports, lighting Verify correct support and fixtures installation.
drawings
622-2.0 poles, lighting fixtures, cable Verify correct orientation and alignment.
Manufacturer’s
etc. installed. Verify lamps installed in all fixtures. Instructions.
Verify check lights and light switches for proper operation.
Verify check photo cells for proper operation
W W
Manufacturer’s
Cable installation and Verify termination and installation meets specification
622-3.0 Instructions
termination complete requirement.
ITP-610
H H W
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 08
Rev.: 0
ITP No: 631 Date: 23 August. 2013
AREA GROUNDING NETWORK INSTALLATION Page 8 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
The below ground grounding Verify installation at correct depth and location as per W W
Manufacturer’s
631-1.0 cable for the area installed, as drawings.
Instructions
per requirement. Verify correct type and size of grounding wire.
Verify correct type and size of splice used. W W
Splicing of below grade cable Manufacturer’s
631-2.0 Verify compression type splices wrapped with insulating tape
complete. Instructions
and sealant applied, as applicable.
Verify grounding cable placed as per drawings. W W
Area grounding cable network
631-3.0 Verify cable backfilled/compacted, except for future Drawings
complete.
connections to equipment, structural steel etc.
Verify location and depth as per drawing. W W
Manufacturer's
Grounding rod installed as per Verify correct type and size of grounding rods.
631-4.0 Instructions
requirement. Verify no damage to ground rod.
Drawings
Verify cable connections undamaged and tight.
Verify complete for installation of grounding rods as W/R W/R See table below
applicable. for resistance of
Area connected to grounding rod Verify adjacent area grounding system complete if there are grounding
directly or via grounding network. no grounding rods in this grounding network area. network to earth.
Manufacturers
631-5.0 Network connection to grounding Verify connections to grounding rods tight.
data sheets
rod complete as per requirement, Verify continuity to grounding rods/other grounding systems
if applicable. acceptable.
Verify three different resistances to earth measurements
meet specification requirements.
Verify all inspection and tests complete and conformant. H H W
Area grounding network
631-6.0 Release for equipment, structural steel grounding
complete.
connections, as applicable..
TEST EQUIPMENT TYPE Resistance Measurement for grounding Network to Earth Permissible ENKA TEKNIK ENKA TEKNIK
AND SERIAL NUMBER Test No.: R1 R2 R3 Ground Rod/Test Station No.: Value Construction Signature & Date QC Signature and Date
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 09
Rev.: 0
ITP No: 632 Date: 26 August. 2013
GROUNDING OF EQUIPMENT, STRUCTURE STEEL ECT. Page 9 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011 E-078 89-1
MAIN ACTIVITY NAME: Grounding Of Equipment, Structure Steel at Station Service EQUIPMENT NO: BBT02 UNIQUE ID:
Transformer
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Enka Teknik QC. Client/ Rep. Reference No.:
Verify grounding network complete. H/R H/R
Verify complete for structural steel items.
Equipment structural steel supports etc.
632-1.0 Released for grounding of equipment, structures etc. Drawings
ready for grounding connections.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Document No: 4 740011 00 T-969 11
Rev. No: 0
ITP No 634 Date: 03 Jan. 2014
INSTALLATION OF NEUTRAL EARTH RESISTORS Page 10 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: 740011 DRAWING NO: OTHER REFERENCES:
Insulation test and high voltage tests Verify insulation resistance test conformant. Manufacturer's
634-5.0 W W
complete, as applicable. Verify high voltage test conformant, as applicable. Instructions
Installation of neutral earth resistor All inspection and test complete and conformant.
634-6.0 H H W
complete. Neutral earth resistor released.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Document No: 4 740011 00 T-969 11
Rev. No: 0
ITP No 634 Date: 03 Jan. 2014
INSTALLATION OF NEUTRAL EARTH RESISTORS Page 11 of 23
Test
Insulation
Equipme High Voltage Pressure Test Sub-Contractor/Contractor Sub-Contractor/Contractor
Resistance
nt
Type and Test
Desired Measured Applied Voltage Leakage Current in Construction Signature &
Serial Voltage in % QC Signature and Date
Resistance Resistance in kVolts mApms Date
Number kVolts
30%
60%
90%
100
%-
1MIN
.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 12
Rev.: 0
ITP No: 635 Date: 28 August. 2013
LIGHTNING PROTECTION SYSTEM INSTALLATION Page 12 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
Structure, building, equipment By checking condition of structure, building and/ or H/R H/R
635-1.0 ready for lightning protection equipment enough for installation of the lightning system.
system installation. Release for lightning protection system installation.
Manufacturer’s W W
Verify air terminals installed as per drawings/specifications
635-2.0 Air terminals installed correctly. Instructions
and manufacturer’s instructions.
Drawings
Verify correct materials W W
Earth tapes and conductors Manufacturer’s
635-3.0 Verify tapes and conductors securely fixed.
installed correctly Instructions.
Verify specified type and size of rods installed.
Installation W W
Test clamp and disconnect drawings
635-4.0 Verify test clamps and disconnect facilities installed correctly.
facilities installed. Manufacturer’s
Instructions
Lightning protection system Installation W/R W/R R See table below
connected to grounding rod drawings for resistance of
635-5.0 Verify connections to ground road/network as per spec.
directly or via grounding Manufacturer’s grounding
network. Instructions network to earth.
H H W
Installation of lightning All inspection complete and conformant.
635-6.0
protection system complete. Lightning protection system released.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 13
Rev.: 0
ITP No: 636 Date: 28 August. 2013
ELECTRICAL JUNCTION BOX INSTALLATION Page 13 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
H/R H/R
W W
H H W
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 14
Rev.: 0
ITP No: 640 Date: 17 Dec 2013
RECTIFIER INSTALLATION Page 14 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: DRAWING NO/BUILDING NO/ SHALTER NO ECT: OTHER REFERENCES:
740011
MAIN ACTIVITY NAME: EQUIPMENT NO: UNIQUE ID:
W W
Verify equipment undamaged.
Rectifier installed as per Verify orientation and alignment correct. Manufacturer’s
640-2.0
requirement. Verify name plate correct. Instructions
Verify rectifier bolted down securely.
W W
Junction box, including Verify orientation and alignment correct.
Manufacturer’s
640-3.0 supports installed as per Verify no damage to junction box
Instructions
requirement. Verify JB bolted down securely
W W
H H W
Rectifier/junction box Verify all inspection and tests complete and conformant.
640-5.0
installation complete. Rectifier release.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 15
Rev.: 1
ITP No: 641 Date: 04 Feb. 2015
INSTALLATION OF POWER TRANSFORMERS Page 15 of 23
PROJECT NAME: AL-NAJYBIA 4X125 MW GAS TURBINE POWER PLANT PROJECT PROJECT NO: 4740011 DRAWING NO ECT: E-096 32-1 OTHER REFERENCES:
MAIN ACTIVITY NAME: INSTALLATION OF POWER TRANSFORMER (STATION SERVICE EQUIPMENT NO: BBT 02 UNIQUE ID:
TRANSFORMER)
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Enka Teknik QC. Client/ Rep. Reference No.:
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Document No: 4740011 00 T-972 27 0
Rev. No: 0
ITP No: 642 Date: 27 March 2013
EMERGENCY DIESEL GENERATOR INSTALLATION Page 16 of 23
PROJECT NAME: NAJYBIA 4X125 MW TURBINE POWER PLANT PROJECT PROJECT NO: 4740011 DRAWING NO ECT: OTHER REFERENCES:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Reference No.:
H/R H/R
Verify initial setting of diesel generator
Diesel generator skid or generator
642-1.0 skid/generator. Vendor data.
ready for electrical installation.
Release for generator installation.
W W
642-2.0 Generator lubrication satisfactory Verify lubrication, as per vendor data. Vendor data.
W W W
W W
H H W
Verify all inspection and tests complete
Project
642-5.0 Generator installation complete. and conformant.
specifications
Generator released.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
FM-6421 Doc. No: 4740011 00 T-972 27
Rev. No: 0
EMERGENCY DIESEL GENERATOR Date: 27 March 2013
INSPECTION AND TEST RECORD Page 17 of 23
GENERATOR DATA
Sub-Contractor/
Sub-Contractor/
Enka Teknik
DESCRIPTION Enka Teknik QC
Construction
Signature And Date
Signature And Date
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No.: 4740011 00 T-969 17
Rev.: 0
ITP No:643 Date: 27 June. 2012
INSTALLATION OF MOTORS Page 18 of 23
PROJECT NAME: NAJYBIA 4x125 MW POWER PLANT PROJECT PROJECT NO: 740011 DRAWING NO ECT: OTHER REFERENCES:
W W W/R
Insulation resistance test of Verify insulation resistance test for 415 V motors and
643-4.0 Vendor data FM-6431
motor winding. below complete and conformant.
W W W/R
Insulation resistance test of Verify motors above 415 V insulation resistance test,
643-5.0 Vendor data FM-6432
motor, test performed. performed and conformant.
H H W
Motor installation complete All inspection and tests complete and conformant.
643-8.0
and conformant. Motor released.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
Doc. No.: 4740011 00 T-969 17
FM-6431 Rev.: 0
INSPECTION AND TEST RECORD Date: 27 June. 2012
FOR MOTORS Page 19 of 23
MEASUREMENT
TEMPERATURE HUMIDITY
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
FM-6432 Doc. No.: 4740011 00 T-969 17
Rev.: 0
MOTOR TEST RECORD Date: 27 June. 2012
(ABOVE 415 VOLTS) Page 20 of 23
TEST EQUIPMENT
TEST EQUIPMENT TEST CERTIFICATION No.
MEASUREMENT
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
STANDARD INSPECTION AND TEST PLAN Doc. No: 4 740011 00 T-969 18
Rev. : 0
ITP No: 644 Date: 10 Sep. 2012
MOTOR OPERATED VALVE (MOV) INSTALLATION Page 21 of 23
PROJECT NAME: AL-NAJYBIA 4X125 MW GAS TURBINE POWER PLANT PROJECT PROJECT NO: 740011 DRAWING NO/BUILDING NO/ ISO NO ECT: OTHER REFERENCES:
Activity Activity Inspection/Test Reference Inspection and Acceptance Initials/Stamp and Date Report
No. Description Requirements Document Sub-Contr. QC Enka Teknik QC. Client/ Rep. Ref No.:
By checking completion of piping H/R H/R
Piping ready for MOV installation
644-1.0 ITP-421
installation. Release for MOV installation.
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
FM-6441 Doc. No: 4 740011 00 T-969 18
Rev. : 0
MOTOR OPERATED VALVE Date: 10 Sep. 2012
(MOV) TEST RECORD Page 22 of 23
MEASURED RESISTANCE
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp
ENKA TEKNIK QC Date & Signature /Stamp Client Rep. Date & Signature/ Stamp