Proposed preliminary Activities by MoWT
1 Road condition assessment Road Surface condition

Use of land and local resources:


(Urban area/ agricultural land/commerce and
Social Environment condition:
industrial districts, /scenic sites/fishing
grounds, etc.

Landscape/ geological conditions: (steep slope


/ soft foundation / damp ground /faults, etc)
Natural Environment condition
Plants, animals and habitat:
(protected habitat / national park, etc)
2
Field Surveys and Investigations Hydrological Situation
(Drainage Structures) Structural condition To be assessed
Rehabilitation requirement To be assessed
Geological condition To be assessed
Measuring the approaches 200m either side of
the bridge;
Topographical surveys • Measuring the bridge structure; and
• Measuring the river 100m upstream and
downstream.