Inception meeting with district officials to discuss;
Terms of reference for the requested technical support Team to work with from District Proposed time frame Any other considerations from the district Proposed preliminary Activities by MoWT 1 Road condition assessment Road Surface condition
Use of land and local resources:
(Urban area/ agricultural land/commerce and Social Environment condition: industrial districts, /scenic sites/fishing grounds, etc.
Landscape/ geological conditions: (steep slope
/ soft foundation / damp ground /faults, etc) Natural Environment condition Plants, animals and habitat: (protected habitat / national park, etc) 2 Field Surveys and Investigations Hydrological Situation (Drainage Structures) Structural condition To be assessed Rehabilitation requirement To be assessed Geological condition To be assessed Measuring the approaches 200m either side of the bridge; Topographical surveys • Measuring the bridge structure; and • Measuring the river 100m upstream and downstream.