Você está na página 1de 20
GODOWN STRUCTURAL DRAWINGS ISSUED FOR CONSTRUCTION 12/01/2019 ef GRESTONE CONSULTANT G ADDRESS: TF ate Cente, ‘hore PHONE: WEB SITE: GREYSTONE LIST OF DRAWINGS ‘SNO._[ DRAWING TILE DRG.NO 1_ [List oF DRAWINGS [0 | 2_ | ESTIMATION SCHEDULE S01 3_| WALL LAYOUTPLAN 02 4 _ | ExcavATIONLAYOUTPLAN $03 3 _| EXCAVATION LAYOUT SECTION S08 @_| MASTER PLAN OF FOOTING $05 7__ | BASEMENT FOOTING LAYOUT PLAN $08 &_ | SOgLAYOUTPLAN S07 3 | GROUND FLOOR FOOTING LAYOUT PLAN 5.08 10_| FOOTING DETALS S08 “11__| BASEMENT SLA8 BOTTOM REINFORCEMENT $40 12_| BASEMENT SLAB TOP REINFORCEMENT st 13 _| GROUND FLOOR WALL & BEAM LAYOUT PLAN S12 14 | GROUND FLOOR SLAB BOTTOM REINFORCEMENT 813 18 _| GROUND FLOOR SLAB TOP REINFORCEMENT sa 16 _| FIRST FLOOR WALL & BEAM LAYOUT PLAN S45 17 _| FIRST FLOOR SLAB BOTTOM REINFORCEMENT 38 18 _| FIRST FLOOR SLAB TOP REINFORCEMENT sa7 19._| BEAM ELEVATION & SECTIONS 38 c EXCAVATION FIRST FLOOR Ere GL Below Ta ‘ ee | 3H Eoin FLL —| mara Bc ener [1 ba Teal oath. ota (8 Sand Se0-eh [Garant [15 Boge SLAB Petts) [ane —[15 ak maa ta PRagregate [180 ct, ‘CONCRETE Sand “40_eft. FOOTIN era — [a0 Ee STEEL cconerere sana aT (oa Fase aca cy RETAINING WALL ‘GROUND FLOOR Zl wenn [oat —[ 7 Bag THBAARL, Pedan] Fe ccononere Spa Te Roa 500 ae [Rawat [1056 ot tac Mic (1) feener_} fans ‘STEEL ws [ave Rafer Roaring Wal [THE Tos SLAB [conan] 16 Bag CONCRETE sind —[940-e feush [se STEEL BASEMENT aT SB oa aa - ics | 208 ‘sopown mm bea Sent 1 So ‘SUMMARY Sane SLAB Excavation, 70400 ch. ESTIMATION SCHEDULE [earant [56 Baas Cant Rage CconererE fans [a0 a = 8 as ease fous —[ 280-et = ‘STEEL RabroaA Rar eaRenTA TE Ts Teas Bice {ALL QUANTITIES ARE APPROXIMATE. 2. QUANTITY OF SOG IS NOT INCLUDED. es 6 [ISSUED FOR CONSTRUCTION] 3.) [t=

Você também pode gostar