AND MECHANISMS
Page 1
“Pagkain ni Boss”
Integrated Community Food
Production (ICFP)
• Pursuant to the provisions stated in
Section 6.2.8 of the DBM-DILG-DSWD-
NAPC Joint Memorandum Circular No. 4
dated November 26, 2013 for Grassroots
Participatory Budgeting 2015
Page 2
PHASES OF THE ICFP PROJECT
1. Pre-Project Implementation
• Completion and submission of
documentary requirements
Page 4
3. Post- Project Implementation
Page 5
Mechanisms
(As stated in the Menu of Programs
Page 6
• Specific location of households and basis
of selecting such cluster of households
should be indicated in the project brief.
Page 7
ICFP FUND COSTING PER HOUSEHOLD
/ FAMILY BENEFICIARY
Page 8
Breakdown of the P2,000,000.00
Line Item % Amount
1. Community Organizing / 30% 600,000.00
Capability Building (Including
Honorarium of Barefoot
Technicians)
TOTAL 2,000,000.00
Page 9
Working Arrangement with Inter-Agency
(Work Complementation and Supplementation)
Agency Specific Hunger Mitigation Areas of Complementation and
Programs Supplementation
Can serve as market of surplus
Supplementary Feeding produce vegetables and livestock
Program (chicken) in their hot meals for
children
Sustainable Livelihood Funds to support marketing activities
DWSD Program (SLP) of surplus foods produced
Early Warning System on Benchmarking of food-poor
Food Insecurity constituents at the local level
Pantawid Pamilya Pilipino Ensuring of nutrition module in the
Program (4 Ps) Family Development Sessions
Page 11
FUNDING & PROCUREMENT
• DBM will be responsible in the downloading
of funds DIRECT to the LGUs
Upon submission of
1st Tranche requirements and the 90%
inception report
10%
Upon submission of the
2nd Tranche (Retention
Project Terminal Report
Fund)
Page 14
REPORTS
Page 15
THANK YOU!