Você está na página 1de 4

SMDF/F.

03/A/00

TABUK PROJECT 2181114000-MNT


1. HFC-227EA SYSTEM (ROOM #1 - VOLUME: 1,226.16 CU. MTR.|ROOM
REV : 0 26-Nov-2018
VOID)
No. Description Uom QTY Unit Price Total Price

HFC-227ea FILLED Container Assembly 1000Lbs(405L) Impulse


Valve Type c/w Pressure Gauge,Victaulic Coupling w/ Nipple
1 Pieces 2.00 27,198.00 54,396.00
and Mounting Strap or Bracket Suitable to Fill 598Lbs (271.5kg)
to1045Lbs(474kg), UL/FM
HFC227ea (Heptafluropropane) Gas, UL Listed and FM
2 Kilogram 705.00 210.00 148,050.00
Approved, Packed in 1000Kg Steel Drums
Impulse Valve Operator Kit (IVO KIT) c/w IRM, Wire Lead and
3 Pieces 2.00 1,932.00 3,864.00
Reset Tool, UL Listed/FM Approved,
Low Pressure Switch (LPS), M10 x 1-6G Connection, Alum.
4 Pieces 2.00 623.00 1,246.00
Body, UL/FM Approved,
Discharge Pressure Switch (DPS), 1/4" NPT Connection, Alum.
5 Pieces 1.00 792.00 792.00
Body, UL/FM Approved,
6 HFC-227 Discharge Nozzle, Brass Pieces 12.00 550.00 6,600.00
7 HFC-227 System Check Valve 3", UL/FM Approved Pieces 2.00 3,307.00 6,614.00
8 Manifold For 2 X 1000 Lbs Container Assembly Pieces 1.00 1,800.00 1,800.00
9 Conventional Extinguishing Control Panel 230V, Red Pieces 1.00 4,960.00 4,960.00
10 IVO Interface/Solenoid Expand Module, 24 Volt Inverse Type Pieces 1.00 150.00 150.00

11 Battery Lead Sealed For Control Panel Pieces 2.00 200.00 400.00
12 Conventional Photoelectric Smoke Detector Pieces 22.00 70.00 1,540.00
13 Standard Mounting Base Pieces 22.00 15.00 330.00
14 Manual Release Station, Key Reset type, 24 VDC, Red Colour Pieces 1.00 639.00 639.00

15 Extinguishing Abort Switch, Surface Mount, Red Pieces 1.00 455.00 455.00
16 Back Box, Metal Painted RED Pieces 1.00 36.00 36.00
Fire Alarm Bell 6", Motor Driven Type, Red Colour, 24V DC, 20-
17 Each 2.00 138.00 276.00
30mA Current Consumption
Horn/Strobe 12/24V DC Red, SpectrAlert Advance, 2 Wire, 15,
18 Pieces 2.00 330.00 660.00
15/75, 30, 75, 110 Candela, Wall Mounted w/o Back Box

Strobe 12/24V DC, Red, SpectrAlert Advance, 2 Wire,15, 15/75,


19 Pieces 1.00 235.00 235.00
30, 75, 110 Candela, Setting
PVC Back Box for Fire Alarm Bell, Sheild & Horn/Strobe , Red
20 Pieces 5.00 33.00 165.00
Colour
21 Warning Sign for HFC-227ea System Pieces 1.00 105.00 105.00
22 ENGINEERING Lot 1.00 1,000.00 1,000.00
23 TESTING & COMMISSIONING Lot 1.00 3,200.00 3,200.00
24 INSTALLATION (INCLUDING CONSUMABLES, PIPES & FITTINGS) LOT 1.00 43,840.00 43,840.00
TOTAL PRICE FOR THE ABOVE (IN SAR): 281,353.00

Page 1 of 1
PROJECT: TABUK PROJECT
Technical Notes and Comments:
Offer is strictly based on BOQ.

Our offer is for Supply, Installation, Testing & Commissioning of HFC-227ea System Only.

We have considered Estimation only for the Dimensions mentioned in the BOQ. If any
additional requirements require during detailed engineering, our offer shall be subjected
to revision and it will be charged extra.

Incoming power supply to the panel along with necessary isolator / MCB and proper earthing
shall be provided by Main contractor.

No Specifications, Riser Diagrams, Setting Out Plans were furnished along with the Mail
details. If any variation comes in future it will be charged extra.

Pipes & Fittings:-


Black Steel ERW pipe as per ASTM A53 Gr- B Sch 40.
Size up to 2” - threaded fittings
Size 2-1/2” Dia and above - grooved fittings

Fire Rated Cables:-


2C X 1.5 sq.mm

Exclusions:
1. All civil works and Fire stop materials required for closing of openings any type of spares,
pipe sleeves for wall crossings, man lift & cranes during execution.
2. Charges for Civil Defense Approval / Any Legal Department & Scaffolding more than 4
meters.
3. Mastic sealant/ Damp proof course for all chambers (where pipe crossing the wall) to be
provided by MEP contractor.
4. Reserve Cylinder, Annunciator Panel, Gas Discharge Test & any type of Spare parts or
extra materials.
5. Pressure Relief Room / Room Venting System, Fire Stop Materials required for closing of
openings.
6. Drop Curtains, Motor Operated Dampers, Door Holders and any other Shutdowns required.
7. Design, Supply, Installation & testing Commissioning for seismic protection. If the same is
required, our offer shall be subjected to be revision and will be charged as extra.

Observations:
1. If any additional material / equipments required during detailed engineering / execution as
per the requirement of Civil Defense / site condition will be charged extra.
2. We have considered 7% concentration & 24.8 bar pressure HFC-227ea System.
3. We have proposed Conventional Fire Suppression Panel for HFC-227ea System.
4. If additional test is required the same shall be charged extra.
5. Gas cylinders location inside the area to be protected, subject to civil defense approval.
6. Assumed all the room enclosure and cylinder storage area temperature are maintained at
21ºC.If any changes our offer shall be subject to revision.
7. All termination work related to General Fire alarm, BMS, HVAC and Electrical system
etc., are not part of our scope of work.
8. We have proposed our standard product for HFC-227ea System only.

We considered HFC-227ea system as per the following given Room dimensions. In future, if
any rooms to be added extra then our offer shall be subjected to be revision and will be charged
extra.

CAPACITY
ROOM PROVIDED NO.OF
S.NO VOID DETAILS
DESCRIPTION AREA, HEIGHT, ROOMS
M² M
1 ROOM NO. 1 476 2.66 1 ROOM VOID

Você também pode gostar