Você está na página 1de 13

PT PANCA AMARA UTAMA

1900 MTPD AMMONIA PROJECT


CENTRAL SULAWESI, INDONESIA

PRELIMINARY DATASHEETS FOR


MULTI-POINT TEMPERATURE ELEMENT

F283-IC-DAS-IB2-0001

Revision: 0 P00 1 2

Prepared by: PB MM

Checked by: NSB/YL BBK

Approved by: RT RT

Revision Date: 18-May-13 29-Jun-15


ISSUED FOR RE-ISSUED FOR
Issue Purpose:
DESIGN DESIGN

This document contains information that is proprietary to KBR USA LLC (KBR) and is to be held in
confidence. This document and the information contained herein shall not be copied or used for other than
the purposes for which it is or has been provided.
Tag No. Service Rev.
TE-1375;TE-1376;TE-
1377;TE-1378;TE-
105-D AMMONIA SYNTHESIS CONVERTER P00
1379;TE-1380;TE-
1381;TE-1391
TE-1382;TE-1383;TE-
105-D AMMONIA SYNTHESIS CONVERTER P00
1384;TE-1385;TE-1386
TE-1387;TE-1388;TE-
105-D AMMONIA SYNTHESIS CONVERTER P00
1389;TE-1390
TE-1341;TE-1342;TE-
104-D1 HTS CONVERTER BED TEMPERATURE P00
1343;TE-1344
TE-1346;TE-1347;TE-
104-D2 LTS CONVERTER BED TEMPERATURE P00
1348;TE-1349;TE-1350
TE-1200A/B/C;TE-
1201A/B/C;TE-
106-D METHANATOR P00
1202A/B/C;TE-
1203A/B/C;TE-1357
GENERAL NOTES

MULTIPOINT THERMOCOUPLES
Client: PT PANCE AMARA UTAMA
Project: 1900 MTPD AMMONIA PLANT
Location CENTRAL SULAWESI, INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN Unit: AMMONIA
0 PB NSB RT 18-May-13 ISSUED FOR DESIGN Drawing No. F283-IC-IB21-0001
Rev By Chk Appr Date Revision Description Spec Form N Sheet 1 of 12
1 Tag Number TE-1375;TE-1376;TE-1377;TE-1378;TE-1379;TE-1380;TE-1381;TE-1391
2 Service Syn gas in 105D
3 Line No. P & ID Number N/A 62-D115
4 Equipment Number 105D
GENERAL 5 Location OR Pipe Class Field
6 Area Classification By DEC
7
8 Fluid State Syn Gas Vapor
9 Pressure: Unit Min Nor Max Kg/cm2 (G) 152-155
PROCESS 10 Temperature: Unit Min Nor Max ºC 170-530
CONDITIONS 11 Vibrations
12
13 Type Type K
14 ISA Type Ni-Cr v. Ni/ Al IEC 584 (K)
15 T/C Epoxy. Ground Unground Yes N/A Yes
16 Wire Gage
17 Material Resistance N/A N/A
18 RTD Wire/Material / Gage N/A
ELEMENT 19
20 Single / Double or Other Multiple
21 Sheath Diameter 6.35 mm
22 Sheath Material Inconel w/ MgO insulated
23 Length By Detailed Engineering based on Final Reactor Drawings. See page
24 5 of 12 for element location.
25
26 Type Weather-proof (IP 65) minimum
27 Material 316SS
28 Terminal Block Multiple
29 Conduit Conn. Size 1 1/2" NPT (with Plug)
30 Extension Type Nipple Union Nipple
HEAD 31 Nipple Size BY DEC
32 Union BY DEC
33 Nipple Union Length 228.6 mm
34 Spring Loaded Yes
35
36
38 Process Connection 4" RTJ Supplied by others (with Reactor)
39 Material 316SS or 321SS or 304SS
40 Sheathing Coating N/A N/A
41 Construction Type V
42 Internal Connection / Well I.D. To be confirmed by DEC / 48.9 mm (MIN)
43 Length Below Thread / Flange BY VESSEL SUPPLIER
WELL 44 Lagging Extension MFR STD
45 Plug & Chain N/A
46 Overall Length MFR STD (Note 1)
47 Treatment Finish MFR STD MFR STD
48 Stamping Yes
49 Guide Pipe Size & Schedule 4" ID
50 Flange Rating 1500# RTJ
51 Vendor BY DEC
PURCHASE 52 Manufacturer BY DEC
53 Model Number BY DEC
54 Purchase Order Number BY DEC
55
56
57 Note:
58
59 1. Must suit Length Below Thread/ Flange (U)
60 2. TE/TW assembly shall be provided with permanently attached
61 stainless steel tag stamped with tag number, manufacturer and
62 model number.
63 3. Thermocouples shall have "special limits of error" for improved
64 accuracy.
65
66
67
68
69
70
71
72
73
74
75
76
77
78

MULTIPOINT THERMOCOUPLES
Client: PT PANCA AMARA UTAMA
Project: 1900 MTPD AMMONIA
Location: CENTRAL SULAWESI, INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN Unit: AMMONIA
0 PB NSB RT 18-May-13 ISSUED FOR DESIGN Drawing No.: F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Spec Form No. 703 Sheet 2 of 12
1 Tag Number TE-1382;TE-1383;TE-1384;TE-1385;TE-1386
2 Service Syn gas in 105D
3 Line No. P & ID Number N/A 62-D115
4 Equipment Number 105D
GENERAL 5 Location OR Pipe Class Field
6 Area Classification By DEC
7
8 Fluid State Syn Gas Vapor
9 Pressure: Unit Min Nor Max Kg/cm2 (G) 152-155
PROCESS 10 Temperature: Unit Min Nor Max ºC 170-530
CONDITIONS 11 Vibrations
12
13 Type Type K
14 ISA Type Ni-Cr v. Ni/ Al IEC 584 (K)
15 T/C Epoxy. Ground Unground Yes N/A Yes
16 Wire Gage
17 Material Resistance N/A N/A
18 RTD Wire/Material / Gage N/A
ELEMENT 19
20 Single / Double or Other Multiple
21 Sheath Diameter 6.35 mm
22 Sheath Material 321SS w/ MgO insulated
23 Length By Detailed Engineering based on Final Reactor Drawings. See page
24 5 of 12 for element location.
25
26 Type Weather-proof (IP 65) minimum
27 Material 316SS
28 Terminal Block Multiple
29 Conduit Conn. Size 1 1/2" NPT (with Plug)
30 Extension Type Nipple Union Nipple
HEAD 31 Nipple Size BY DEC
32 Union BY DEC
33 Nipple Union Length 228.6 mm
34 Spring Loaded Yes
35
36
38 Process Connection 4" RTJ Supplied by others (with Reactor)
39 Material 316SS or 321SS or 304SS
40 Sheathing Coating N/A N/A
41 Construction Type Tapered with Bar-stock shank and Welded flange
42 Internal Connection / Well I.D. To be confirmed by DEC / 38 mm (MIN)
43 Length Below Thread / Flange BY VESSEL SUPPLIER
WELL 44 Lagging Extension MFR STD
45 Plug & Chain N/A
46 Overall Length MFR STD (Note 1)
47 Treatment Finish MFR STD MFR STD
48 Stamping Yes
49 Guide Pipe Size & Schedule 4" ID
50 Flange Rating 1500# RTJ
51 Vendor BY DEC
PURCHASE 52 Manufacturer BY DEC
53 Model Number BY DEC
54 Purchase Order Number BY DEC
55
56
57 Note:
58
59 1. Must suit Length Below Thread/ Flange (U)
60 2. TE/TW assembly shall be provided with permanently attached
61 stainless steel tag stamped with tag number, manufacturer and
62 model number.
63 3. Thermocouples shall have "special limits of error" for improved
64 accuracy.
65
66
67
68
69
70
71
72
73
74
75
76
77
78

MULTIPOINT THERMOCOUPLES
Client: PT PANCA AMARA UTAMA
Project: 1900 MTPD AMMONIA
Location: CENTRAL SULAWESI, INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN Unit: AMMONIA
0 PB NSB RT 12-Apr-13 ISSUED FOR DESIGN Drawing No.: F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Spec Form No. 703 Sheet 3 of 12
1 Tag Number TE-1387;TE-1388;TE-1389;TE-1390
2 Service Syn gas in 105D
3 Line No. P & ID Number N/A 62-D115
4 Equipment Number 105D
GENERAL 5 Location OR Pipe Class Field
6 Area Classification By DEC
7
8 Fluid State Syn Gas Vapor
9 Pressure: Unit Min Nor Max Kg/cm2 (G) 152-155
PROCESS 10 Temperature: Unit Min Nor Max ºC 170-530
CONDITIONS 11 Vibrations
12
13 Type Type K
14 ISA Type Ni-Cr v. Ni/ Al IEC 584 (K)
15 T/C Epoxy. Ground Unground Yes N/A Yes
16 Wire Gage
17 Material Resistance N/A N/A
18 RTD Wire/Material / Gage N/A
ELEMENT 19
20 Single / Double or Other Multiple
21 Sheath Diameter 6.35 mm
22 Sheath Material 321SS w/ MgO insulated
23 Length By Detailed Engineering based on Final Reactor Drawings. See page
24 5 of 12 for element location.
25
26 Type Weather-proof (IP 65) minimum
27 Material 316SS
28 Terminal Block Multiple
29 Conduit Conn. Size 1 1/2" NPT (with Plug)
30 Extension Type Nipple Union Nipple
HEAD 31 Nipple Size BY DEC
32 Union BY DEC
33 Nipple Union Length 228.6 mm
34 Spring Loaded Yes
35
36
38 Process Connection 4" RTJ Supplied by others (with Reactor)
39 Material 316SS or 321SS or 304SS
40 Sheathing Coating N/A N/A
41 Construction Type Tapered with Bar-stock shank and Welded flange
42 Internal Connection / Well I.D. To be confirmed by DEC / 38 mm (MIN)
43 Length Below Thread / Flange BY VESSEL SUPPLIER
WELL 44 Lagging Extension MFR STD
45 Plug & Chain N/A
46 Overall Length MFR STD (Note 1)
47 Treatment Finish MFR STD MFR STD
48 Stamping Yes
49 Guide Pipe Size & Schedule 4" ID
50 Flange Rating 1500# RTJ
51 Vendor BY DEC
PURCHASE 52 Manufacturer BY DEC
53 Model Number BY DEC
54 Purchase Order Number BY DEC
55
56
57 Note:
58
59 1. Must suit Length Below Thread/ Flange (U)
60 2. TE/TW assembly shall be provided with permanently attached
61 stainless steel tag stamped with tag number, manufacturer and
62 model number.
63 3. Thermocouples shall have "special limits of error" for improved
64 accuracy.
65
66
67
68
69
70
71
72
73
74
75
76
77
78

MULTIPOINT THERMOCOUPLES
Client: PT PANCA AMARA UTAMA
Project: 1900 MTPD AMMONIA
Location: CENTRAL SULAWESI, INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN Unit: AMMONIA
0 PB NSB RT 12-Apr-13 ISSUED FOR DESIGN Drawing No.: F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Spec Form No. 703 Sheet 4 of 12
105D Multi-Point Thermocouple Assemblies
Des. Temp.= 530 DegC
Dimensions are in millimeters, except where noted.

Nozzle # TW O.D. Element Element Element Element Element Element Element Element Dim. "Y"
Thermowell Nipple NPT TW sch Tag No. A Tag No. B Tag No. C Tag No. D Tag No. E Tag No. F Tag No. G Tag No. H # Points
TW-1375 AT 3" NPS TE-1381 TE-1380 TE-1391 TE-1379 TE-1378 TE-1377 TE-1376 TE-1375 150
Dim. To TE 4" XXS 1830 + A1 3220 + A1 4910 + A1 8990 + A1 12140 + A1 15580 + A1 18680 + A1 20920 + A1 8

TW-1382 BT 3" NPS TE-1382 TE-1383 TE-1384 TE-1385 TE-1386 150


Dim. To TE 4" XXS B1 1830 + B1 3220 + B1 8990 + B1 12140 + B1 5

TW-1387 CT 3" NPS TE-1390 TE-1389 TE-1388 TE-1387 150


Dim. To TE 4" XXS 3180 + C1 5420 + C1 10080 + C1 12320 + C1 4

450

A1

C1 B1

Notes:
1. Each assembly to be suitable for 530 degrees C operating temperature.
2. Mineral insulated thermoucouples to be seathed with 321 SS.
3. Supplier to check assembly by sliding a pipe (ID as in table) over entire length. If noted pipe to have bend as described in separate detail.
4. Thermocouple elements to be Type K, 6.35mm OD sheath.
5. Supplier to use materials for component not defined.
6. Junction Box to be IP 65, Approx. 250Hx250Wx150D.
7. Thermocouple junctions are ungrounded.
8. TW thread is NPTM.
9. Preferable center support rod type over the metal strip guide type. It is also preferable to have bimetallic spring loaded sensor in lieu of mechanical spring loaded sensor.
10. Final element length to be finalized by DEC with Reactor MFR drawings.
11. Dimensions A1 and B1 are referenced to the vessel flange line and connection C1 is referenced to the vessel Tangent Line. Total element to be defined with Reactor mechanical design.

P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN


0 PB NSB RT 12-Apr-13 ISSUED FOR DESIGN Dwg No. F283-IC-DAS-IB2-0001
Rev. By Chk Appr Date Rev. Desc. page 5 of 12
1 Tag Number TE-1341; TE-1342; TE-1343; TE-1344
2 Service 104-D1 HTS CONVERTER BED TEMPERATURE
3 Line No. / Equipment No. P & ID Number 104-D1 62-D108
GENERAL 4 Location FIELD
5 Area Classification BY DETAIL ENG.
6
7
8 Fluid State REFORMED GAS VAPOR
PROCESS 9 Pressure: Unit Min Nor Max kg/cm2 (g) 38.35
CONDITIONS 10 Temperature: Unit Min Nor Max ºC -12 428 475
11 Vibrations YES
12 Flex. Temp (Hi/Low)
13 Flow Density Pipe ID Protected Length
14 Max Design Pressure Max Design Temperature 42.8 kg/cm2 (g) 475 ºC
15 Type THERMOCOUPLE
16 ISA Type K TYPE
17 T/C Epoxy. Ground Unground YES N/A YES
18
19 Material Resistance N/A N/A
20 RTD Wire/Material / Gauge N/A
ELEMENT 21
22 Single / Double or Other MULTIPLE (REFER TO SHEET 7 FOR MULTI-ELEMENT DETAILS)
23 Sheath Outside Diameter (OD) 8.00 mm
24 Element Length BY SUPPLIER in
25 Sheath Material INCONEL 600 W/ MgO INSULATED
26 Insulation MAGNESIUM OXIDE
27 Extension BY DETAIL ENG.
28 Type WEATHERPROOF SCREWED (THRD. COVER WITH CHAIN ATTACHMENT)
29 Material 316SS
30 Terminal Block MULTIPLE TERMINALS (SEE SHEET 7)
31 Electrical Connection 1 1/2" NPT (4 Nos)
32 Extension Type NIPPLE UNION NIPPLE
HEAD 33 Nipple Size (TO BE VERIFIED BY DETAIL ENGINEERING)
34 Union (TO BE VERIFIED BY DETAIL ENGINEERING)
35 Nipple Union Length 228.6 mm
36 Spring Loaded YES
37 Electrical Enclosure Class Enclosure Class BY DETAIL ENG. IP 65
38
39 Process Connection Rating 2" RF 600#
40 Material BY VESSEL SUPPLIER
41 Sheathing Coating BY VESSEL SUPPLIER BY VESSEL SUPPLIER
42 Construction Type BY VESSEL SUPPLIER
43 Internal Connection BY VESSEL SUPPLIER
44 "U" Dimension BY VESSEL SUPPLIER
WELL 45 Lagging Extension BY VESSEL SUPPLIER
46 Plug & Chain BY VESSEL SUPPLIER
47 Overall Length BY VESSEL SUPPLIER
48 Treatments Finish BY VESSEL SUPPLIER BY VESSEL SUPPLIER
49 Stamping BY VESSEL SUPPLIER
50 Well Internal Diameter (ID) BY VESSEL SUPPLIER
51 Base Diameter Tip Diameter Tip Thickness BY VESSEL SUPPLIER BY VESSEL SUPPLIER BY VESSEL SUPPLIER
52 Certified Vibration Calculation
53 Vendor BY DETAIL ENG.
54 Manufacturer BY DETAIL ENG.
PURCHASE 55 Model Number BY DETAIL ENG.
56 Purchase Order Number BY DETAIL ENG.
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

MULTIPOINT THERMOCOUPLES
Client: PT PANCA AMARA UTAMA
Project: 1900 MTPD AMMONIA PLANT
Location: CENTRAL SULAWESI,INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN Unit: AMMONIA
0 PB NSB RT 12-Apr-13 ISSUED FOR DESIGN Doc No. F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Spec Form No. 703 Sheet 6 of 12
104-D1 Multi-Point Thermocouple Assemblies
Des. Temp.= 475 degC

Nozzle # TW O.D. Element Element Element Element Element Element Element Element Dim. "Y"
Thermowell Nipple NPT TW I.D. Tag No. A Tag No. B Tag No. C Tag No. D Tag No. E Tag No. F Tag No. G Tag No. H # Points
TW-1341 AT 1 1/4" NPS TE-1341 TE-1342 TE-1343 TE-1344 50
Dim. To TE 2" 32.4612 mm 90+A1 630+A1 1170+A1 1710+A1 4

TL

1 Each assembly to be suitable for 475°C operating temperature.


2 Mineral insulated thermoucouples to be seathed with Inconel 600.
3 Supplier to check assembly by sliding a pipe (ID as in table) over entire length.
If noted pipe to have bend as described in separate detail.
4 Thermocouple elements to be Type K, 8mm OD sheath.
5 Supplier to use suitable materials for components not defined.
6 Junction Box to be IP 65, Approx. 250Hx250Wx150D.
7 Thermocouple junctions are ungrounded.
8 TW thread is NPTM.
9 Insertion length to be confirmed by Detail Eng.
10 Dimensions A1 is referenced to the vessel Upper Tangent Line. Total element to be defined with Reactor mechanical design.

P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN


0 PB NSB RT 12-Apr-13 ISSUED FOR DESIGN Doc. No. F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Sheet 7 of 12
1 Tag Number TE-1346; TE-1347; TE-1348; TE-1349; TE-1350
2 Service 104-D2 LTS CONVERTER BED TEMPERATURE
3 Line No. / Equipment No. P & ID Number 104-D2 62-D108A
GENERAL 4 Location FIELD
5 Area Classification BY DETAIL ENG.
6
7
8 Fluid State REFORMED GAS VAPOR
PROCESS 9 Pressure: Unit Min Nor Max kg/cm2 (g) 37.36
CONDITIONS 10 Temperature: Unit Min Nor Max ºC -12 226 275
11 Vibrations YES
12 Flex. Temp (Hi/Low)
13 Flow Density Pipe ID Protected Length
14 Max Design Pressure Max Design Temperature 42.8 kg/cm2 (g) 275 ºC
15 Type THERMOCOUPLE
16 ISA Type K TYPE
17 T/C Epoxy. Ground Unground YES N/A YES
18
19 Material Resistance N/A N/A
20 RTD Wire/Material / Gauge N/A
ELEMENT 21
22 Single / Double or Other MULTIPLE (REFER TO SHEET 9 FOR MULTI-ELEMENT DETAILS)
23 Sheath Outside Diameter (OD) 8.00 mm
24 Element Length BY SUPPLIER in
25 Sheath Material INCONEL 600 W/ MgO INSULATED
26 Insulation MAGNESIUM OXIDE
27 Extension BY DETAIL ENG.
28 Type WEATHERPROOF SCREWED (THRD. COVER WITH CHAIN ATTACHMENT)
29 Material 316SS
30 Terminal Block MULTIPLE TERMINALS (SEE SHEET 9)
31 Electrical Connection 1 1/2" NPT (5 Nos)
32 Extension Type NIPPLE UNION NIPPLE
HEAD 33 Nipple Size (TO BE VERIFIED BY DETAIL ENGINEERING)
34 Union (TO BE VERIFIED BY DETAIL ENGINEERING)
35 Nipple Union Length 228.6 mm
36 Spring Loaded YES
37 Electrical Enclosure Class Enclosure Class BY DETAIL ENG. IP 65
38
39 Process Connection Rating 2" RF 600#
40 Material BY VESSEL SUPPLIER
41 Sheathing Coating BY VESSEL SUPPLIER BY VESSEL SUPPLIER
42 Construction Type BY VESSEL SUPPLIER
43 Internal Connection BY VESSEL SUPPLIER
44 "U" Dimension BY VESSEL SUPPLIER
WELL 45 Lagging Extension BY VESSEL SUPPLIER
46 Plug & Chain BY VESSEL SUPPLIER
47 Overall Length BY VESSEL SUPPLIER
48 Treatments Finish BY VESSEL SUPPLIER BY VESSEL SUPPLIER
49 Stamping BY VESSEL SUPPLIER
50 Well Internal Diameter (ID) BY VESSEL SUPPLIER
51 Base Diameter Tip Diameter Tip Thickness BY VESSEL SUPPLIER BY VESSEL SUPPLIER BY VESSEL SUPPLIER
52 Certified Vibration Calculation THERMO WELL IS PROVIDED BY VESSEL SUPPLIER
53 Vendor BY DETAIL ENG.
54 Manufacturer BY DETAIL ENG.
PURCHASE 55 Model Number BY DETAIL ENG.
56 Purchase Order Number BY DETAIL ENG.
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

MULTIPOINT THERMOCOUPLES
Client: PT PANCA AMARA UTAMA
Project: 1900 MTPD AMMONIA PLANT
Location: CENTRAL SULAWESI,INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN Unit: AMMONIA
0 PB NSB RT 12-Apr-13 ISSUED FOR DESIGN Doc No. F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Spec Form No. 703 Sheet 8 of 12
104-D2 Multi-Point Thermocouple Assemblies
Des. Temp.= 275 degC

Nozzle # TW O.D. Element Element Element Element Element Element Element Element Dim. "Y"
Thermowell Nipple NPT TW I.D. Tag No. A Tag No. B Tag No. C Tag No. D Tag No. E Tag No. F Tag No. G Tag No. H # Points
TW-1346 AT 1 1/4" NPS TE-1346 TE-1347 TE-1348 TE-1349 TE-1350 50
Dim. To TE 2" 32.4612 mm A1+180 A1+850 A1+1530 A1+2200 A1+2880 5

TL

1 Each assembly to be suitable for 275°C operating temperature.


2 Mineral insulated thermoucouples to be seathed with Inconel 600.
3 Supplier to check assembly by sliding a pipe (ID as in table) over entire length.
If noted pipe to have bend as described in separate detail.
4 Thermocouple elements to be Type K, 8mm OD sheath.
5 Supplier to use suitable materials for components not defined.
6 Junction Box to be IP 65, Approx. 250Hx250Wx150D.
7 Thermocouple junctions are ungrounded.
8 TW thread is NPTM.
9 Insertion length to be confirmed by Detail Eng.
10 Dimensions A1 is referenced to the vessel Upper Tangent Line. Total element to be defined with Reactor mechanical design.

P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR DESIGN


0 PB NSB RT 12-Apr-13 ISSUED FOR DESIGN DOC NO. F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Sheet 9 of 12
1 Tag Number See SHEET 11
2 Service 106-D METHANATOR TEMPERATURE
3 Line No. / Equipment No. P & ID Number 106-D 62-D111
GENERAL 4 Location FIELD
5 Area Classification BY DETAIL ENG.
6
7
8 Fluid State REFORMED GAS VAPOR
PROCESS 9 Pressure: Unit Min Nor Max kg/cm2 (g) 35.46
CONDITIONS 10 Temperature: Unit Min Nor Max ºC 340
11 Vibrations YES
12 Flex. Temp (Hi/Low)
13 Flow Density Pipe ID Protected Length
14 Max Design Pressure Max Design Temperature 40.3 Kg/cm2 (g) 454 ºC
15 Type THERMOCOUPLE
16 ISA Type K TYPE
17 T/C Epoxy. Ground Unground YES N/A YES
18
19 Material Resistance N/A N/A
20 RTD Wire/Material / Gauge N/A
ELEMENT 21
22 Single / Double or Other MULTIPLE (REFER TO SHEET 11 FOR MULTI-ELEMENT DETAILS)
23 Sheath Outside Diameter (OD) 8.00 mm
24 Element Length BY SUPPLIER in
25 Sheath Material INCONEL 600 W/ MgO INSULATED
26 Insulation MAGNESIUM OXIDE
27 Extension BY DETAIL ENG.
28 Type WEATHERPROOF SCREWED (THRD. COVER WITH CHAIN ATTACHMENT)
29 Material 316SS
30 Terminal Block MULTIPLE TERMINALS (SEE SHEET 11)
31 Electrical Connection 1 1/2" NPT (7 Nos)
32 Extension Type NIPPLE UNION NIPPLE
HEAD 33 Nipple Size (TO BE VERIFIED BY DETAIL ENGINEERING)
34 Union (TO BE VERIFIED BY DETAIL ENGINEERING)
35 Nipple Union Length 228.6 mm
36 Spring Loaded YES
37 Electrical Enclosure Class Enclosure Class BY DETAIL ENG. IP 65
38
39 Process Connection Rating 2" RF 600#
40 Material BY VESSEL SUPPLIER
41 Sheathing Coating BY VESSEL SUPPLIER BY VESSEL SUPPLIER
42 Construction Type BY VESSEL SUPPLIER
43 Internal Connection BY VESSEL SUPPLIER
44 "U" Dimension BY VESSEL SUPPLIER
WELL 45 Lagging Extension BY VESSEL SUPPLIER
46 Plug & Chain BY VESSEL SUPPLIER
47 Overall Length BY VESSEL SUPPLIER
48 Treatments Finish BY VESSEL SUPPLIER BY VESSEL SUPPLIER
49 Stamping BY VESSEL SUPPLIER
50 Well Internal Diameter (ID) BY VESSEL SUPPLIER
51 Base Diameter Tip Diameter Tip Thickness BY VESSEL SUPPLIER BY VESSEL SUPPLIER BY VESSEL SUPPLIER
52 Certified Vibration Calculation THERMO WELL IS PROVIDED BY VESSEL SUPPLIER
53 Supplier BY DETAIL ENG.
54 Manufacturer BY DETAIL ENG.
PURCHASE 55 Model Number BY DETAIL ENG.
56 Purchase Order Number BY DETAIL ENG.
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73
74
75

MULTIPOINT THERMOCOUPLES
Client: PT PANCA AMARA UTAMA
Project: 1900 MTPD AMMONIA PLANT
Location: CENTRAL SULAWESI,INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR BOOK Unit: AMMONIA
0 PB NSB RT 12-Apr-13 ISSUED FOR BOOK Doc No. F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Spec Form No. 703 Sheet 10 of 12
106-D Multi-Point Thermocouple Assemblies
Des. Temp. = 454 degC

Nozzle # TW O.D. Element Element Element Element Element Element Element Element Dim. "Y"
Thermowell Nipple NPT TW I.D. Tag No. A Tag No. B Tag No. C Tag No. D Tag No. E Tag No. F Tag No. G Tag No. H # Points
TW-1358 AT 1 1/4" NPS TE-1200A TE-1200B TE-1200C TE-1202A TE-1202B TE-1202C TE-1362 50
Dim. To TE 2" 32.4612 450+A1 450+A1 450+A1 1850+A1 1850+A1 1850+A1 2550+A1 7
Duplex Duplex Duplex Duplex Duplex Duplex
TW-1357 BT 1 1/4" NPS TE-1357 TE-1201A TE-1201B TE-1201B TE-1203A TE-1203B TE-1203C 50
Dim. To TE 2" 32.4612 350+A1 1150+A1 1150+A1 1150+A1 2550+A1 2550+A1 2550+A1 7
Duplex Duplex Duplex Duplex Duplex Duplex

1 Each assembly to be suitable for 454°C operating temperature.


2 Mineral insulated thermoucouples to be seathed with Inconel 600.
3 Supplier to check assembly by sliding a pipe (ID as in table) over entire length.
If noted pipe to have bend as described in separate detail.
4 Thermocouple elements to be Type K, 8mm OD sheath.
5 Supplier to use suitable materials for components not defined.
6 Junction Box to be IP 65, Approx. 250Hx250Wx150D.
7 Thermocouple junctions are ungrounded.
8 TW thread is NPTM.
9 Insertion length to be confirmed by Detail Eng.
10 Dimensions A1 is referenced to the vessel Upper Tangent Line. Total element to be defined with Reactor mechanical design.

P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR BOOK


0 PB NSB RT 12-Apr-13 ISSUED FOR BOOK DOC NO. F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Sheet 11 of 12
Tag Number: TE-1375;TE-1376;TE-1377;TE-1378;TE-1379;TE-1380;TE-1381;TE-1391;TE-1382;TE-1383;TE-1384;TE-1385;TE-1386 ;TE-1387;TE-1388;
TE-1389;TE-1390;TE-1341;TE-1342;TE-1343;TE-1344;TE-1346;TE-1347;TE-1348;TE-1349;TE-1350;TE-1200A/B/C;TE-1201A/B/C;
TE-1202A/B/C;TE-1203A/B/C;TE-1357,TE-1362

NOTES:

1. Temperature Element assemblies shall be supplied in strict accordance with: Datasheet.

2. Supplier to state, in quotation, any deviations from this data sheet and the technical specifications contained in the
requisition package.In case of conflict between data sheet and technical specifications, Vendor shall contact
purchaser for clarification.

3. Thermocouple Element and Head shall be factory assembled prior to shipment.

4 Final element length to be finalized by DEC with Reactor MFR drawings.

MULTIPOINT THERMOCOUPLES
Client: PT PANCA AMARA UTAMA
Project: 1900 MTPD AMMONIA PLANT
Location: CENTRAL SULAWESI,INDONESIA
P00 MM BBK RT 29-Jun-15 RE-ISSUED FOR BOOK Unit: AMMONIA
0 PB NSB RT 12-Apr-13 ISSUED FOR BOOK Doc No. F283-IC-DAS-IB2-0001
Rev By Chk Appr Date Revision Description Spec Form No. 703 Sheet 12 of 12