1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 1 1 1 1 ###### 363549
225643
1 1 1 1 1 ###### 225641
1 1 1 1 1 ###### 334350
1 1 1 1 1 ###### 292001
1 1 1 1 ###### 328704
342812
344926
5 0 0 5 5 0 0 5 4 ###### 0 0 0 0 0 PROYECTOS
TRANSPORTE - TRANSPORTE TERRESTRE - VÍA
358304
345589
356076
356358
372529
372533
351540
FECHA DE FISICO EXP.
NOMBRE DEL PROYECTO REGISTRO TÉCNICO
MONTO DE EXP.
MONTO DE FECHA DE REGISTRO DE TIENE MODALIDAD
TEC. APROBADO EJECUCION
VIABILIDAD VIABILIDAD INVERSION DE EJECUCION
POR LA ENTIDAD
POR
S/565,551.07 25/07/2016 SI S/558,992.61 SI CONTRATA
POR
S/786,388.89 13/01/2016 SI S/786,388.89 SI CONTRATA
POR
S/940,836.29 1/12/2016 SI S/940,836.29 SI CONTRATA
POR
S/7,418,051.00 9/17/2015 SI S/7,418,051.00 SI CONTRATA
POR
S/4,236,903.00 15/04/2014 SI S/5,503,764.24 SI CONTRATA
POR
S/10,295,264.00 8/4/2015 SI S/10,295,264.16 SI CONTRATA
POR
S/867,891.06 12/9/2015 SI S/871,432.31 SI CONTRATA
POR
S/242,038.71 2/1/2016 SI S/237,931.85 SI CONTRATA
POR
S/4,842,455.00 17/02/2017 NO - NO CONTRATA
POR
- NO CONTRATA
POR
S/1,199,206.18 24/02/2016 SI S/1,666,336.67 NO CONTRATA
POR
S/11,332,608.00 4/28/2016 SI S/13,466,372.04 NO CONTRATA
POR
S/3,226,414.00 4/29/2016 NO - NO CONTRATA
POR
S/8,448,269.00 12/1/2016 SI S/7,676,754.98 NO CONTRATA
POR
S/4,503,577.00 12/13/2016 NO - NO CONTRATA
ES EN RIESGO
POR
S/468,662.96 - NO - N0 CONTRATA
EJECUCION DE OBRA COSTO DE OBRA Y CONTRA
MONTO
PLAZO MONTO DE ADICIONAL NETO MONTO FINAL DEL
ESTADO DE FECHA DE EJECUCION EJECUCIÓN DE CONTRATO DE
EJECUCION INICIO DE OBRA EN ETAPA DE
(DÍAS) OBRA OBRA
EJECUCION
RESOLUCION DE
S/18,673.86 S/6,780.00 - S/558,992.61 ALCALDIA N°264-
2017-MDM/A
RESOLUCION DE
S/39,587.82 S/11,500.00 - S/893,207.02 ALCALDIA N°150-
2017-MDM/A
RESOLUCION DE
S/40,334.76 S/11,500.00 - S/942,218.11 ALCALDIA N°149-
2017-MDM/A
FALTA PRESENTACION
S/340,279.33 S/272,185.00 - S/7,438,097.71 DE LIQUIDACION DE
OBRA
RESOLUCION DE
S/258,900.09 S/50,847.45 - S/5,607,391.17 ALCALDIA N°271-A-
2017-MDM/A
RESOLUCION DE
S/40,053.92 S/30,300.00 - S/871,432.31 ALCALDIA N°008-
2018-MDM/A
RESOLUCION DE
S/5,742.24 S/2,500.00 - S/237,931.85 ALCALDIA N°017-
2017-MDM/A
INFOBRAS FINANCIAMIENTO
COMPLETO FONCOMUN
CONT
PERFIL
11,500.00
39,995.00
39,995.00
39,999.00
60,000.00
11,500.00
11,500.00
39,995.00
39,995.00
39,995.00
CODIGO
SNIP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 1 1 1 ###### 363548
1 1 1 1 1 ###### 301386
1 1 1 ###### 1 301339
1 1 1 ###### 1 287081
1 1 1 ###### 1 301428
1 1 1 ###### 301370
1 1 1 ###### 301552
1 1 1 7 7 0 0 7 0 ###### 0 0 0 0 3 PROYECTOS
PROTECCIÓN SOCIAL - ASISTENCIA SOCIAL -
1 336083
351540
FECHA DE FISICO EXP.
NOMBRE DEL PROYECTO REGISTRO TÉCNICO
PROYECTOS
PROTECCIÓN SOCIAL - ASISTENCIA SOCIAL - PROTECCIÓN DE POBLACIONES EN RIESGO
CREACION DE LOSA DE RECREACION MULTIUSOS EN EL BARRIO DE AUCHI- 11/11/2015 -
PAMPA, DISTRITO DE MOLINO - PACHITEA - HUANUCO
AGROPECUARIA - RIEGO - INFRAESTRUCTURA DE RIEGO
RECUPERACION DEL SERVICIO DE AGUA PARA RIEGO EN EL CENTRO EXP. TÉCNICO
POBLADO DE CALLAGAN MANZANO, DISTRITO DE MOLINO - PACHITEA - 17/08/2016 (2016)
HUANUCO
1,067,760.84
956,059.36
APROBACION DE
VIABILIDAD SOSEM EXP. TECNICO
MONTO DE EXP.
MONTO DE FECHA DE REGISTRO DE MODALIDAD
ESTADO PIP TEC. APROBADO
VIABILIDAD VIABILIDAD INVERSION DE EJECUCION
POR LA ENTIDAD
POR ADM.
S/280,549.04 09/08/2016 ACTIVO SI S/293,716.24 DIRECTA
POR ADM.
S/114,884.48 8/6/2014 ACTIVO SI S/114,884.48 DIRECTA
POR ADM.
S/114,307.80 06/08/2014 ACTIVO SI S/114,307.80 DIRECTA
POR ADM.
S/113,039.39 8/6/2014 ACTIVO SI S/113,039.39 DIRECTA
POR ADM.
S/100,000.00 8/6/2014 ACTIVO SI S/100,000.00 DIRECTA
POR ADM.
S/106,354.79 8/6/2014 ACTIVO SI S/106,354.79 DIRECTA
EN RIESGO
POR ADM.
S/113,756.66 08/08/2014 ACTIVO SI S/113,756.66 DIRECTA
EN RIESGO
POR ADM.
DIRECTA
POR ADM.
S/1,184,372.19 12/6/2016 ACTIVO NO - DIRECTA
POR ADM.
S/655,886.16 06/04/2016 ACTIVO NO - DIRECTA
COSTO DE OBRA Y CONTRATOS
MONTO
PLAZO MONTO DE
ESTADO DE FECHA DE ADICIONAL NETO CONTRATO
EJECUCION EJECUCIÓN DE
EJECUCION INICIO DE OBRA EN ETAPA DE SUPERVISION
(DÍAS) OBRA EJECUCION
INVERSION TOTAL
CONTRATO EXP. (INCL. ELAB. ESTADO DE
INVERSION TOTAL LIQUIDACION ESTADO DE INFOBRAS
TECNICO DE LIQUIDACION
OBRA)
FALTA DECLARAR
S/10,000.00 S/604,624.36 S/604,624.36 FALTA CIERRE DE OBRA
FALTA DECLARAR
- S/114,884.48 S/114,884.48 FALTA CIERRE DE OBRA
#REF!
FALTA DECLARAR
S/0.00 S/155,518.53 S/155,518.53 FALTA CIERRE DE OBRA
RESOLUCION DE
S/0.00 S/125,953.53 S/125,953.53 ALCALDIA N°006- COMPLETO
2018-MDM/A
RESOLUCION DE
S/0.00 S/106,354.79 S/106,354.79 ALCALDIA N°007- COMPLETO
2018-MDM/A
RESOLUCION DE
- S/128,999.24 S/128,999.24 ALCALDIA N°014- COMPLETO
2018-MDM/A
FINANCIAMIENTO
CONT
ENTE FINANCIANTE PERFIL
FONCOMUN 11,400.00
COFINANCIAMIENTO
ENTRE MDM Y CMAN
COFINANCIAMIENTO 9,500.00
ENTRE MDM Y CMAN
COFINANCIAMIENTO
ENTRE MDM Y CMAN
COFINANCIAMIENTO
ENTRE MDM Y CMAN
COFINANCIAMIENTO 6,500.00
ENTRE MDM Y CMAN
CODIGO
SNIP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 1 1 1 363548
363549
1 1 1 1 301386
301410
225643
225641
334350
301339
292001
301428
301370
328704
301552
342812
344926
1 1 0 2 2 0 0 2 0 0 0 0 0 0 0 0 PROYECTOS
TRANSPORTE - TRANSPORTE TERRESTRE - VÍA
358304
345589
356076
356358
372529
372533
364943
351540
351540
DOCUMENTOS EN FISICO
PROYECTOS
TRANSPORTE - TRANSPORTE TERRESTRE - VÍAS VECINALES
MONTO DE EXP.
FISICO EXP. MONTO DE FECHA DE REGISTRO DE
ESTADO PIP TEC. APROBADO
TÉCNICO VIABILIDAD VIABILIDAD INVERSION POR LA ENTIDAD
EVENCIÓN DE DESASTRES
2014 (GESTION S/113,039.39 8/6/2014 ACTIVO SI S/113,039.39
ANTERIOR)
EN RIESGO
2015 - 2016 -
EVENCIÓN DE DESASTRES
EN RIESGO
-
OMUNAL
PLAZO MONTO DE
TIENE MODALIDAD ESTADO DE FECHA DE EJECUCION EJECUCIÓN DE
EJECUCION DE EJECUCION EJECUCION INICIO DE OBRA (DÍAS) OBRA
POR ADM.
SI FINALIZADA 9/9/2016 120 S/271,380.75
DIRECTA
POR
SI FINALIZADA 10/18/2016 120 S/533,538.75
CONTRATA
POR ADM.
SI FINALIZADA 6/1/2016 60 S/114,884.48
DIRECTA
POR ADM.
SI FINALIZADA 2/3/2016 45 S/102,340.00
DIRECTA
POR
SI FINALIZADA 9/30/2016 90 S/735,301.06
CONTRATA
POR
SI FINALIZADA 10/4/2016 90 S/889,001.57
CONTRATA
POR
SI FINALIZADA 7/23/2016 360 S/6,805,586.67
CONTRATA
POR ADM.
SI FINALIZADA 3/16/2016 60 S/114,307.80
DIRECTA
POR
SI FINALIZADA 12/10/2016 240 S/5,178,001.75
CONTRATA
POR ADM.
SI FINALIZADA 5/16/2016 60 S/113,039.39
DIRECTA
POR ADM.
SI FINALIZADA 4/11/2016 75 S/100,000.00
DIRECTA
POR ADM.
SI FINALIZADA 6/1/2016 60 S/106,354.79
DIRECTA
POR
SI FINALIZADA 7/11/2016 300 S/9,537,848.12
CONTRATA
POR ADM.
SI FINALIZADA 6/1/2016 60 S/113,756.66
DIRECTA
POR
SI FINALIZADA 6/15/2016 90 S/801,078.39
CONTRATA
POR
SI FINALIZADA 5/28/2016 90 S/229,689.61
CONTRATA
POR
NO CONTRATA
POR
NO CONTRATA
POR
NO CONTRATA
POR
NO CONTRATA
POR
NO CONTRATA
POR
NO CONTRATA
NO POR
CONTRATA
POR
N0 CONTRATA
POR ADM.
NO DIRECTA
POR ADM.
NO DIRECTA
POR
N0 CONTRATA
COSTO DE OBRA Y CONTRATOS
MONTO
ADICIONAL NETO REAJUSTE DE MONTO FINAL DEL CONTRATO CONTRATO EXP. CAPACITACION Y
CONTRATO DE
EN ETAPA DE PRECIOS SUPERVISION TECNICO PASANTIA
OBRA
EJECUCION
- - - S/12,335.49 S/10,000.00 -
- - - S/0.00 - -
S/35,938.64 - - - - -
S/28,026.23 - - - - -
S/5,197,992.25 #REF!
S/42,479.14 - - - S/0.00 -
S/25,953.53 - - - S/0.00 -
- - - - S/0.00 -
S/15,242.58 - - - - -
INVERSION TOTAL
(INCL. ELAB. ESTADO DE
INVERSION TOTAL LIQUIDACION ESTADO DE INFOBRAS
DE LIQUIDACION
OBRA)
FALTA DECLARAR
S/604,624.36 S/604,624.36 FALTA CIERRE DE OBRA
FALTA DECLARAR
S/114,884.48 S/114,884.48 FALTA CIERRE DE OBRA
RESOLUCION DE
S/138,278.64 #REF! ALCALDIA N°089- COMPLETO
2017-MDM/A
#REF!
FALTA DECLARAR
S/155,518.53 S/155,518.53 FALTA CIERRE DE OBRA
RESOLUCION DE
S/125,953.53 S/125,953.53 ALCALDIA N°006- COMPLETO
2018-MDM/A
RESOLUCION DE
S/106,354.79 S/106,354.79 ALCALDIA N°007- COMPLETO
2018-MDM/A
FALTA DECLARAR
S/10,295,264.16 - FALTA CIERRE DE OBRA
RESOLUCION DE
S/128,999.24 S/128,999.24 ALCALDIA N°014- COMPLETO
2018-MDM/A
RESOLUCION DE
S/237,931.85 - ALCALDIA N°017- COMPLETO
2017-MDM/A
FINANCIAMIENTO
CONT
ENTE FINANCIANTE PERFIL
FONCOMUN 11,400.00
FONCOMUN 11,500.00
COFINANCIAMIENTO
ENTRE VIVIENDA Y MDM
COFINANCIAMIENTO 39,995.00
ENTRE MDM Y FONIPREL
COFINANCIAMIENTO
ENTRE MDM Y CMAN
COFINANCIAMIENTO 39,999.00
ENTRE VIVIENDA Y MDM
COFINANCIAMIENTO 9,500.00
ENTRE MDM Y CMAN
COFINANCIAMIENTO
ENTRE MDM Y CMAN
COFINANCIAMIENTO
ENTRE MDM Y CMAN
FONIPREL 60,000.00
COFINANCIAMIENTO 6,500.00
ENTRE MDM Y CMAN
FONCOMUN
FONCOMUN
11,500.00
11,500.00
39,995.00
39,995.00
39,995.00
CODIGO
SNIP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 1 1 1 ### 371186
###
EDUCACIÓN - EDUCACIÓN BÁSICA - EDUCACIÓ
1 1 1 1 ### 239861
###
382286
382489
372533
381253
384657
385957
375475
DOCUMENTOS EN FISICO
PROYECTOS
TRANSPORTE - TRANSPORTE TERRESTRE - VÍAS VECINALES
ISHPINCO
SANEAMIENTO - SANEAMIENTO - SANEAMIENTO RURAL
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE
Y ALCANTARILLADO EN EL SECTOR MOLINO N 01-ALTO, SECTOR 4/11/2017 BUSCAR (2017)
MOLINO N 02-BAJO Y MOLINO CENTRO, DISTRITO DE MOLINO -
PACHITEA - HUANUCO
CREACION DE LOS SERVICIOS DE AGUA POTABLE Y DISPOSICIÓN
SANITARIA DE EXCRETAS EN LAS LOCALIDADES DE HIERBA 10/26/2016 2016
BUENA, HARRIPON, JILLUPATA Y LADERA, DISTRITO DE MOLINO -
PACHITEA - HUANUCO
PERFIL: CONTRATO
DE SERVICIO DE
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. CONSULTORÍA
INTEGRADO N 32619 EN EL C.P. LA LINDA, DISTRITO DE MOLINO - - N°001-2017-
PACHITEA - HUANUCO MDM/A
(25/01/2017)
1 2
5 0
0 0
5 0
CUMENTOS EN FISICO VIABILIDAD SOSEM
BUSCAR (2017)
(EXP. TÉCNICO:
CONTRATO DE
CONSULTORÍA S/3,979,904.00 04/04/2017 ACTIVO NO
N°0010-2017-
MDM/A
(13/06/2017))
BUSCAR (2017)
(EXP. TÉCNICO:
CONTRATO DE
SERVICIO DE S/119,000.00 6/22/2017 ACTIVO SI
CONSULTORÍA
N°016-2017-
MDM/A
(02/10/2017))
BUSCAR (2017)
(EXP. TÉCNICO:
CONTRATO DE
CONSULTORÍA S/5,233,100.00 19/12/2016 ACTIVO SI
N°003-2017-
MDM/A
(14/03/2017))
EXP. TÉCNICO
(2017)
EXP. TÉCNICO
(2017)
EXP. TÉCNICO
(2017)
EXP. TÉCNICO
(2017)
EXP. TÉCNICO
(2017)
3 4 5 6 7
0 5 5 0 0
2 2 2 1 0
2 7 7 1 0
APROBACION DE EXP. TECNICO EJECUCION DE OBRA
- NO POR CONTRATA
- NO POR CONTRATA
NO POR CONTRATA
NO POR CONTRATA
RA Y DEPORTE
ADMINISTRACION
INDIRECTA -
S/398,947.26 NO ASOCIACIÓN PUBLICA
PRIVADA(APP)
S/5,488,507.28 N0 POR CONTRATA
8 9 10 11 12
5 4 24716908.3 24841963.76 0
1 0 7028241.38 7011604.51 0
6 4 31745149.7 31853568.27 0
ON DE OBRA COSTO DE OBRA Y CONTRATOS
S/25,000.00
S/7,000.00
S/25,000.00
S/15,000.00
13 14 15
0 0 0
0 0 0
0 0 0
S
INVERSION TOTAL
S/2,655,518.76
CODIGO
SNIP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 1 1 1 ### 265757
###
383799
384803
327440
328927
PROYECTOS
TRANSPORTE - TRANSPORTE TERRESTRE - VÍAS VECINALES
ISHPINCO
EDUCACIÓN - EDUCACIÓN BÁSICA - EDUCACIÓN PRIMARIA
PERFIL: CONTRATO
DE SERVICIO DE
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. CONSULTORÍA
INTEGRADO N 32619 EN EL C.P. LA LINDA, DISTRITO DE MOLINO - - N°001-2017-
PACHITEA - HUANUCO MDM/A
(25/01/2017)
1 1
0 0
1 1
CUMENTOS EN FISICO VIABILIDAD SOSEM
AL Y COMUNAL
ACTIVO (EN
EXP. TÉCNICO S/200,000.00 - FORMULACION - NO
(2017) EVALUACION)
CIONES EN RIESGO
BUSCAR (2017)
(EXP. TÉCNICO:
CONTRATO DE
CONSULTORÍA S/213,222.77 7/9/2015 ACTIVO NO
N°0011-2017-
MDM/A
(13/06/2017))
BUSCAR (2017)
(EXP. TÉCNICO:
CONTRATO DE
CONSULTORÍA S/242,487.73 7/22/2015 ACTIVO NO
N°0012-2017-
MDM/A
(13/06/2017))
1 7 7 0 0
1 1 1 0 0
2 8 8 0 0
APROBACION DE EXP. TECNICO EJECUCION DE OBRA
RA Y DEPORTE
7 0 956059.36 1067760.84 0
1 0 165002.95 165002.95 0
8 0 1121062.31 1232763.79 0
ON DE OBRA COSTO DE OBRA Y CONTRATOS
S/6,500.00
S/6,500.00
0 0 0 3
0 0 0 0
0 0 0 3
ONTRATOS
INVERSION TOTAL
S/165,002.95
CODIGO
SNIP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16
1 371186
239861
265757
PROYECTOS
TRANSPORTE - TRANSPORTE TERRESTRE - VÍ
382286
383799
372533
381253
384657
384803
327440
328927
VIVIENDA Y DESARROLLO URBANO - DESARRO
385957
375475
PROYECTOS
TRANSPORTE - TRANSPORTE TERRESTRE - VÍAS VECINALES
ISHPINCO
SANEAMIENTO - SANEAMIENTO - SANEAMIENTO RURAL
MEJORAMIENTO Y AMPLIACION DEL SISTEMA DE AGUA POTABLE
Y ALCANTARILLADO EN EL SECTOR MOLINO N 01-ALTO, SECTOR 4/11/2017 BUSCAR (2017)
MOLINO N 02-BAJO Y MOLINO CENTRO, DISTRITO DE MOLINO -
PACHITEA - HUANUCO
PERFIL: CONTRATO
DE SERVICIO DE
MEJORAMIENTO DE LOS SERVICIOS EDUCATIVOS DE LA I.E. CONSULTORÍA
INTEGRADO N 32619 EN EL C.P. LA LINDA, DISTRITO DE MOLINO - - N°001-2017-
PACHITEA - HUANUCO MDM/A
(25/01/2017)
PERFIL:
PERFIL: CONTRATO
CONTRATO DE
MEJORAMIENTO Y REHABILITACIÓN DE LA SUPERFICIE DE DE SERVICIO DE
SERVICIO DE
RODADURA DEL TRAMO: RUTA N°HU - 112, TRAYECTORIA CONSULTORÍA
CONSULTORÍA
HUARICHACA - EMPALME 18B (MOLINO), DEL DISTRITO DE N°014-2017-
N°014-2017-
MOLINO - PACHITEA - HUANUCO MDM/A
MDM/A (16/08/2017)
(16/08/2017)
L Y COMUNAL
ACTIVO (EN
EXP. TÉCNICO (2017) S/200,000.00 - FORMULACION - NO
EVALUACION)
EXP. TÉCNICO (2016) S/17,398,553.00 13/04/2017 ACTIVO NO
S - PREVENCIÓN DE DESASTRES
ONES EN RIESGO
- NO POR CONTRATA
NO POR CONTRATA
NO POR CONTRATA
S/25,000.00
S/6,500.00
S/6,500.00
S/7,000.00
S/25,000.00
S/15,000.00
Y CONTRATOS
CONTRATO
INVERSION TOTAL ELABORACION DE
LIQUIDACION DE OBRA
- -
S/2,655,518.76 -
S/165,002.95 FALTA