Escolar Documentos
Profissional Documentos
Cultura Documentos
PCV PCV
BLANKETING FUEL GAS 4114
PR-FD-0009
FLAME ARRESTOR
@SAFE LOCATION
NOTE 1
PV
FQI
FC XV
134-T-01-A
SDV SDV 3402 3402
4,2 KM
4114
TO TANKER
NOTE 2
CAPACITY : 300,000 BBL
134-P-01 A
SDV
OPF BIL CONDENSATE PIPELINE MASPION JETTY HEAD
134-P-01 B
PRESSURE BARG 3.45 MIN 3.45 3.45 3.45 3.45 3.45 3.45
134-P-03 RVP. BARA 0.69 MAX 0.69 0.69 0.69 0.69 0.69 0.69
WATER CONTENT. %-VOL 0.5 MAX 0.00 0.00 0.00 0.00 0.00 0.00
PCV PCV
PV
134-T-01-B
FC PV FC OFF SPEC CONDENSATE
TO LIQUID SEPARATOR
SDV
SDV
PR-FD-0002
CAPACITY : 6000 BBL
132-V-01
134-P-02 A
SDV
134-P-02 B
AS BUILT
HESS
HESS AMERADA HESS (INDONESIA-PANGKAH) LIMITED
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 6 UPD-IJ-P1-PR-FD-1036
SINGLE TURBINE METER IS PROVIDED FOR CUSTODY TRANSFER AND LOCATED AT OPF
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 3 UPD-IJ-P1-PR-FD-1033 D1 APPROVED FOR DESIGN 10/05/06 ASW KAW HJA DT BSM 12/14/06
PROJECT TITLE :
STREAM 3403 INDICATES THE PRESSURE OF THE STABILIZED CONDENSATE AT LOADING FLANGE CONNECTION. UJUNG PANGKAH DEVELOPMENT
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 2 UPD-IJ-P1-PR-FD-1032 D APPROVED FOR DESIGN 06/13/05 ASW KAW HJA DT BSM 06/13/05
ONSHORE PROCESSING FACILITY
DATA TAKEN FROM STREAM 3403 (CASE 6 DATA ARE ESTIMATED FROM STREAM3403 )
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 1 UPD-IJ-P1-PR-FD-1031 C1 ISSUED FOR APPROVAL 05/30/05 ASW KAW HJA DT
DWG. SIZE
A1
TITLE:
LEGEND SHEET (SHEET 3 OF 3) UPD-IJ-P1-PR-FD-0001-04 C ISSUED FOR REVIEW 14/13/05 ASW KAW HJA DT