Você está na página 1de 1

Created by Unlicensed Version

PCV PCV
BLANKETING FUEL GAS 4114

PR-FD-0009
FLAME ARRESTOR
@SAFE LOCATION

NOTE 1
PV

FQI

FC XV
134-T-01-A
SDV SDV 3402 3402
4,2 KM
4114
TO TANKER
NOTE 2
CAPACITY : 300,000 BBL

134-P-01 A
SDV
OPF BIL CONDENSATE PIPELINE MASPION JETTY HEAD

134-P-01 B

3307 CONDENSATE SPECIFICATION (NOTE 3)

PR-FD-0009 PARAMETER SPEC CASE 1 CASE 2 CASE 3 CASE 4 CASE 5 CASE 6

PRESSURE BARG 3.45 MIN 3.45 3.45 3.45 3.45 3.45 3.45

134-P-03 RVP. BARA 0.69 MAX 0.69 0.69 0.69 0.69 0.69 0.69

WATER CONTENT. %-VOL 0.5 MAX 0.00 0.00 0.00 0.00 0.00 0.00

PCV PCV

Created by Unlicensed Version


FLAME ARRESTOR
@SAFE LOCATION

PV

134-T-01-B
FC PV FC OFF SPEC CONDENSATE
TO LIQUID SEPARATOR
SDV
SDV
PR-FD-0002
CAPACITY : 6000 BBL

132-V-01

134-P-02 A
SDV

134-P-02 B

AS BUILT

HESS
HESS AMERADA HESS (INDONESIA-PANGKAH) LIMITED
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 6 UPD-IJ-P1-PR-FD-1036

H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 5 UPD-IJ-P1-PR-FD-1035


PT INTI KARYA PERSADA TEHNIK
NOTES : H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 4 UPD-IJ-P1-PR-FD-1034 D2 FINAL UPDATE 05/31/07
ENGINEERING & CONSTRUCTION

SINGLE TURBINE METER IS PROVIDED FOR CUSTODY TRANSFER AND LOCATED AT OPF
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 3 UPD-IJ-P1-PR-FD-1033 D1 APPROVED FOR DESIGN 10/05/06 ASW KAW HJA DT BSM 12/14/06
PROJECT TITLE :
STREAM 3403 INDICATES THE PRESSURE OF THE STABILIZED CONDENSATE AT LOADING FLANGE CONNECTION. UJUNG PANGKAH DEVELOPMENT
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 2 UPD-IJ-P1-PR-FD-1032 D APPROVED FOR DESIGN 06/13/05 ASW KAW HJA DT BSM 06/13/05
ONSHORE PROCESSING FACILITY
DATA TAKEN FROM STREAM 3403 (CASE 6 DATA ARE ESTIMATED FROM STREAM3403 )
H&M BALANCE : CONDENSATE STORAGE & TRANSFER CASE 1 UPD-IJ-P1-PR-FD-1031 C1 ISSUED FOR APPROVAL 05/30/05 ASW KAW HJA DT
DWG. SIZE
A1
TITLE:
LEGEND SHEET (SHEET 3 OF 3) UPD-IJ-P1-PR-FD-0001-04 C ISSUED FOR REVIEW 14/13/05 ASW KAW HJA DT

PROCESSING FLOW DIAGRAM


LEGEND SHEET (SHEET 2 OF 3) UPD-IJ-P1-PR-FD-0001-03 B RE-ISSUED FOR INTERNAL REVIEW 04/08/05 ASW KAW HJA DT
SCALE: CONDENSATE STORAGE AND TRANSFER
NONE
LEGEND SHEET (SHEET 1 OF 3) UPD-IJ-P1-PR-FD-0001-02 A ISSUED FOR INTERNAL REVIEW 03/23/05 ASW KAW HJA DT

JOB NO. DRAWING NO. REV.


GENERAL NOTES REFERENCE DOCUMENTS DOCUMENT NO. REV DESCRIPTION DATE BY CHECK RVD APPD CLIENT DATE 02020 UPD-IJ-P1-PR-FD-0007-D2 02

Created by Unlicensed Version