Você está na página 1de 1

12 11 10 9 8 7 6 5 4 3 2 1

NOTES:-

8000
1. ALL DIMENSIONS ARE IN MM AND LEVELS ARE IN MT
2. ALL DIMENSIONS ARE TO BE READ NOT TO BE MEASURED
3. THIS DRAWING IS TO BE READ IN CONJUNCTION WITH ALL OTHER
RELEVANT DRAWING ALSO ELECTRICAL & MECHANICAL DRGS.
4. ALL PLAIN AND REINFORCED CONCRETE SHALL CONFORM TO IS 456-2000.

1024 1632 1335 1665 1200 1145 5. CEMENT FOR ALL R.C.C. WORK TO BE 53 GRADE ORDINARY PORTLAND CEMENT.

6. CLEAR COVER TO MAIN REINFORCEMENT UNLESS NOTED SHALL BE AS FOLLOWS.

RAFT AND FOOTING 50mm. R.C.C. SLAB 20mm.


COLUMNS 40mm. R.C.C. LINTEL 15mm.
BEAMS & TIE BEAMS 25mm. R.C.C. WALL 40mm.

7. ALL STRUCTURE SHALL BE IN M25. GRADE OF CONCRETE

630 8. P.C.C. WORK SHALL BE 100MM THICK IN M15.


9. # INDICATE TMT CRS STEEL (Fe 415) CONFORMING TO IS 1786. (LATEST ISSUE)
10. LAP LENGTH AS PER TABLE. FOR HORIZONTAL STEEL IN DIRECT TENSION (WET

1600
WELL)SHALL BE 2 X LD
11. ALL CONCRETE SHALL BE CURED AS PER IS 456-2000
12. IN COLUMNS WHERE VERTICAL BARS ARE LAPPED THE STIRRUPS
SHALL BE HALF THE SPACING THAN SPACING SPECIFIED IN DESIGN.
13. LAPS IN COLUMNS SHALL BE STAGGERED BY 1.5 X LD
14. MAXIMUM 50% BARS SHALL BE LAPPED AT LOCATION
15. CENTERING OF CANTILEVER CHAJJA, SLAB BEAM SHALL BE REMOVED
ONLY AFTER CONSENT FROM ENGINEER IN CHARGE IS OBTAIN.

16. NUMBER OF BAR SHOULD NOT BE COUNTED BUT SPACING INDICATED SHALL
BE ADOPTED.

TESTING REPORT.
18. IF WATER TABLE IS OBSERVED AT THE TIME OF EXCAVATION, IT SHOULD BE
BROUGHT TO THE NOTICE OF DESIGN ENGINEER, IMMEDIATELY.

19. PROVIDE 6 MM THICK FULLY FILLET WELD


20. FOR PIPE OPENING IN RCC WALL, CUT OUT SHALL BE PROVIDE AS PER SIZE,
230 LINE AND LVL. OF PIPE DURING CONSTRUCTION OF RCC WALL.

DEVELOPMENT LENGTH FOR TENSION


BAR (Ld+10db)MM
8# - 4NOS

2800
DIA. OF GRADE OF CONCRETE
4741
6000

BAR M-25
8 400

8#@150C/C 10
12
500
600
16 800
20 1025
25 1275
32 1625

BRICK WALL
230mmTHK

3000
350

1600
1 1 450
PCC
629

100mmTHK
SECTION A-A

20mm GROOVE IN FLOORING

PLAN FOR DG FOUNDATION

8000
125mm THK.
COPING 125mm THK SLAB in COPING SEALER SLAB
M20

75mm THK. PCC IN M10 75mm THK.


WELL COMPACTED P.C.C IN M10 20mm GROOVE REV. DATE DESCRIPTION
TYPICAL GROOVE DETAILS
EARTH FILLING
REFER SECTION 'A' REFER SECTION 'A' KARNATAKA URBAN WATER SUPPLY AND
CLIENT
DRAINAGE BOARD

VENU CONSULTANTS PVT.LTD


STRUCTURE Ahmedabad
CONSULTANT Ph No :- 9427571242
info@venuconsultants.com

SECTION 1-1 CONTRACTOR


OASIS EPC SOLUTIONS LTD
A-401, Commerce House 5,
Near Vodafone House,
Corporate Road, Makarba, Ahmedabad
380051.

PROJECT 20 MLD STP AT CHIKKAMAGALURU

TITLE STRUCTURAL LAYOUT OF DG PLATFORM


DRAWN BY :- C.P.N PROJECT SHEETS
DRAWING NO SCALE
CHKD BY :- P.M.M NO NO
APPD BY :- AS
2018-19/67 2018-19/67/STR-02 01/01
DATE :- 19/01/2019 SHOWN
12 11 10 9 8 7 6 5 4 3 2 1