BILL OF QUANTITY (BO

PEMBANGUNAN JARINGAN DISTRIBUSI GAS BUMI UNTUK RUMAH TANGGA D


No Pekerjaan
1 Pekerjaan Persiapan
1 Verifikasi Calon Pelanggan
2 Survey Konstruksi
3 Pembersihan Lahan
4 Test Pit
5 Direksi Kit (Min.125 M2)
6 Papan Nama proyek
7 Barricade pengaman (daerah cross section)
8 Traffic Signage / Rambu-2 Jalan
9 Sewa Gudang
10 Penyusunan Hazan Hazid
11 Welder Performance Tes
12 OperatorPerfonnance Tes (PE)
13 Production Test
TOTAL I

No Pekerjaan
2 Procurement
1 PIPA CS4"
a. Pipa :
4", API SL Gr.8, PSL 2, ERW /LSAW,Sch 40, DRL (L=12m), 3LPE, t=2mm
b. Fitting:
Flanges 4 inch ANSI 300 RF
Blind Flange 1"
Split tee 6" x 4"
Elbow 90 deg Size 4"
Elbow 45 deg Size 4"
Gasket, Stud Bolt & Nut
c. Valve:
Ball Valve, 4" API 60, #300, full bore, trunnion mounted, double piston
A350LF2, Lever Onerated, snlit bodv
Ball Valve, 1" API 60, #300, full bore, trunnion mounted, double piston
A350 LF2, Lever Onerated, snlit body
d. Insulation Joint ANSI 300 4"

2 PIPA PE
a. Pipa 80 SOR 11 Dia 180 mm
1 Pipa PE 80 SDR 11 Diameter 180 mm
2 Fitting :
Elbow 90, PE 80/100 SOR 11 ISO 4437
Elbow 45, PE 80/100 SOR 11 ISO 4437
Tee Equal, PE 80/100 SOR 11 ISO 4437
End Cap, PE 80 SOR 11 ISO 4437
Coupler, PE 80 SOR 11 ISO 4437
Flange Adaptor 180 MM x 4"
Flange Adaptor 180 MM x 2 "
Flange Adaptor 63 MM x 2"
3 Valve
Ball Valve, compact design,Floating Ball, full bore, PE 80 SDR 11
(Isolated/Future Valve)
4 Pipa Casing :
Pipa Casing Galvanis 8"

b. Pipa PE 80 SDR 11 Diameter 63 mm


1 Pipa PE 80 SDR 11 Diameter 63 mm

2 Fitting :
Elbow 90, PE 80 SOR 11 ISO 4437
Elbow 45, PE 80 SOR 11 ISO 4437
Tee Equal, PE 80 SDR 11 ISO 4437
End Cap, PE 80 SOR 11 ISO 4437
Coupler, PE 80 SOR 11 ISO 4437
3 Pipa Casting :
Pipa Casting Galvanis

3 MRS (G 160) 4/4


Insulation Joint
Pressure Gauge D4" Stainless steel 1/2" BSPG V/0 - 40 Barg
2 way gauge valves
Full Bore Valve Leve Operated
Ball Valve, Floating, Full Bure, Level Operated
Catridge Filter QOC Efficiency 5 Micron Complete w/1/4" DP connection
& 3/4" drain vall valve
DPI 0 - 600 mbar + 5 way Manifold
Drain Valve Bar Stock
Pressure Gauge D4" Stainless steel 1/2" BSPG V/0 - 6 Barg Or 0 - 10 Barg
Ball Valve, Bar Stock, FF ISO 771
Check Valve ASTM A 216 galvanized carbon steel body, metal disk w/
NEIR Sealing wafer connection
Ball Valve, Floating, Full Bure, Level Operated
complete w/ CEE pproval, Max, flow 250 mch Min. 8 mch. Mx operating
Pressure 16 Bar complete w/ LF Pulse emiitercarbon steel body flangged
end connection
Straightening Vane
Volume Corrector w/ RTD PT 1100, Serial RS 232 Protocols Modbus,
Battery Life 7,5 yrs (EN 12405)
Needle Valve Female dia 1/2 NPT
Thermowell
Temperature Indicator adjustable angle, Range 0 - 167 deg F, complete
Thermowell
Flexible Pipe
Painted Carbon Steel, carbon wall thickness 2 mm ventilation area equal to
1/10 of covered area color green
Skid Mounted Piping
Reducer 4" x 3"
Kabinet

4 RS
Cabinet RSI
Ball Valve CS 2"
Regulator
PSV ( Pressure Safety Valve ) + Venting 1/2"
Pressure Safety Valve
Assesoris RS (termasuk fitting, delivery, pemasangan dll)
TOTAL II

III KONSTRUKSI (SNI 3474/ANSI B 31.8)


1 PIPA CS
1.1. Pekerjaan Pipa
a. Pemotongan pipa 4"
b. Bevelling pipa 4"
c. Welding c/w tie-in, production test
d. Field Joint Coating
e. NDT
f Holiday Test
g Pekerjaan pemasangan Anoda Korban
Pekerjaan pembuatan dan pemasangan CP test Box (include pondasi beton
Pekerjaan pemasangan Anoda Korban
Pekerjaan penyambungan test Box, junction box dan anoda dengan las
exothermic
Pekerjaan Pembuatan dan pemasangan junction box
h Pekerjaan Open Cut
Pekerjaan pembongkaran Jalur Pipa aspalt Hot Mix tebal 5 - 10 cm
(termasuk galian)
i Pekerjaan Stringing & Lowering Pipa CS dia. 4"
j Pekerjaan Perbaikan Galian Asphalt Hot Mix
k Marker Tape
Pekerjaan Manual Boring Pipa CS dia 4" (termasuk entry/exit pit dan
l reinstatement)
m Pekerjaan Box Valve Pipa CS 4"
n Papan Nama Jalur Gas
o Pekerjaan Patok Gas
1.2. Pekerjaan Khusus :
Hot Tap Pipa 6"-4"

2 PIPA PE 180 MM (SNI 13-3507-1994)


a. Pekerjaan Penggelaran Pipa
b. Pekerjaan Penyambungan Pipa PE Butt Fusion
c. Pekerjaan Penyambungan Pipa PE Electro Fusion
Pekerjaan Manual Boring Perlintasan Jalan Pipa (termasuk penyambungan
d. pipa dan casing, aksesoris, entry/exit pit dan reinstatement)
e. Pekerjaan Open Cut :
- Pekerjaan pembongkaran Jalur Pipa Lapisan Hot Mix tebal 6 - 10 cm
(termasuk Galian)
f Pekerjaan Lowering Pipa
g Pekerjaan Perbaikan termasuk pengurugan Pipa
- Jalan Aspal Hot Mix tebal 5 - 10 cm
h Concrete Slab Pengaman Pipa (setiap 0.4 m)
i Marker Tape
j Pekerjaan Box Valve Pipa PE
k Papan Nama Jalur Gas
l Pekerjaan Patok Gas B

3 PIPA PE 63 mm
a. Pekerjaan Penggelaran Pipa
b Pekerjaan Penyambungan Pipa PE Electro Fusion
Pekerjaan Manual Boring Pelintasan Jalan Pipa (termasuk penyambungan
c pipa dan casing, aksesoris, entry/exit pit dan reinstatement)
d Pekerjaan Open Cut :
- Pekerjaan pembongkaran Jalur Pipa Lapisan Hot Mix tebal 6 ≤ 10 CM
(termasuk Galian)
- Pekerjaan pembongkaran Jalur Pipa Jalan Tanah (termasuk Galian)
- Pekerjaan pembongkaran Jalur Pipa Rabat Beton (termasuk Galian)
- Pekerjaan pembongkaran Jalur Pipa Lapisan aspal Hot Mix tebal sd 5
Cm (termasuk Galian)
e Pekerjaan Lowering Pipa
f Pekerjaan Perbaikan Jalur Pipa :
- Jalan Hotmix 6 ≤ 10 cm
- Jalan Tanah
- Jalan Rabat Beton
- Jalan Aspal Hotmix ≤ 5 cm
g Concrete Slab Pengaman Pipa (setiap 0.4 m)
h Marker Tape
i Pekerjaan Box Valve Pipa PE
j Pekerjaan Patok Gas A
k Pekerjaan Patok Gas B

4 MRS
a Pondasi, Pagar Pengaman dan Lantai Paving Block
b Marka Tanda MRS
c Perbaikan / Rekondisi Lahan

5 RS
a Pondasi, Pagar Pengaman dan Lantai Paving Block
Marka Tanda RS
Perbaikan / Rekondisi Lahan
TOTAL III

PENGADAAN
IV DAN KONSTRUKSI SAMBUNGAN RUMAH (SR) DAN SAMBUNGAN KOMPOR (SK)
1 SAMBUNGAN RUMAH (SR) c/w Pengujian dan As Build Drawing

2 SAMBUNGAN KOMPOR (SK) c/w Pengujian dan As Build Drawing


TOTAL Iv

V PENGUJIAN
1 Pipa Induk (PE 180)
a Pembersihan / Flushing
b Pneumatic Test
c Nitrogen Purging and Filling
2 Pipa Distribusi (PE 63)
a Pembersihan / Flushing
b Pneumatic Test
c Nitrogen Purging and Filling

3 PIPA CS
a Cleaning & Hydrotest
b Dewatering, Swabing, Drying
c Nitrogen Purging
TOTAL V

TOTAL SEBELUM PPN


PPN
TOTAL
VI PEMERIKSAAN TEKNIS (At cost)

VII PENGURUSAN PERIZINAN (At cost)

TOTAL AT COST
TOTAL KESELURUHAN
PEMBULATAN
BILL OF QUANTITY (BOQ)
UNTUK RUMAH TANGGA DI KOTA MEDAN TAHUN 2018
Unit Vol Harga Satuan(x1000) Total Harga(x1000)

Unit Rp -
Meter Rp -
Meter 636.36 Rp -
Titik 4 Rp -
LS 1 Rp -
Buah 1 Rp -
Buah 50 Rp -
Buah 12 Rp -
LS 1 Rp -
LS 1 Rp -
joints 1 Rp -
orang 7 Rp -
joints 1 Rp -
Rp -

Meter 375 Rp - RAB Penajam

buah 3
buah 2
buah 1
buah 2
buah 2
buah 4

Buah 1

Buah 1
Buah 1

Meter 3949 Rp - rab serang

Buah 7 Rp -
Buah 1 Rp -
Buah 6 Rp -
Buah 1 Rp -
Buah 90 Rp - rab balikpapan
Buah 1 Rp - rab serang
Buah 6 Rp - rab serang
Buah 6 Rp - serang

Buah 7 Rp -

Meter 68 Rp - rab balikpapan

Meter 59312 Rp -

Buah 39 Rp -
Buah 66 Rp -
Buah 60 Rp -
Buah 456 Rp -
Buah 1169 Rp -

Meter 344 Rp -

LS 1 Rp - rab penajam
LS 6 Rp -

Rp -

joint 35
joint 35
joint 35 Rp - rab penajam
joint 35 Rp - rab penajam
joint 35 Rp - rab penajam
meter 375 Rp - rab penajam

buah 1
buah 2

buah 1
buah 1

Meter 369
Meter 369 Rp - rab penajam
meter 369
Meter 369 Rp - rab penajam

Meter 6
Buah 1 Rp - rab penajam
buah 1 Rp - rab penajam
Buah 8 Rp - rab penajam

LS 1

Meter 3949.000
Joints 240
Joints 112

Meter 68
Meter 3881
Meter 3881

Meter 3881
Buah 9703
Meter 3881
Buah 7
Buah 7,00
Buah 40

Meter 59312 Rp - rab penajam


Sambungan 3881 Rp - rab penajam

Meter 344 Rp - rab penajam

Meter 2677
Meter 1545
Meter 29001

Meter 29599
Meter 58968 Rp - rab penajam

Meter 2677
Meter 1545
Meter 29001
Meter 25599
Buah 147.42
Meter 58968
Buah 7
Buah 16
Buah 573

LS 1 Rp - rab penajam

LS 6 Rp - rab penajam

Rp -

Set 5000 Rp - rab balikpapan

Set 5000 Rp - rab balikpapan


Rp -

Meter 3949
Meter 3949
Meter 3949

Meter 59312
Meter 59312
Meter 59312

Meter 375
Meter 375
Meter 375
0

N Rp -
Rp -
Rp -
LS 1 Rp -

LS 1 Rp -

Rp -
AN Rp -
BILL OF QUANTITY (BOQ)
PEMBANGUNAN JARINGAN DISTRIBUSI GAS BUMI UNTUK RUMAH TANGGA DI KOTA DE

NO PEKERJAAN UNIT

1 PEKERJAAN PERSIAPAN
1.1 Verifikasi Calon Pelanggan Unit
1.2 Survey Konstruksi Meter
1.3 Pembersihan Lahan Meter
1.4 Test Pit Titik
1.5 Papan Nama Proyek Buah
1.6 Direksi Kit (Min. 125 M2) LS
1.7 Barricade pengaman (daerah cross section) Buah
1.8 Traffic Signage/Rambu - 2 Jalan Buah
1.9 Sewa Gudang Ls
1,10 Penyusunan Hazop Hazip Ls
1.11 Welder Performance Tes (Pepiline) Joints
1.12 Operator Performance Tes (PE) Orang
1.13 Production Tes Joints
Total I

2 PENGADAAN MATERIAL
2.1. PIPA CS
2.1.1. Pipa :
2.1.1.1. 6", API 5L Gr.B.PSL 2, ERW/LSAW,Sch 40,DRL (L=12m),3L Meter
2.1.1.2. 4", API 5L Gr.B.PSL 2, ERW/LSAW,Sch 40,DRL (L=12m),3L Meter
2.1.2. Fitting :
2.1.2.1. Flanger 6 inch ANSI 300 RF buah
2.1.2.2 Flanger 4 inch ANSI 300 RF buah
2.1.2.3. Blind Flange 6 inch ANSI 300 RF for FC buah
2.1.2.4. Blind Flange 1 inch ANSI 300 RF for Venting buah
2.1.2.6. Elbow 90 deg Size 6" buah
2.1.2.7. Elbow 45 deg Size 6" buah
2.1.2.6. Elbow 90 deg Size 4" buah
2.1.2.7 Elbow 45 deg Size 4" buah
2.1.2.6 Weldolet 4 x 1 " buah
2.1.2.7. Gasket, Stud Bolt & Nut 6" set
2.1.2.6 Gasket, Stud Bolt & Nut 4" set
2.1.2.7 Gasket, Stud Bolt & Nut 1" set
2.1.2.6 Reducer Tee 6" x 4" set
2.1.3 Valve : Ball Valve, 6 " API 6D, #300, full bore, trunnion mounted,
2.1.3.1 Ball
double piston
Valve, 4 "A350 LF2,#300,
API 6D, Gearfull
Operated, Split body
bore, trunnion mounted, Buah
2.1.3.2 double piston A350 LF2, Lever Operated, Split body
Ball Valve, 1 " API 6D, #300, full bore, trunnion mounted, Buah
2.1.3.3 double piston A350 LF2, Lever Operated, Split body Buah
2.1.4 Insulation Joint ANSI 300. 4" Buah

2.2 PIPA PE
2.2.1 Pipa PE 80 SDR 11 Dia 180 mm
2.2.1.1 Pipa PE 80 SDR 11 Diameter 180 mm Meter

2.2.1.2 Fitting:
Elbow 90, PE 80/100 SDR 11 ISO 4437 Buah
Elbow 45, PE 80/100 SDR 11 ISO 4437 Buah
Tee Equal, PE 80/100 SDR 11 ISO 4437 Buah
End Cap, PE 80/100 SDR 11 ISO 4437 Buah
Coupler, PE 80/100 SDR 11 ISO 4437 Buah
Flange Adaptor 180 MM x 4 " Buah
Flange Adaptor 180 MM x 2 " Buah
Flange Adaptor 63 MM x 2 " Buah
2.2.1.3 Valve :
Ball Valve, compact design, Floating Ball, full
bore, PE 80 SDR 11 (Isolated/Future Valve) Buah
2.2.1.4 Pipa Casting :
Pipa Casting Galvanis 8" Meter

2.2.2 Pipa PE 80 SDR 11 Diameter 63 mm


2.2.2.1 Pipa PE 80 SDR 11 Diameter 63 mm Meter

2.2.2.2. Fitting :
Elbow 90, PE 80/100 SDR 11 ISO 4437 Buah
Elbow 45, PE 80/100 SDR 11 ISO 4437 Buah
Tee Equal, PE 80/100 SDR 11 ISO 4437 Buah
End Cap, PE 80/100 SDR 11 ISO 4437 Buah
Coupler, PE 80/100 SDR 11 ISO 4437 Buah
2.2.2.3 Valve :
Ball Valve, compact design, Floating Ball, full
bore, PE 80 SDR 11 Buah
2.2.2.4 Pipa Casting :
Pipa Casting Galvanis 4 " Buah

2.3. MRS (G 160) LS


Insulation Joint D4" Stainless steel 1/2" BSPG V/0 - 40 Barg 2 way
Pressure Gauge
gauge valves Full Bore Valve Lever Operated
Ball Valve, Floating, Full Bore, Lever Operated Valve
DPI 0- 600 mbar = 5 way Manifold
Drain Valve
pressure BarD4"
Gauge Stock
Stainless steel 1/2" BSPG V/0- 6 Barg Or 0 - 10
Barg
Ball Valve,
Check ValveBar
ASTMStockA 216 galvanized carbon steel body, metal disk w
/ NEIR Sealing wafer connection
Ball
mch.Valve, Floating,Pressure
Mx operating Full Bore, Lever
16 Bar Operated
complete w Valve
/ LF Pulse
emiitercarbon steel body
Straightening
Volume Vanew / RTD PT 1100, Serial RS 232 Protocol Modbus,
Corrector
Battery Life 7.5 yrs (EN 12405)
Needle Valve Female dia 1/2 NPT
Thermowell
Tempertature Indicator adjustable angel, Range 0 - 167 deg F,
complete
FlexibleCarbon
Painted Pipe steel, carbon wall thickness 2 mm ventilation area
equal to 1/10 of covered area color green
Skid mounted Piping
Reducer 4" x 3"
Kabinet

2.2.4 RS LS
Cabinet RS
Ball Valve CS 4"
Redecer 4" x 2", CS
Regulator
PSV ( Pressure Safety Valve) + Venting 1/2"
Pressure Safety Valve
Assesoris RS ( termasuk fitting, delifvery,
pemasangan dll

3 KONSTRUKSI (SNI 3474/ANSI B 31.8)


3.1 PIPA CS
3.1.1 PIPA CS Ø 6"
a Pemotretan Pipa 6" Joint
b Beveling pipa 6" Joint
c Penyambungan Line Up Joint
d Penyambunga Tie In Joint
e Firld Joint Coating Joint
f NDT Joint
g Holiday Test Meter
h pemasangandan
Pekerjaan pembuatan Anoda Korban CP test Box (include
pemasangan
pondasi beton) buah
Pekerjaan pemasangan Anoda Korban buah
Pekerjaan penyambungan test Box, juntcion box dan Anoda den buah
Pekerjaan pembuatan dan pemasangan CP test Box buah
i Pekerjaan Open Cut
Pekerjaan Galian Pipa CS dia. 4' Tanah Meter
j Pekerjaan Stringing & Lowering Pipa XS dia. 4" Meter
k Pekerjaan Galian Tanah Meter
l Pekerjaan Galian Asphalt Hot Mix tebal 6-10 cm Meter
m marker tape
Pekerjaan Manual Boring Pipa CS dia 6" (termasuk entry/exit Meter
n pit dan reistaremen Meter
o Pekerjaan Box Valve Pipa CS 6" buah

3.1.2. PIPA Ø CS 4 "


a Pemotongan pipa 4 " Joint
b Beveling pipa 4 " Joint
c Penyambungan Joint
d Field Joint Coating Joint
f NDT Joint
g Holiday Test Meter
h Pekerjaan Openg Cut
Pekerjaan Galian Pipa CS dia, 4 " Meter
Pekerjaan Galian Pipa CS dia 4 " asphalt hotmix tebal 6-10
cm Meter
i Pekerjaan Stiring & Lowring Pipa CS dia. 4 " Meter
j Pekerjaan Manual Boring Pipa CS dia 4" (termasuk entry/exit p Meter
k Pekerjaan Galian Tanah Meter
l Marker Tape Meter
m Pekerjaan Box Valve Pipa XS 4" Buah

3.2 PIPA PE (SNI 13-3507-1994)


3.2.1. PIPA PE 180 MM
a Pekerjaan Penggelaran Pipa Meter
b Pekerjaan Penyambungan Pipa PE Butt Fusion Joint
c Pekerjaan Penyambungan
penyambungan Pipa PEaksesoris,
pipas dan casing, Electro Fusion
entry/exit pit dan Joint
d reinstatement Meter
e Pekerjaan Pembongkaran Jalur Pipa Termasuk Galian
Jalan Aspal HotMix 6-10 cm Meter
Jalan Aspal HotMix 3-5 cm Meter
Jalan Rabat Beton Meter
Jalan Tanah Meter
f Pekerjaan Lowring Pipa Meter
h Pekerjaan Perbaikan termasuk Pengurungan Jalur Pipa
Jalan Aspal HotMix 6-10 cm Meter
Jalan Aspal HotMix 3-5 cm Meter
Jalan Beton Meter
Jalan Tanah Meter
i Concrete Sleb Pengaman Pipa (setiap 0.4) Buah
j Marker Tape Meter
k Pekerjaan Box Valve Pipa PE Buah
l Papan Nama Jalur Gas Buah
m Pekerjaan Patok Gas B Buah

3.2.2 PIPA PE 63 mm
a Pekerjaan Penggelaran Pipa Meter
b Pekerjaan Penyambungan
penyambungan Pipa PEaksesoris,
pipa dan casting, Electro Fusion
entry/exit pit dan Sambungan
c reinstatement Meter
d Pekerjaan Pembongkaran Jalur Pipa termasuk Galian
Pekerjaan pembongkaran lapisan hot mix tebal 6 ≤ 10 Meter
Pekerjaan Pembokaran Jalan Tanah Meter
Pekerjaan Pembongkaran Jalan Paving Meter
Pekerjaan Pembongkaran Jalan Rabat Lap Beton Meter
Pekerjaan lapisan hot mix tebal ≤ 5 CM Meter
e Pekerjaan Lowering Pipa Meter
f Pekerjaan Perbaikan termasuk pengurungan jalur Pipa
Jalan Aspal Hot mix Tebal 6 ≤ 10 Meter
Pekerjaan lapisan hot mix tebal ≤ 5 CM Meter
Jalan Tanah Meter
Jalan Paving Meter
Jalan Rabat Beton Meter
g Concrete Slab Pengaman Pipa (setiap 0,4 ) buah
h Marker Tape Meter
i Pekerjaan Box Valve Pipa PE buah
j Papan Nama Jalur Gas buah
k Pekerjaan Patok Gas A buah
l Pekerjaan Patok Gas B buah

3.3 MRS LS
a Pondasi Pagar pengaman dan lantai Paving block
b Marka Tanda MRS
c Perbaikan/Rekondisi Lahan

3.4 RS LS
a Pondasi Pagar pengaman dan lantai Paving block
b Marka Tanda RS
c Perbaikan/Rekondisi Lahan

PENGADAAN DAN KONSTRUKSI SAMBUNGAN RUMAH (SR) DAN


4 SAMBUNGAN KOMPOR (SK)
4.1 SAMBUNGAN RUMAH (SR) (C/W Pengujian dan as build Drawing) LS

4.2 SAMBUNGAN KOMPOR (SK) (C/W Pengujian dan as Build Drawing) LS

5 PENGUJIAN
1 Pipa Induk (PE 180)
a Pembersihan/Flushing Meter
b Pneumatic Test Meter
c Nitrogen Purging and Filling Meter
2 Pipa Distribusi (PE 63)
a Pembersihan/Flushing Meter
b Pneumatic Test Meter
c Nitrogen Purging and Filling Meter

4 PIPA CS
a Cleaning & Hydrotes Meter
b Dewatering, Swabing, Drying Meter
c Nitrogen Purging Meter

TOTAL SEBELUM PPN


PPN
TOTAL DI LUAR ATCOST
## PEMERIKSAAN TEKNIS (At cost) LS
#
## PENGURUSAN PERIZINAN (At cost) LS

TOTAL ADCOST
TOTAL KESELURUHAN
PEMBULATAN
QUANTITY (BOQ)
AH TANGGA DI KOTA DELI SERDANG TAHUN 2018

VOL HARGA SATUAN TOTAL HARGA

-
-
1034 Rp -
4 Rp -
1 Rp -
1 Rp -
50 Rp -
12 Rp -
1 Rp -
1 Rp -
1 Rp -
9 Rp -
1 Rp -
Rp -

475

2
4
1
4
2
2
2
2
4
4
3
8
1

1
1
4
1
11.491 Rp -

12 Rp -
11 Rp -
8 Rp -
1 Rp -
249 Rp -
1 Rp -
7 Rp -
7 Rp -

7 Rp -

110 Rp -

91447 Rp -

100 Rp -
73 Rp -
295 Rp -
199 Rp -
1500 Rp -

7 Rp -

1 Rp -
7 Rp -

9
9
52 Rp -
54 Rp -
52 Rp -
475 Rp -

424
51
475 Rp -
14
424
13 Rp -
2 Rp -

11491
709
281
110

3284
3404
253
3901
11381

3824
3404
253
3901
28453
11381
7
7,00
39,00

91447 Rp -
2167 Rp -
233 Rp -

6543
27825
4347
24089
28.41
91214 Rp -

6543
28410
27825
4347
24089
228035
91214
7
92
238
1019

1 Rp -

6 Rp -

5000 Rp -

5000 Rp -

11491
11491
11491

91447
91447
91447

460
460
460

Rp -
Rp -
Rp -
1 Rp -

1 Rp -

Rp -
Rp -
SUMMARY BILL OF QUANTITY (BOQ
PEMBANGUNAN JARINGAN GAS BUMI UNTUK RU
PEMBANGUNAN JARINGAN GAS BUMI UNTUK RUMAH TANGGA DI KOTA M

No DESKRIPSI

I PEMBANGUNAN JARINGAN GAS BUMI UNTUK RUMAH TANGGA DI KOTA MEDAN


II PEMBANGUNAN JARINGAN GAS BUMI UNTUK RUMAH TANGGA DI KABUPATEN BOGOR
GRAND TOTAL (Termasuk Ppn 10%)
BILL OF QUANTITY (BOQ)
GAN GAS BUMI UNTUK RUMAH TANGGA
K RUMAH TANGGA DI KOTA MEDAN DAN KOTA DELI SERDANG

TOTAL HARGA X Rp 1000

Rp -
Rp -
Rp -