Você está na página 1de 1

METRO ENGINEERING WORKS Sheet No:__

SLAB DESIGN (TWO-WAY)


PROJECT :- STP DATE: 15-Feb-19
DEALT BY:- XXXXXXX
FILENAME METRO ENG WORKS
SLAB ID:- S1
fck N/mm2 30 S1
fy N/mm2 500 12@
Effective span Lx (ft.) 14.00 4.268 0.000 200
Effective span Ly (ft.) 26.00 7.927 0.000 12@
Slab Thk D (inch.) 16.0 406.4 0 360 12@
Effective Depth d. (mm.) 386.40 -20.00 180
LOADs 12@
Dead Load kN/m2 10.16 0 200
Live Load kN/m2 37.00
Floor Finish kN/m2 1.50 12@ 12@
Soil Filling kN/m2 0.00 200 400
Partition walls kN/m2 0.00
Others kN/m2 0.00
Total Load kN/m2 48.66 0.00 0
Factored kN/m2 72.99 0.00
d required. mm 176 0
d provided. mm 386 OK -20 Chek d
Ly/Lx Ratio : 1.86 #DIV/0! 0
Enter OPTION : 7 1 0
alpha x ( - ) & alpha x ( + ) 0.094 0.071 #DIV/0! #DIV/0!
alpha y ( - ) & alpha y ( + ) 0.000 0.043 0.032 0.024 0
α- Midsp Supts (α
Supts (α α- Midsp
MOMENT Calculation 2
)wl2 (α
α+)wl )wl2 α+)wl2

Moment Mux KN-m 124.43 94.03 #DIV/0! #DIV/0!
Mux/bd2 N/mm2 0.83 0.63 #DIV/0! #DIV/0! 0 0
Steel req. Pt. % 0.198 0.148 #DIV/0! #DIV/0!
Req. Astx mm2 765.6 573.7 #DIV/0! #DIV/0!
Try Spacing 10 φ mm 103 137 #DIV/0! #DIV/0!
or Try Spacing 12 φ mm 148 197 #DIV/0! #DIV/0!
Midsp 12 180
cranked 12 360 00
Provide Astx for
Astx extra Ast 451.31 #DIV/0!
Lx direction
Supts try Extraφ 12 251
pro Extra 12 200 0
Moment Muy KN-m 0.00 57.18 0.00 0.00
Muy/bd2 N/mm2 0.00 0.38 0.00 0.00
Steel req. Pt. % 0.000 0.089 0.000 0.000
Req. Asty mm2 0.0 345.4 0.0 0.0
Try Spacing 12 φ mm #DIV/0! 328 #DIV/0! #DIV/0!
or Try Spacing 10 φ mm #DIV/0! 228 #DIV/0! #DIV/0!
Midsp 12 200
cranked 12 400 00
Provide Asty for
Asty extra Ast -282.86 #DIV/0!
Ly direction
Supts try Extraφ 12 -400
pro Extra 12 200 0
DEFLECTION
Pt Provided @ Mid Lx % 0.16 #DIV/0!
Actual (Lx/d) 11.05 0.00
fs : 265 #DIV/0!
Modification Factor Mf : 2.00
Allowable (Lx/d) : 52.00 0.00
deflection O.K CHEK deflection