Você está na página 1de 1

TENDER DOCUMENT

Technical
TENDER DOCUMENT
Spacifications
Technical Spacifications

5.11.2.
3. 5.1.6.
3.6.
6.2.
7.2.
7.6.
11.1.
12.3.
Gene
PO W D
4.1.3.
5.1.6.
6.2.2.
8.1.4.EAccuracy
11.7.3. Some
delivery,
drawings,
This
month
r3.
Schedule
Molded
Nameplates
Type
Safety
CableR acrylic
document
any
shall
of
RM
OCUMENTS Tray
The and
MCCBs
All qu
E........................................................................................................................................
aspecifications:
lSR_Cable_Trays_Estimated_Quantities_Tender.xlsx
Accuracy
d)
Construction
Fault
Connection
policy
warranty
e-Minimum
the
they
Tolerance
custom
Tray
Case
AND Accumulated
adverse
auxiliary
-Adjustable
be
includes
iseverity
TE are
sheets
of
Design.
does
Between
Security
Support
re
armoring
sockets
ITEMS
R SR_Breakers_Cables_Tender.xlsx
SR_Breakers_Cables_Tender.xlsx
flexible
and
the
and
fittings
Circuit
Systems
m
shall
TO
S effect
nfunction
not
of
but
eshall
BE
ANactual
and
betmust
Maximum
time
operation
the
apply
Energy.
stranded
MDBs
not
will
on
System
s220
PROVIDED
D
be delay
violation
not
ratings
and
Breakers
ANA
equipped
all electrical
limited
for
mounted
faces
WITH be under
Values
and
terminals
THEcable
required
L
oftoon
with to:the
SMDBs
isbe
from
Y
armor
OFFER
Z..............................................................................
any
trays
the
performance.
aachieved
breakers,
shall
to
measure
circumstances
630and
Etripping
R
cable be be
2.3to
S
clamps cables
produced
after
trays permanently
power
for
for
forItboth
1000A,
unit
making
or the
for
Q1-SMDB,
the
shall
meters,
application
due
by
number
SR-MDB
independent
cable be
fastened
contactto
trayengraved
possible
the
any
Q2-SMDB,
ofof
withand
high
of
days
special
to
all
on
theRF-
toquantity
them of
theshall
thermo 19
Q3-37
Contents
11.3.
5.1.7.
1.11.4.
Gene D Control
delay
derating
tools
example.
r1. of be
SMDB
aEstimated
lplant
OCUMENTATION Power................................................................................................................................
breakers
MDB.
construction.
-supply
- case
supports. TO and Q4-SMDB.
Voltage
BE L-L
SUPPLIED FOR THE DESIGN REVIEW : ............................................................................. 19
38
5.1.8. U
All
For
The Cables
Display
the
NACCEPTEDThe
Cables
All
If, quantities
Power
operating
panels
RACTICES
All
equivalent
factors.
required used
repetition
implementation
power
within equipment
trays
1.Fischer
-for
24
powercables
directly,
toof
any
the
single
magnet Meter
asfor
must
cables
Sampling
THD
-The
months
Voltage
thoroughly or period
Material.
breaking
forrate
and
either
the of
whole
be
after
current
phase
L-N of
cable
especially
and
penalty.
kind
circuit
from
rather
of cable
amechanism
shall
connecting
isunits
supplied
touch
perforated
Site 18
threshold
atand
least
breaker
service
the
cable
they trays
comply
Acceptance
voltage,
laying 1000
upstream
connectors
electronic
cleaned must
one.tray
or
and shall
shall of
shall
under
safe
Weeks
cable
per
beand
with
the
SR-MDB
by
Test
operation,
be
the
angles
must
during
This phase be
or
atlocks,
comply
orfastened
auxiliary(SAT),
1.2
downstream
be
unit at
Schuko accessories,
molded-case
this
(if
custom
installation
will ANSI
capable
design,
tray
less.
Ithe
towith
itself,
tripthe with
and
any
BS
r keys,
type side C12.16
contract
withThefor5the
defects
the
metallic
and angles,
(CEE of please
circuit
withstanding
different
shall,
example
Contractor
cm
no-breaking
5467:1997,
gaskets, arise
BS
structure.
such
all7/3), load
or11.25°
switches,
as
sometimes
circuit-breaker
clamps for keep
and where
IEC61036
the
depth,
high and
shall be has in
breakers
MDBs mind Class
without
appropriate,
profile
to multiple
submit ofthat
shall
shall the these
hisbe
damage
..........................................................................................................................................
Pand .......................................................................................................................... of
19
38
bear
4.3.
7.9.
1. 11.5.
6.2.1.
5.1.9. SR-MDB General
Contractor
SUB-CONTRACTING
Remote and Responsibilities
RF-MDB 300 Technical Sector: Power 1.6 Supplies Group
onlyedge
nameplates
discovered
time
widths;
buttons, 
70° 1.
the-Control
include
comply
schedule.
6469:1984
Brass
MCCBs
known
value electricalgiving
samples/cycle.
adequately applicable)
threshold
the
Current type and............................................................................................................................
bends
with
addition
shall Communication
the
and
glands and
labels,
provide of reducer,
following
mechanical
for ratings,
auxiliaries..............................................................................................
armored
class estimating
requirements:
II shall
cables
insulation the
GENERAL.......................................................................................................................................................
stresses
operating produced
notand quantities
conditions,
increase
standard
(according by the for
fault
tomaker's
PVC all
volume
IEC other
conditions
for
60664-1 ofaccessories
name,
other the date 38
assumed
types 5
of
1.1. W
1.3.
5.2.
11.6. Introduction
Cleaning
All 20
ARRANTY
isLTs the :
The ..........................................................................................................................................
and MDBs are to be50mm. equipped with panel ofmounted power meters or 38
1.1.
3.1.
4.4.
11.7.
5.2.1. IA 1.themust
manufacture,
200mm-400mm
in
Cable standard)
for
Prepare
NTRODUCTION
SQ1-SMDB,
PECIFICS
TTACHED
of
and
as
The-contractor’s
fast
at
2.Hilti.
Reset
normal the
Individual
be
the
various
tightened
short-circuits
FORDRouting
D
-BS
IFFERENT
OCUMENTS
Power
circuit
after make
input
shapes
shop
of Tools.
course
German with
the
6899:1984
molded-case
Power Q2-SMDB,
Meter
of
2tocable
DFactor
responsibility.
and
like
number
hours the
event
following
steps
of
ensuretype an
at
usage
currents.
report
ISTRIBUTION
shall
panel
tray fast
logging
S,
(if
of
1.05
or
socket.
circuit
good in be
but
check
any),
The
Pincluding
Q3-SMDB
ANELS
, accurate
rbreak
any
equivalent
sizes, not
of
electrical
Ibreakers
electrical ofitless
voltage
below
size
breaking type.
and
the IEC
is
shallto
than
image.
type
parameters
above
contact.
construction
and will 1% Tripping
(ICU
spikes,
standards
essential
comply
Q4-SMDB
The
betogetherreading
=50KA)
dips
mentioned
The
carriededge
shall
that
method, and
that
with onmust
with
also
installation
out for
at a400
glitches
all
be
equipment,
comply
the
the
........................................................................................................................................
design metalin power
be
11.25°
general fault
volts.
shall
less for
bent
particulars
allowed
with
than and
in,shall
all
the
be
thickness,
............................................................................................
...........................................................................................................................
the
corners
rules 3from
and
such
10ms which
of be
be
that5
20
39
1.2. 4.3.1. power
For
Proposed
will
SSupplier Mechanical
only
aid the energy.
mechanically
the- control
Schedule-
phases.
I
identification
cables
above shall breaker. Cable
threshold
remedy
shall
mentioned
the Specifications
and (Milestones):
be
front data
for
the shall
utilized,the
defect arrangement:
cables
standards. be
future either
these a
adjustableperforated
ordering
must by be from
of
replacement
water spareaccording
cable
2 to
and 10 tray.
parts.
or times
dustby With
the
repair
proof.
...................................................................................................................................................
between and internal power circuits to7.5cm
thermal
on his document
load
setting
account. 5
1.6.
4.5.
Synchrotron-light
5.2.2. SESAME
AFETY
All
Voltage
11.7.1.Distribution
Power
prefabricated
metal
installation All
IEC-
there
MCCBs three
Total
is for
Drop m
Storage_Ring_Cable_Tray_Layout_18-02-2016.dwg
for Meter is no
a Panels phase
and
Real
shall
synchrotron
locations
and notconnector
Power
discontinuity
comprise
Cable for post
at light a
SESAME
Rating
The in shall
fabricated.
the
device,
source
AC be
return
must of
It
designed
under
Sockets isthe
be also
circuit CEE
to viatrip
construction
cleaned
Inside industrial
required the the
ofthe to
armoring type
prefabricate
circuit-breaker
inTunnel
all
LTs....................................................................................................................... Allan,
dirt according
and
and/or no
JORDAN,
(AUX1-
.................................................................. all
in
debristhe
local
20
it
analyzers
depth,
1.3.11.7.2.CFurther, is3. the
Voltage
all Real-time
-
according
independent Ir. thecontractor’s
SR_Breaker_Cables_Tender.xlsx
Instrumentation.
and
remainder current
toof monitoring
the the responsibility
shall
requirements
of operating
the be of
accurate
services andto
the
handle.and double
to power
0.5%
specifications
The
systems check
of analyzers
reading.
operating these
detailed
installed Frequency
including
below.
mechanism
at SESAME and
shall
shall add
graph be
9.
10.DeTe
livsetrianbglaesnd Commissioning
Experimental6.1.2.
4.4.1.
4.
Locations
LEANING
on
Standard
comprising
caused
Power39
coating,
CONDITIONS
Construction,
Milestone
SMDBScience
Mechanical
quantities
Power
the
The
All
to
60947
the
spot
by
The- And
and the
Analyzers outside
cables
painted
andaTotalor
main
Meter
addition
–routes
high
storage
and of
shall
1load display:
panels
and
Reactive
installation
for
AUX2-SMDB)
of the
bea
resistances.
MDBs ring
operation,
panel
Specifications
Storage
cable
motor
600/1000V
such
2cabling
or
of
calculation.
shall Power
or an any
be
tray,
as
standards Ring
mechanism
access
systems
Earthing
energy Design
related
environment
of
and
the
Electrical
rated. not
doors,
must
derived
the
offloor2.5
report
works inside
module
be
armoring
GeV Infrastructure
when
side
from
toshown
on
mounting
Week withthe
or
the
bedaily a
to cable
approved rotary
...............................................................................................................................................
angles of fitting must be used possible;
panel, aon etc.
latter
the
bases,
front
tray.
drawings.
main
circumference handle,
45˚,
must
(VDE
bythe
access,
Other
earth
SESAME.30˚,
have
0660;
failure
............................................................................................................. etc.,
Final 90˚.
an
ofelectrode
cubicle
shall
locations
133.2m;
to do 21 If 6a
at
so
20
6. 1.4.BREAKERS
D multiple
beESIGN
and not
the routesmetering
...................................................................................................................................................
-
earthing
IEC60309,representations
widths;
designed The
Peak
should AND time
100mm-350mm
todemand
S operate
TANDARDS
also
bewithdelay
known
shown over
current
allshallEthernet
poles
as be
with of
Commando
onprovidedshop selectable
steps
the of
circuit
drawings 50mmamong
connectors.breaker
in of 3 values,
simultaneously with
...........................................................................................................
coordination shallwith or forwithout
making, 6
5.1.
11.7.3.Requirements
Applications
2. incur
The
will
in the
Coordination BS4752;
event
the
maximum
pattern
Middle
supply
- penalties Total
East
UTE
of high-value
XLPE
Apparent
end
with
permissible
on 63120).
shall
other
the
or
Power
beVersions
short-circuit
contractors
voltage
contractor.
PVC insulated
complying
ofdrop currents.
on byMeV
SR_Breakers_Cables_Layout_Tender.xlsx...................................................................................
Booster-Synchrotron an energy 800
cables
asmeans
with
with
This
required
and UL
adevice
temperature
489shall
acircumference
metallic
by the be
bond also
codes
tolerance ofother
be
independent
of andadequate
38.4m
of
trades
latest
atonand
39
1.5. EM under
to whatever
Contract
QUIPMENT
required These
The
mask Raward:
warrantyATINGS
Identification
connection -
connection.
the isor
angle
SR_Cable_Trays_Estimated_Quantities_Tender.xlsx
avoid conflicts. Manufacturing
missing
molded-case month
accuracies
by
block to the
does in
device
of
the corescase
shall
circuit
Contractor
not
main beand
of
settings
fitshall
chassis
in Installation.
deviation
maintained
breakers
for
fully
the 12
comply
standard
with from
shall
for
months
a copperthe
0
both
be
with
fittings, specifications.
................................................................................................................................
actuated
light
after
B.S.
braid
then and
the by
cable
it full
SAT,
is a handle
possible the
specifically that
to
.................................................................. do used 6
40
4.2. VLow
6.1.
11.7.4.
12.4. IEE
aCables
OLDED site.
 C The
Tension
of - the C
Production
conductance
regulations
ASE
The
type, THD
IRCUITmolded-case
main
and BPanels
thermal-magnetic
Voltage
site
should
REAKERS
panel
Form-4 FROM circuit
1
andorganization
theL-L
not
shall and
internal100
bondingor
exceed
be TObreakers
3 of (LT1
630 the
separationA
electronic
shall (except
and
connection
4.0%, wall the LT3)
mounting for
shallcurrent-limiting
cable be
sizes
frontas should
short
access, and circuit
..................................................................................
trip
bedesign.
certifiedunit. to comply with be ISO
asselected
Form-1 9002 and
straight 21
as
1.6. 4.5.1.
11.7.4.
6.1.1. OLTAGE Mechanical
performance 4.
D ROP
loads.
clearly
5467; The
-cutting
AND Peak
constant
SR_AC_Cables_Estimated_Quantities_Tender.xlsx
SR_AC_Cables_Estimated_Quantities_Tender.xlsx
site for this C least
possibility
ABLE
purpose,
of R
demand I2tcable
Specifications
theATING
theto extract
contact
trays logged
tosupervising
point
accommodate data
must as CSV files or raw
..............................................................................................................
power
function. (kW) and peak demand apparent power
.....................................................................
be conductive
the requirements. and not insulated 217a
12. 3.7. 6.1.5.
5.1.1.
APPROVED 3.General
Design
Any
specified
Main
22 Send

MeV
Protection
 All-
violation .........................................................................................................................................
Review
breakers)
and
MCCBs,
Electrical
internal
General
Panel
MANUFACTURERS: the THD
accordingly.
Microtron. shop
routes
shall meeting
the
observeddrawings
functions
Requirements current
Voltage
Supply
be This
and
The
made Date:
L-N
by for
ratings
the
maximum the
14/02/2016
arrangements
machine
of hot construction
of
dipiswhich
voltage
scheduled
galvanized are
for 3to
Total
drop be
identical
engineerto is
cables
sheet approved
Number with
of
measured
deliver
steel are of by
the
SESAME
first
of Pages:
ratings
from
defined
beam
cubical
................................................................................................................... 5will
the of their
incur
supplying
end
patternin file
2016.
6.1.2.
2. 11.3. These SESAME.
5.Construction,
SCOPEDocumentation
OF All
WORKS are
No -the
indicates all
text. -14001 items
Instantaneous
(kVA)
annual 70°C.
the
Single-core:
operation,
screws and onenvironment
calibration
three the top of
protection
shall
fundamental
nuts the
should be
Black.items
threshold
required
positions:discussed
adjustable
to maintain
ON, in
OFF the
from
this
and previous
1.5
TRIPPED.tomentioned times of 407
11chapters
............................................................................................
satisfy load stress
.........................................................................................................................................
7.3.
11.7.
4.6. Any
Support
penalty
The
LT
This
Attachedpanels manufacturer
paint,
shall
trip
ISO
contractor
- SystemTHD this
belong
connected shall
SR_Breakers_Cables_Tender.xlsx
separation Documents to
is
Currentto
standards.
design. be
accepted
performto supplied
category the
Document all provided
Btests
power as for
type:definedthe
required that
transformer design
inthe
Specificationsby the cablesreview:
general
international
up-to production
therules standards.
final follows
served Theloads
6.1.3. DTesting
12.1. 4.2.1. the
4.
All 22 low
above
Mechanical
Installation
Submit
 Estimated
requirements.
ISTRIBUTION If - and
with
5.The
mentioned
can POther
accuracy. of
required,
ANELS
tensions
be n. Acceptance
main
-IEnergy LT1
samples
achieved
Specifications
Flexible,
than and
panel
the
standards
thatLT3
consumption.
quantities shall
circuit
for
electrical by all
at
non-armored
all
of
and
company
be of functionalities
other
cables
breaker
material
scraping the
works,
the
for
shall
samples
the usedwall
cables.
the
equipment bewhole
for
are
5
mounting
equipped
non-conductive the
accepted.
and
must
cable front
withberaceway
material
paint
access,
amaintained
.............................................................................................................................
rotary
and shall
Form-1
system
applying be
by the
suitable
a layer 40
local
equivalent
connected
specification MCCBs
above.
For
units,
AllThermal
-
Panel
vertical maximum
setup
to shall
Frequency
nothis
covers
shall with
Certificates
memory
be
rectangular ratings
ensure
parameters
lesspanel. safety,
than
the
made If 0.5
design,
of
Documentup
attesting
for the
hot
profiles to
discrimination
required daysany 250A
to
powerby
of
reasonthe
manufacturing
dip No.
onto shall
compliance
contacts
delay
galvanized
: for
which Power
thebe
any
on equipped
with
theshall
fault
Meter
sizes
and
sheet
SES-TE-PS-SPC-0001
the top these
be
delivery
are with
current
shall
not
installation
cover rules
insulated
be
andand fully
up
given shall
stored
no
base to
of in
forat be
in
more
the
shallan
least
a than 35 2.5
particular
electrical
be
Technical
Current
Installation internal items
power
limiting,of all that need
discrimination,
the other to be delivered
endurance at the end of the contract.
....................................................................................
7and
3panels
3. 12.1.1.
6.1.4.
GENERAL The
1. REQUIREMENTS
6. The Enclosures
handle.use -full of ..........................................................................................................................
Two-core: project. Red and black.
............................................................................................................................
round head square neck bolts (coach 408
3.2. 5.1.7.
8.1.2.
11.7.1.
for
SESAME
regulations
days
section,
Shop22
Support
(supports,
operation
Equipment of One
interchangeable
of
enclosurecold
established
The
Control
nonvolatile
kA delay
the
steel.
Drawings
bolted
separation
All-
Connection RMS,
is cables
analyzer
of
at
main
Power
and
Digital
Storage_Ring_Cable_Tray_Layout_18-02-2016.dwg on
contractor
or
set
connectedthe
galvanizing
415/240V,
the
welded
of
taking
panel
with
design.
shall
hour
Between
as
electronic
system any
manufacturer's shall
to
delivery,
mustand
be
described the should
paint
phase
usebe
downstream
onto
laid
day
Transformersthe
in
copies
of
national 5provide
neatlyand
the offloor
recommendations
cables severity
which
in
clock
0. cable
manufacturing
electric
ofthe
strength
4circuit-breaker
around
wire,ofmounting
sufficient
and hinges
trays LTs
theand
grid
the by
according
and
50Hzshall
violation
cross 4bolts)
connectiondrawings
working
fixingsupply.
front
having
1.5MVA isacarried
beisscrews
sectional
to the mandatory
point
access, and
load
current 3D
to
transformers,
instructions measure
area
of out
the
models
capability
toensure
cubicle rating
carry
doors,
from
for
by the
for
4.6.1.
6.1.5.
12.1.2. It
In
For any
to Factory
is
theeach
The
(if the
event contractor’s
Acceptance
min/max
operating value
mechanism Test
responsibility
listed (FAT) above,
shall be tothe double
designedPower check
inMeter
such these
................................................................................................................................
of repeated overloads, the electronic trip unit a shall
shallway optimize
record
that thethe and
position add40
9.1.
6.1.6. CShop
3.1.
12.2.
Cable
Cthe
this
number Rladder/tray,
T
ABLE load
fullAuxiliaries Send
the Drawings
tray
trip
proper
made
into
memory
less
OUTING
All
sides
Panel offrom
pattern units or
the
external
and and
shall
elbows,
LTs
ofaccessories
account and
source be
towithout
ainthermosetting
order
the
retained
covers
made
MDBsbonding
to ensure
followingtoinhot the plates,
exceeding
be the
material
performance
event etc.)
protection
to galvanized
the
manufactured of from
a control
apenalty.
volt 8levels
against
other
drop
of power
of
high overcharge
functions
.......................................................................................................................................
for
4.0% the oftestsuch
interruption.
of.........................................................................................................................................
days of delay equivalent quality thesheet and
supply's
.............................................................................................................
of dip sheet
short-
assteel
sequences: the declared
not less 40
23
8
5. quantities
ABLE
protection
following
The screws
meet
RAYS
ofPower -
inside
Acceptance
available).
the load Three-core:
Meter the
Preferably shall
cable
tests
requirement operate
tray
formsin Red,
itself.
and
AutoCAD
of the yellow
properly
The
checklists
cable orsize
tray and
over
of
to
SolidWorks
wiring blue.
the
be a wide
square
system format. range
neck
(75 of
kg/mof the control
bolts
static must
load
T
3.2. SSubmit D MCCBs
type,
operating ......................................................................................................................................
and withForm-4 ratings internalover 250A
separation shall be
design. equipped with electronic trip 8
Ccontract The-Sis
service
for to Power utilize
electrical
approval breaking the
Meter remaining
endurance
detailed shall
capacity be
beof
shop two
applied
(Ics)
MCCBs, which
drawings in
equal as are
three-phase
to currently
9at
defined
athe least
reasonable by un-connected.
four-wire
50%IEC of
60947-2
scale the toof rated dultimate
standard,
demonstrate to
HOP RAWINGS
6.1.7.
12.3. 4.1.2. AutoCAD
voltage
Cable
Panels
Protection
ABLE
whatever
of
attributes: Busbars RAY than
tray
Allbetween
Cables
steel. shall
from
supervising
cables drawing
Sbe
used the
MDBs main
assembled,
for of to cable
service
SMDBs
connecting trays
wired routes
termination
(internally)
LTs toand andsizes
and
Transformerofany andpart
tested the atlocation
1of
functions.......................................................................................................................
UPPORTexternal
Digital
is
and Specifications
YSTEM
missing hours
engineer.
downstream in run
case to meter
of
devices manufactured
deviationby from
memorizing high quality
specifications.
temperature the
the installation.
factory
Transformer
...................................................................................................................
covers sheet
variations allfor
steel anot 3factory
shall
24
41
less
3.3. M Detailed
power and
be
approved the drawings
suitable
CertificateEoperating
including to as
the
for well
handle
110-415
slot
all as
size
materials wiring
of
VAC, of thethe diagrams
circuit
+/-10%
used cable or breaker
trays
inconcept shall
125-250to be indicates
ensure provided
VDC, proper the
+/-20%. for real
each
tightening.
....................................................................................................................... position
system of
6. Breakers
12.5. CTThe AC units.
.................................................................................................................................................
power distribution covered by this contract is to provide power for the 248
ATERIALS AND
Panel
systems.
The
shall QUIPMENT
tripping shall be made
functionality ofbe hot mustdip galvanized
override manual sheet steel ofand cubical pattern
6.2.
12.4. the supervising
istribution
Tools
Thermal-magnetic
acceptance
ABLES breaking
2mm
andFour-pole
and
than
All external
- thick,
panels.engineer
Miscellaneous
test. trip
Four-core: devices
treated
The
covers that with
following
to the
shallDevices design
onebe equipped
primer coat isand
for understood
neutral
one coat protection;
of
units...........................................................................................................
tests
manufactured
Red, yellow, shall of
bluebe high made
and quality
black.with sheetthe that
light
presence
steel thethe
grey
not intended
less (RAL
of the
41
11. Contract Management
3.4.
12.5.
Cabling
6.2.1. Tbefore
7.Electronic
6.
ESTING
storage
materials

ANDthe
Special
Asking
100kg/m ANDthe from
Min/Max.
C
production.
Electronic
with
operation.
be
The
All at
neutral
M
7035)
comply and main
beginning
OMMISSIONING
trip
power
LTs
accessories
SESAME
Powerdynamic
least
rated units
equipment
with
to
Value
contacts,
and MDBs
of
Meter
equal
ultimate
connections
Dthe the
for even
shall any
thermal-magnetic
to shall
3
will times
breaking be ifbe
production
fulfill
in the
needed
the circuit
furnished
capable
thethe and
minimum
capacity
panel trip
purpose breaker
parts
information
as
of
shall units
(Icu)
9
required
being
required
of
solelyof iseach
ordering.
shall
the equipped
the
toby
applied
be be protect,
contractorwith
adjustable
the without
molded-case standard.
........................................................................................................................
installation.
made using acopper
support,
....................................................................................................................
load (short periods) per each tray) in addition
..........................................................................................................
following requirements:
rotary
need
ofand the
modification
circuit itithandle.
and tray in 24
shall 41
8
3.8.
3.5. IMSource
supervising
OOLS
NSTRUCTION
2. install
the
The
2mm
Setup
than
The of
ISCELLANEOUS
Main
ANDMolded-Case
Installation
spacing
thick,
for
TRAININGengineer Electrical
system
plan.
EVICES
treated from with
requirements
Circuit power
the one
Breakers primer
shallfor
customer’s the
be
shall coat main
side
allowed
provideand panel
followed
one
from
double coat
the by
of
Power
.......................................................................................................................
insulation
test
light Meter reports
grey
of the (RAL by8
1.4.
6.2.2.
5.1.8. Cabling
Design
12. Approved Manufacturers:
ring
No no-brand
Layer
OLDED
the Display
C be
devices
at
All from
Conditions
vertical
breaker
ASE
enamel Cpoles
description:
busbars.
-protection
manufacturer: IRCUIT MDBs
such
tools
Cable Bbetween
shall
rectangular
finish as
are
shalltoinside
to
arrangement:
REAKERS SMDBs
and
magnets,
operate
be
FROM the
be 630
usedsupports
Standards
profiles TOcontrol,
simultaneously
configurable
and anyshould
onto
1000A,
3in single
outside. vacuum,
which ofbe
for equal
10 tocover
diagnostics,
circuit
top or less
breaker and than
etc.
opening,
base 1.1
and shall also
................................................................................
part
as follows:
core
This the630mm²
includes whole all installation,
cables
access per doors, all
phase, closing
devices
side be
with theand
covers, 26
the
3.6. N  display.
7035)
2mm
All
Phase -
jointing thick, Five-core:treated
bolts with
and nutsone Red,primer
must yellow,
have coat theand
blue, one
black
following coat and of light
green/yellow.
arrangement:
...........................................................................................................................................
of recorded Min/Max (for multi-phase grey (RAL
bolt head 9
2. Scope of Works
8.2. Testing
6.3.
3.7. 6.1.4. M
These
RF
AMEPLATES
The General
AIN E
tools
Continue
2.
cable
All
drawings
meters.
mustand
source
All
back
-
front
construction
possible
bolted
shall
Setup
blunt
enamel
7035)
Auxiliaries
tray
busbars
Cable
As
Sof
neutral
cover
standard
require
system,
to
power
tray
provisions
edges
finish
procedure.
and
fit
shall lead
being
and
approval
with
accessories
for
resulting
insidebe
installation
accessories
seals
side
shall the
a
fully
identical
and
3-position
to from
main
in
covers
include:
from
shall
prevent
respective
contained
outside.
supervising
toLT
service as
cutting the
setting:
consist
unauthorized
well
Thisor standards,
panels
within
phase as11
bending
neutral
and
will
the
includes
not
sizes.
any some
be
not
limited
access taken
unmentioned
all be
access
to
.........................................................................................................................................
nominal be be or frequencies
welded
equal
compliant to and
at to ofonto
least
their45 the to 65
which
value Hz.theof hinges
the andmust
short-circuit fixing screws
current
examples
(3x(1x630mm²))
to:
from
smootheddoors,
...........................................................................................................................
expansion
the settingsof
(Isc) the
are
the
parts toat
side doors,
2the
or the
that
be
26
cable
safe
covers, are
engineer
7.
The
3.Construction Any

No
to
–Quality
quantities)
LECTRICAL
electrical
plates, face
Thecable
Electronic
tripping.
sides
protected
modification
Power
UPPLY
to
and
and systems
tray allow
Assurance is
trip in
shall
on-site
allowed
units the
and shalldesign
comply
toinstallation
Test be
shall the
but
directly
Plan.
comply be contractor
not
back of
with limited
auxiliaries
installed
lit LCD
appendix seeto
on for that
the
F easy
of it
floor; is
following
without
operation............................................................................................................
Meter display viewing,
IEC necessary
de-energizing
they
60947-2 should
display shall and
be 279
6.1.
7. 3.8.
CABLE
5.1.2.SMolded
lug
Aarea
Scope crimper,
separate
contact
TRAYS
Minimum
OURCE
8. be OF
Latchof
Measured -
Openings
Where
back
enamel
flat Case
Storage_Ring_Cable_Trays:
enclosure.
point person
works
AIN
- on Eof
Insulation
advise
Visual
CT and
washer single
cover
LECTRICAL
Neutral Circuit
installation
rating Inspection
will
for
includes
values
finishmaximum
coverstripping –and tester
core
inside
POWER be
incoming
devices
must be
Breakers
on
supply,
side
FOR and
cables
and
values
THEthe
for
assigned
covers
under
threshold MAIN electric
torque from
The
mechanical
cables both
installation,
are
outside.
shall
availableequal as
PANEL usedand
be cable
for100
circuit,
wrenches, and
wires trayto
unless
all 630
draft
the
electrical
SESAME shall A
thedesigns,
rest
be upstream
of
compliance
and
..............................................................................................................................................
M cut the
the including
on toolscircuit
supplier
theby follow.
top
................................................................................
pressure well
This for
available
fromtothe testing
as
includes
12
(busbarsthe phase for the cable trays 9
passing
any
via
halfmanufacturer and all
or commissioning
different
unmentioned
access
communications
others) electric
doors,– parts
flat of
side
and sizes
bobreaker
phases
that
washer ofth 27
are
Specifications
12.1.
3.3.
4. 7.1.
PANELM
standards
8.2.1. all
touch
Visual
33kV/415V
for
Distribution
material
Materials
display.
Installation
for
the
shall
standard
MCCBs
All
and
Busbars
discussed
makes
Closing
the
covers,
– of
and
Openings
neutralF
releases,
also
1.5MVA
and
of
value SESAME’s
regulations.
installation.
inspection
externalshall
supervising
alternative.
Panels
shall
then
the
ring
and for be
covers
be
cold
ends
Equipment
cable
All
of
incoming
of
electrical
actuated
to quarter
high
transformers
take place
or
galvanized.
trays be
in by Storage
cablesaauxiliaries
1
toggle
manufactured
conductivity,
located
less thanand or
outside
wires Ring
and
handle
of high
rectangular
the
shall that and
accessories
be clearly
quality
section,
electrical cut RF
such
sheet
on Electrical
assteel
indicates
the
voltage
electrolytic
sub-station top the
not
onof less
.........................................................................................................................
approved
ATERIAL AND INISHING
be
(measurement anti-glare of and
RMS by SESAME
scratch
current resistant
values, through 14 written
electromagnetic documents.
REQUIREMENTS.................................................................................................................................
installed on the support system which will be installed directly on
compatibility, the floor
etc.) 27
9
11.4. 3.The three
than
routes.
grade,
Power
it--open XLPE
possibleMeter to shall
insulated
ensure provide
cables the
coordinationwith following,
abe(as
temperature
definedtrue RMStolerance
inaccordingmetered
Appendix of A90°Coftop at side
IEC 60947-
TUnaccepted
site.
commercial
1.2.6.1.1.
Safety
and All 80ms.
General

equipment
the System
and Practices
engineer.
enclosure, ends
as type
technical
with
must
described [three-phase,
the
bequestions.
proper
furnished
cables
in the glands
shall 3-wire]
with
specificationsand
end [three-phase,
adapters
identified and/or (male
shown 4- andon to female)
appropriate
drawings, required
7.2.
4.1.
7.3.
The
9.2.5.1.3.
SAs
GTheAlldesign
Built
T
quantities:
Cables
Submit
are: plates.
including
12.1.1. The
a)
using
Openings
Bellevile
future
2mm
S
Scables
using
Sampling
Installation (shunt
The
SStorage
Neutral
use
high
of
hard-drawn
Contractor
2);
Following
to
to be Distribution
suitable
will
or
ring
Display
Drawings
Protection
positions: thick,
least.
-Real-Time
Test
wire]
enclosure,
the all laid of
has
associated
value,
for
or
ifquality
they
YPE OF RAY YSTEMS be
underthreshold
sized
incoming
lock
are
tovisually
cable
shall
settings
ON,
copper,
the
tripping
between
ENERAL PECIFICATIONS
for approval with
anchor
voltage
OFF
treated
to
the
heat
ever
trays
be
shall
LTs
submit and
with
with
tightening
due
detailed the
equal
washer
proper
electric to
shrink.
cables
required.
inspected
bolts.
type)
quarter
capable
apply
TRIPPED,
one
Cable
bolted
the of Infrastructure
to

in the
and and
nut.
Salt
primer
transformers
electricalTrays:
randomly
CV’s
manufacturers'
works;glands of
phase
for /
2connections
of
to
and
wires
This
allowing
all Jordan
defect
auxiliary
circuit
coat
the
faults
andThe
can
should
16the
for
incable
breaker
and
selected
key at
(overload,
LT
be
the
the
contacts
user
one
joints.
bolts
persons
panels
specifications,
adapters (male
cut
be
coat
tray
on
insulation
toshall
view
using
who of
the
strictly
electrical beare
draftfour
short-circuit,
with
and
and
light
original
female)
followed.
designed
values
design
aspecial
torque
going grey
earth
routing
of
............................................................................................................................
conditions of the project system
tofor
on
(RAL
...........................................................................................................................
Ring for
wrench
catalogues
required work
...................................................................................................................................
Enclosures
UPPORT YSTEM Readings
28
28
9
the
4.installations
Any All installation
easy
one
poles. on-site installation. All routessystem
electrical by the supervising
auxiliaries parts must engineer.
shall be equipped be from the selected manufacturer for
with
C4.1.1.
8.7.4. a b l e
4.
andMechanical
s
CLocation
Rated
for
Installation
Insurance
ABLE
4.1.2. Detailed
the

In
- AND
The
7035)
fault),
Tdrawings
The
to cut Specifications
order
connection
of
Molded-Case
Voltageto
Openings
Cables
It Aor topanel
busbars
the
buildup,
shall
enclosure
RAYS
-
The
 The
Busbars
ensure
Non-flexible,
use ofaccording
weld
of
shall
be forbetween
CCESSORIES
Current:
current
drawings
screen
shall
Communication
of
and ring
safety
and Sin
theassame
tripatunits
................................................................................................................
will
Circuit
cable
molded-case of suitability
armored
self-tapping
be
trays
labor
the
materials
outgoing
generally
installation
possible
well time.
as
be
the
of
to decided
parameters.
Breakers
circuit 240/415V
quarter
will
cable
torun
PECIFICATIONS
per-phase,
voltage
notwiring
andon
install be for
cables.
screws
sufficient
LTs in
breakers
trays
and
cables
available
N
signals
A summary
isolation
on
3(MCCB)
under
and also
the
size
site,
±must
10%,
the
shall
equipment
connection
cable
all the wires
trays
space,
(calculated)
shall
diagrams be
complying
known
technical
tobethe
limit
shall
318
and
of
followingssprayed
shall
LT1
with
and
digitally
shall
screen
cableas
variance
phase, the
building
comply
responsibility
have awith
the be
and with
self-drill
temperature
4rated
wire
with
cut
options inof
proper
averaged
sampled
bebreaker
shall provided
andIEC
these
with
a(3 the
IEC
phase
the
operational
clear
on 60947-2
screws
positions
on
protective
for
over
at the
the
glands
a
MDBs
any
+60947-1
Contractor
reference
bottom
3-
rate
§of
point
1voltage
cold 7- 28
isneutral)
is
in
and
............................................................................................
electronic
for each system
also be available and
high
to allowas10it
Specifications....................................................................................................................
shall augment overall circuit
to9
7.5. less
Gthe
in Contract
zinc
compliance
correspond
Neutral 27:
strictly
on
and
the
enamel
of
remote
Schneider ensure
ing infinish
with
resetorderproper
the inside
shall
Electric,
specifications totrays
Labor be
most and
wrenching approved
Law outside.
inhibited.
supported
Solidly oftorque
the by
It This SESAME
is
Hashemite
with shall includes
used. however
compliance Kingdom allsheet
before beaccess
possible
of doors,
assignment.
Jordan.
.........................................................................................................................
with all side SESAME
ifspecifications
opening covers, 29
4.1.3. Swas
ROUNDING
Any installation
Installation
built
Fault LT3.
ladders
--OFincluding
trip
Openings
adapters
enough
serious
Tolerance
volume.
THE
of
phase. TRAY
ring
to for
defects
system, outgoing
cable
provide
any true
found
namely
deviations cables
quarter
RMS in
the the 4earthed
and
accuracy
anchors,
and wires
insulation
modifications toat
bolts, the
shall
the
20 source
bemade
15th
whether
washers cut on
harmonic. the
caused
and
on top
nuts.
site
.............................................................................................................................. by
in of the
installation
reference to the
12
7.5.
7.6. Grounding
than
will
AFETY
and 
galvanization
standards 4m.
AND the
The
prohibited.
the
60947-2
back
Service
690V
was S
preferable. user
the
cables
ECURITY of
Insulation
busbar cover
AC to
Area. view
operating
the
toshall
standards 65°
and
(50/60Hz).
mentioned paint.
with trayabe
test
the snapshot
C.mechanism
side
or laid
at
or
proper500V
required in
with
covers a of the
shall
trench
the
glands
by as system.
(preferably be
which
corresponding
this well
and designed
as has
750V):
adapters
document. any been such
standards that
previously
measured the
..............................................................................................................................
unmentioned
(male and toggle
prepared
resistance
applicable
female) parts or for
that
required in 30
are
4.2. 5.1.9.
L Fault
5.
Site
shop or
T 
The
Acceptance Connecting
Cables
enclosure,
unit
Remote
Openings
Level
drawings P at a
Voltage:
maximum carrying
later
Control
1 by
atRing for
the LT1 time:
3 and
L–L
distance
(LT1
SESAME
end and
outgoing 3of phase
LT3
Communication
to
per-phase,
the away
LT3) to
cablesbe and
transformers
from and
decidedneutral
averaged
any wires loads
1
can
according
bend, L-Land
be be shall
3 cut
over
it to onbe
the the
3-phase,
horizontal 5
main cores,
bottom
or supply
L–Nvertical
............................................................................................. the
side of
per-phaseof the
2contract.
OW ENSION The
All ANELS
electronic
Power AND Meter components AND
display shall withstand
provide local
7.7.
6.3. CAchieving
All
evaluate
ABLE T
5. general All
Cable
this
RAYNo
Busbars
Storage
the
Openings
The
ABB
to -LABELand
the
respectively.
neutral
with
the
handle
between
steel
safetyRCBO
response
molded-case
installation
operating
high-threshold
and the parts
shall
for
properrules be
RF are
incomingmust
withinrated
system
mechanism circuit
glands to be
Update:
(Residual
earth-fault
MCC
be
to
and directly
strictly
cableswithstand
The
working
openings
breakers
shall cable
and
be
adapters shall
should
of exposed
followed
Current wires
days.the have
(male Iftemperatures
mechanical
tray be draft
aby
shall
the access
in
Breaker
secured
stored-energy all
rated
and be
key any
design
forces topart
workers
cut up
persons
by
female)
the
..................................................................................................................................
for
on
insulation
their
type toof
following
exerted
with the125
doing
the whole
RF,during
bottom
proposed
respective
requiredvoltage any
Over-loadthese
to type
of of the
by
fix 30
7.8.4.2.1. 12 1.
CContractor
of
ABLE T should
manufacturing
 are
plastic RAY The-
metered
°C
system,
short
the
they
750V
only
The D
purpose. ESIGNPower
trays
can
any
shall
are
power D only
two
RAWINGS
notbe
Meter
will
mustmeter berequire
be
different
of
shall
grounded
in
category
approved should OFF toprovide
have
conductors
theA
be and
position
with
thecontinuous
Contractor
capable
complete
electrically
(O)
must
a rated of if
be
service
shall
connecting
sampling
thecable
less continuous
power
than replaced.
breaking
propose tothe
at
1.5MΩ.
a minimum
throughout
contacts
.................................................................................................................
capacity
new
anphase
Ethernet are
Further
candidates (Ics)
of
all theup
details
equal
to
to 30 be
8.1.
Author(s)
4.7.9.
P 4.2.2.
a n e
4.4.2.
C
Requirements
SESAME
protection)
l
ThisR
Mechanical
Frequency e
32
not
Breakers
whole q conductor
the
enclosure
u-
schedule i will
exceed
R r e m
averagedapprove
protection,
buildup, e
Specifications
30cm
Layout having
according
n
represents t s in
L-N the
installationthe submittal
same
to and
Checked
available within
connection
cross-sectional
by space,5 working of
with main
area ofdistribution
the proper Approved
glands boards;
conductors
..............................................................................................................
andboth over sides.
Sizing
the 50HZ
3-phase.
maximum ±1% allowable time. Shorter
..................................................................................................................times byand willRF- be 12
31
8.2.2.
6.1.6.
ONTRACTOR
work
approved
days. 

protection
network.
Thermal-magnetic at quantities:
The
Insulation
compromised
circuit
what
tothe
enclosure,
AC
The- actually
on contractor
ESPONSIBILITIES
follows
SESAME
(50/60Hz).
byLEDs testing
conditions
covers.
SESAME.
Cutler-Hummer/Westinghouse
addition with
in steel
after
site.
of
front will
the a
tripmust be
RF-MDB,
when
proper
The
to rotary
units responsible
be
indicate painted
directly
glands
Contractor this
handle the on
might
and for
connected
will
shall
cause the removing
adapterssame
change
bear
in
of to
no day,
slightly,
a
(male
the
tripping way and
meaning
powerand
additionalreplacing
and
affect
(long that
source
female) thistime
circuit
time, no thesteel
change
having
required
short for is
the
4.3.
Sofian Jafar 6.
an Breakers Where MDB
unless
adapters Layout
samples/cycle,
-- System theOFF
Real and
cable Sizing
Power: trays ............................................................................................................
simultaneously are Erhard
per-phase raised, Hutel,
onandinstalled
all Ibrahim
voltage
3-phase on Saleh
andvertical
currentwalls Erhard
channels Hutel
and notthe
in 12
8. 4.3.2. Earthing
The TosupplierBreakers
cable
General trench
an
will
the
to
achieve
The
All
breaker Current,
tray,
In
workers
ultimate Layout
RCBO
molded-case
shall
parameters thegive per
must
breakinga phase,
grounding
and
position,
type
and wear Sizing
the
breakers
written
circuit TT
measurementsRMS toggle
industrial
capacity report itand
connectors
breakers or
(Icu)
isaboutneutral
of handle
gradeon
acceptable
shallshould
the
the all (if
safety shall
the
work
be
power
CABLES........................................................................................................................................................ comply
indicate
shoes,
operational
toavailable
use
progress
meter add-on with
with
in the
voltage
every
should mentioned
isolation
steel
accessories
switch-
be toe range
accessible ifthan for 31
that
4.3.1. SR-MDB
8.1.1. 
installed and
The
Main
AND time,
RF-MDB
SR-MDB.
minimum
Characteristics:incoming ..........................................................................................................................
Requirements internal
breakers radius
for the of
panelsbends shall in cables
be MCCB shall not be less 13
7.7.
Revision table
4.5.2.
5.1.4.Cable
advantage
All
Voltage
directly
below
Breakers
 Tray
cables
Current - Drop
covers,
workers
All total.
and
work label
on
shall
applicable)
standards.
position, will
Layout
Inputs
free the
must beofbe floor,
considered
tested
and
becharge, with
Sizing
according
cantilever
Max. anin
during the
insulation
the
Allowable
to known
support
evaluation
executiontester
voltage
good
fixturesprocess.
up-to
of
practice his
drop
must
1kV, work
is 4.0%
measures,
be
measured
as installed,
directed
from and values
thethe by
source
9.3.12.1.2.
4.3.2.
8.1. RService
add
month.
Mechanical
EQUIREMENTS
must
over
A
Equipment
calculations
Storage
the
Openings
The
that
type.
Main
comply
-
Manuals
disconnector bus
characteristics: bars
Ring
instantaneous,
buildup,
Reactive
Voltage,
for
Specifications
withmust
must
Electrical
outgoing
installation
Power: be
phase-to-phase,
the
be
earth rated
clearly
following
cables Distribution
fault
per-phase and at and
shown
150%
if and
table.
wires
requested),
connection
panels for
of
3-phase
phase-to-neutral
Panels:
shall
the
shall
ofloadbe
rated
be
sub-main
total.
The
cut
MCCB
full
onprovisional
load,
the top
distribution
......................................................................................................................................
incoming breakers for the
these
.............................................................................................................. of location
the panels;of31 of 13
2.
The continuous
the
supplier
are -
whole
calculations
all toisolation
Adjustable
and
work unshielded
shall
SESAME
with thermal
heavy be copper
provided
(LT shall
items. cable
Panels) by
agree a of
double
up on 35mm²
to break
factory
the must
last on run
visitsthe
element the
main
on wholecircuit.
his
of the length
site and
11.2.
4.4. 4.6.2.
8.1.1.
3.4. Documents
Breakers
Everythe
Current
General
Testing the
all Site enclosure,
versions.
the -inputs
Feeding
Q1-
segment
All
given
type.
Layout
functionality
ratings only
remote
Data
Acceptance
outgoing
Requirements
and
documents.
Main busbarsand
up
in andthree
cables
of to
the items
Sizing
the
Commissioning
incoming
of
250A,
connection.
transmission
shall be stable
the
suitable
have
Test cable
breakers
appropriate
breakers toup
been
(SAT) be
tripping
residualto
via
raceway
for provided
500V,
foratable
sized
for BUS,
the
the
the
mechanism
current
to
hasfor
type
of into
comply
panels
panels
the
the with
protection
particular
of have
shallgreater
IEC
shall withthe
positions
installation
cantilevers
be the
aorlabel
be offer:
............................................................................................................
on
ratings
all
MCCB,
RCBOBS the (ON,
normal they
trip
according
including OFF
MCB
regulationsunitbreakers
...................................................................................................................
shall be marked and color coded according selected shall
to and
its
or for
the
in theordesign
have
tosettings, code
RCBO to 31a
aand 13
4.1.
4.4.1. General
Service
Q1-SMDB,
of use
This
loads.  manual
installation
Protective
must
distribution
with
dedicated
they
The
includes
following:
Specifications
-Q2-SMDB,
MCCBs Apparent
protection,
be
TRIPPED)
the shall
listing
molded-case
shall
current Q3-SMDB
clearly
proper
RCBO must
eyewear
havepanels
breakers,
Power:
beshown
a able
all
look test
glands
units AND
circuit
rated to
from
contactors, and
Q4-SMDBper-phase
receive
aesthetically
described
to electrical
in
be the
andused
insulation
breakers acircuit.
maintenance
submitted
in whenever
this
adapters
manufacturers.
etc.
and
device
acceptable.
document.
shall
voltage design
(male
be
3-phase
for
procedures
steel
of locking
documents.
and
designed
750is to
V in
with
be
female)for
AC the
cut “isolated”
detailed
....................................................................................
with
required
vertical,
(50/60 sparks
Hz), to
horizontal
and fix 14
8.1.2.
8.1.3. Connection
warning Connection

cable SMDB,
type
Jordanian
All
type.
- (Do
electrical Between
outgoing
Real
Length
total.
trays, notQ2-SMDB,
Between
power,
Power
fixed
Transformers
Step).
equipment
of breakers
cable
to LTs
Codes
3-phase
Factor:
the Q3-SMDB
offor
[m] and
and
cable will
building.
the
totalLTs
3-phase MDBsbe
panels
trays and
Minimum
total.Q4-SMDB.
....................................................................................
delivered
shall
using be atMCCB
Acceptable
appropriate a later copper time, these fixing labels must 33
4.4.2.
Rev # 8.1.3. Date Mechanical
preventative
The
subcontractors position,
Conformity
Forspecifications panel
flying Fixed
DoneSpecifications
shall
for by
maintenance magnetic
or be non-conformityprotection
assembled shall
and for be
to16th current
all provided.
wiredtheduring ratings
(internally upcircuit
toand 200
..............................................................................................................
schedule Remarks externally) at 14
the
11.5.
4.5.
5.1.5.of
7. highVoltage
Altitude
Connection
Testing
SUB-CONTRACTING
These
Breakers the
accessories
b)
All
ELEC:
they
or
the
The
and
according
Cables
quality
standards
type.
All Energy
bus
shall
outgoing
outgoing
bars
InputsThe
-measurements
Between
buildup,
laid
and
Frequency.
Layout
betochecking
De-rating
commissioning
usingonshall
layer
possible
cables
LTs and
referenced
not
installation
Readings
and cable be
installation
easily
applyhigh
breakers
Sizing
3the
showing
factors
for phase
with
each
shall
trays
for achieved
About ofthe
and
be
documents.
removable
gradefor allor all
and
IEE motor
600m
phase,
cable
heat-shrink
electrical
drawings:
the
work
external
full
connection
performed
panels
Insulation
tripping
ladder
from electrical
mechanism,
above the
panelsbyin
tubing
shall
Resistance
Sea
causes,
sub-main
the
shafts
cablebe
manufacturing,
Level
and
or
see works,
contractor,
trays.
any shall
should
MCCB,
[MΩ] other beincluding
distribution
MCBbreaker
MDBs................................................................................................
beas
fixed
high
the
if grade
calledapplicable.
followed
............................................................................................................ ortwousingthe
status.
panels;
RCBOfor by the
for
drawing 33
14
1 14 For
8.1.4. codes final
February
Connection  with
specifications.
flat-
around.
shall
Cables design
location
neutral.
location
Schneider A
Itup
mounting
Sofianbe
Between to
suitability
shall on3
review
edition.
used Jafar
suitable padlocks,
be
MDBs
Electric,site,for
without
for meeting
possible
for the
connecting
and most Ø8
isolation
any
Initial
isolation, maximum.
a
following
to design
shall
install
reduction
Released
LT1as a report
be
tests provided
specific
in
defined
to shall has
performance.
Revision
SR-MDB by be to
module
IEC by be
and
60947 presented
positive
performed that
LT3 can
–1 tocontact
followed
and
SMDBs.......................................................................................... provide
RF-MDB
-2, § weeks
by
the
7-27 test
34
5.2.
7.8.2.
C a4.2.2.
b2016
4.5.1. e Max
lDTSpecifics
production
3. T Breakers
All r a AUX-
Ambient
and
All
suitable
material
y
type Pstandards,
--separate
s breakers
forof
breakers Temperature
Different
suitable
all
Layout
Reactive
Storage_Ring_Cable_Tray_Layout_09-02-2016.dwgpieces and
totoACbe
Telectricaland
power, for
have
Sofhoused the
Sizing 40°C
asDistribution
directed
panels
3-phase
rotary
earthing INSIDEinside
application. byTtimes
total
handles
cable themust
the
accordingly, supervising
cabinet
Panels that
(AUX1-SMDB
be without
further
can bound be engineer,
rotary handles
specific
accessed
AUX2-SMDB)
together inrequirements
the
without
using presence
that canfor
....................... of
inISTRIBUTION
The reports
ESTING
In the 
service

preferable. The
MCCBs
List
Protective
Provide
of
The
for
shall
ANELS
LT1
by of
the
event - manuals
circuit
datathe
FOR
Accumulated
Adjustableshall
previous
indication
Breaker’s
full
and
molded-case
comply hand
Overvoltage
the
HE must
monitor
be
capacity
LT3.with (from
wear
Contractor
OCKETS
Energy:
have
equipped
similar
rating
the shall
neutral
to
Category all
of
followingbe with
the
THE
apparent,
5projects.
to 10
the
allow
used
busbar
requires a UNNEL
components
load.
IV “push
while
shall real
connection
as
requirements:
for the
the
the
beto
a and
handlingcurrent
trip”
phase used
suitable
rated
services to AND
at
button
busbar rating)
circuits
cable the
...............................................................................................................................................
manufacturer: circuit breakers for
insulation of in front
up
trays
reverse for
installation
to to
due current
feed
voltage
sub-contractors, 480
test
to volts
the
without
up to 34
the
the SESAME  SMDB1
be
size
The
opening ofshort and
engineer's
fire circuitAUX-SMDB2.
resistant representative.
PVC
ratings ties
of theat an Testing
interval
busbars shall of and
no
be morecommissioning
rated than
like 1.5
the meters.
main certificates
18specific
Min Ambiant panels are todetailed
Temperature individually.
0°C
4.5.2. 15 appropriate according reactive.
ratings referenced<30in documents. >16
2 8.2.1.
4.5.3.
referenced
February
Visual
advance.
Contractor
showing
Mechanical c)
 Storage AC
sharp
size.
any
690
ABB.
Main Demand
operation
inspection
Installation
accessed,
Enough
-
incoming
anything allSofian
(ON
transmission
Vresults
shall incoming
Apparent
Readings
Specifications
on
Jafar
and
Ring
obtainof
however,
space OFF)
and
the Rack
electrical
power, via
breakers
the
factor
distributionprior
the
readings Modifications
front
Supports:
aaccess
BUS,
for
shall
3-phase of
the
written
socketsshall the
be
totalin
door(s)bemotor
This
inpanels requested
particular
approval
the
provided mechanism
shows
shall
storage
must
submitted be
and
be all by
the
ACB
ringthe Procurement
............................................................................................................................
clearance
lockable.
between
to the module
provisional
trip
tunnel, unit
of
and
supervising
cables SESAME
..............................................................................................................
board, they must be also lockable.
Officer
location
settings,
cabling
laid onthem
engineer of all
for 34
at
15
5.2.1.
8.2.2.2016forInsulation
The any copper
 PowerAll
future
supplier
List
The
MCCBs
edges-
without
and breakers
terminals
Meter
greater
Demand
the
testing
of
-
Visual foreseen
jointing
on No
shall
them. for
requirements.
opening
the
shall useto
than
more be
designed
LTs
Current
Inspection
ofbe of
of200
bus housed
to
subcontractors
than
designed A.
potential
thebars for
SESAME
for 4.0%inside
Calculations
poles. such
mechanical
shall
to and
enable
be the
purposes.
transformers. cabinet
(Per-Phase):
electronic
voltage contracted
carriedsafe anddrop without
versions
(max.)
electrical
on-site
out by present
enough rotary
of and
all
compliance
installation handles
...........................................................................................................................
submit peak
drawings
bolts of andup by to
auxiliariesthat
using(dwg,
the can 34
last
4.6. sub-Breakers
SESAME. 
 the
type.
to
The
cable-
reduction
contractors.
It
breaker. Cable
current
shall
Layout
main be
and in
shall
Thearrangement:
performance
possible
Sizing
incoming be
approval designed
to ensure3
of up single
to
SESAME 500
according
neutral core V of300mm²
CA. to
a
protection. Eco-design cables
sub-contractorThe per
tripping phase,
complying
shall
............................................................................................................
breakers must be equipped with a remote not
threshold
ON/OFF with with
relieve2shall ISO
the
15
3 9. 7.8. 4.1.1. 4. Spare
Cable be
Tray
MCCB main
splicingDesign
rating, incoming
copper 30
Drawings
“push breakers
fittings
toheights
trip” must
button,must be be
outgoing 16
foreseen equipped on
circuit thewith cable a
identification remote
toand connect
and ON/OFF
pdf,
DELIVERABLES
4.6.1. MainSockets
The MechanicalThe
work.--Layout...............................................................................................................................
torque
such
racks
Workers
The
14062,
AUX-SMDB1
Contractor
be
control
trays/ladder.
power
Busbars
nominal
Demand
which
Software
high-current
Power meters
Specifications
measured
supervising
single working
offactor,
shall
full
Real
willthat
breakers
any and
used
be be
of
scale
Power
later
allows
at
molded-case
itsfor
AUX-SMDB2.
3-phase
for
utilized
input Calculations
the
obligations
the
of
installed,
these
total
LTs
even
the this
more
data
circuit
panels
must
for
Power
to
shall
under
be
(3-Phase
is
than
be
breakersbeMeter
only
analyzed
this
compliant
interconnecting 2mMCCB for Total):
shall
must
shall
Contract. reference,
with onMCBs
be
............................................................................................................................................
All - outgoing
bepresent
have
PC 277V
shall
available
The the
terms
unless
AC in
of
peak
L-N,
contractor
protection
be provided
3-pole
any sub- or
35
15
4 7.1.
7.4. Material
Cable
step, earth
 accessed,
Trays
contact
480V
List
etc.).
as -
wrenches and
Demand
of and however,
Finishing
foreseen
engineer.
voltage element
to Accessories
Reactive
releases
satisfy the
instrumentation
in the
(shunt
the access
Power
electric and
recommendationsdoor(s)
Specifications
Calculations
(data
circuit.
under must
voltage of be
(3-Phase lockable.
releases)
the Total):
following and present
indication
table, takeand note
4.6.2. TESTING 0.Dconnections ANDtethers
will
4-
most
type.
Installation
equal by
core
ACCEPTANCE to 300mm²
importantly;
that cables
MCCBs for neutral
materials andshall 2of single
be of core
halogen 300mm²
........................................................................................................................
ofofand cable
the phases,trays or connecting
selectively all
to distribution
aswitch
reduced value boards free
(generally ascables
type, well
half and
16
1.5. Scontract
9.1. Equipment
HOP
The Factory 
The
For
Panel
A
RAWINGS shall
mechanism
completely
position
design
AC
sheets)
The -
switches
that
insuring
pole
the
has
L-L.
peak
be
arrangement
drawing
Insulation
Contractor
the
the
for
Acceptance to
subject
Ratings
shalltypes
at aconnected
be
indication
be
Demand
tightening
safety
protective
manufacturer
(neutral Test
connected
for to
60
totally
later
approved
test
shall
from
(FAT)
and
oftime cables
sizing
torque
earth.
protection)
cable
must
Apparent
at
conform
to
500V
supply,
falls.
toof
enclosed,
byby
an
and
be an
SESAME
values
with
emergency
the
breakers
race
SESAME and
clearly
Power
(preferably
install,
methods
emergency
way
test
mentioned
(3x3x(1x300mm²)+2x2x(1x300mm²))
the
shall
staff;
visible
in
Calculations
provisions
switch
8written
750V):
and
laying
and
commission
in the form
at ofthe this
shall
at
accessible
(3-Phase
measured within the
....................................................................................................................................
containedconceptual
1haveevery in the
protection
2table panels
design
meters. Contract.
frontbe
class
Total):
all
are to2
.......................................................................................................
versions. On 4-pole circuit
of
approved
front
please
from
weeks
resistance
be
breakers,
each
ispresent
not of
the
achieved
by
refer
attached;
less
aftera
each35
163-
9.4.
5. 9.2.
12.2.
POWER ASpares
11.7.2.
The B
Cable
5. It
S
1.METERS
UILT  D be
All
as
the
panel
selected
All -
of
Trays
SR_Breakers_Cables_Layout_Tender.xlsx
impossible,
RAWINGS
than AND breakers
Frequency
that of
capable
ANALYZERS the
material toof
isStorage_Ring_Cable_Tray_Layout_09-02-2016.dwg
to themeter responsibility
accessories have
phases). usedforthe
of rotary
instantaneously in SESAME
thebe handles
contractor tripping
approved
installation cablethat by
totemperature
purchase can
the the
raceway
must be
breaker, accessed
supervising
and
be this
...............................................................................................................................
and this should system
install without
connection
engineer
thisatisearthing
..............................................................................................................
either galvanized from
Hotor rustmustDip35
17
3.5. 5.2.2.Instruction
the 
 Powerfront,
The
Foreseen
cables.
and
Any -
position
supplied Analyzers
between
and
they
-
not
ladders XLPEin shall
schedule.
peak
shall or be for
accept
insulated
scaffolds
recyclable and
MDBs
separated a metering
cables
used from
packing by with over-range
power
workersa
complying must of be tolerance
metallic, of
and they least have to
9.3. 6.1.7. SAll All
ERVICEequipment
Galvanized Electronic
cable
and
opening
providing
power
Mengineer.
be
the
ANUALS
capable
document
IP54, fail
(HDG)
degradation and trip
of routing
demand
selected
shall unitsbe
proof for
90
instantaneously paths
calculations
usebe
SR_Breakers_Cables_Tender.xlsx
steel manufactured
dust,to for
vermin various
inequivalent
the
tripping panel
from
and shall locations
the
rodentshall
high
in use
5.3
breaker,be with
quality
proof.
environmental in
for the
anythis
suitable European
steelbuilding
one
..................................................................................................................................
for
connection
AUX1-SMDB with of
protection
Directives,
aaccording
the
continuous must
and
thickness
to following
the toof
reliable
becable the
35
fail
172
11.6.
5.1. RWarranty:
STraining
6.1.3.meeting.
All installed
EQUIREMENTS
The 
Current 20%.
All
be
layout
switch-
anything
manufacturer ......................................................................................................................................
any
cables
circuits,
hardware
Demandof two
90°C.
shall
on
limiting, shall
all different
panels be
except
current,
be
the shall comprised
in
provided
distribution conductors
cable
terms
per
implement
discrimination, phase
to of of
traysset
board, a
sizing
(if must
copper
must
neutral
nonpolluting
they
endurance forbebe
must less
conductor.
supplies
breakers
protection than
production
be also with
and 1.5MΩ.
to 10%
quantities
any
lockable.
processes Further
spares,
of of
the ifdetails
the
breakers
thatfollowing
do not
9.4.
5.1.1. mm.
Any calculation
operation
PARES
Both trays
on .................................................................................................................................................
manufacturer
the
All
Earth
safe,
all
AUX2- RF-MDB cable
under
cable i.e.
Busbar
i.e. ifif is
the
and
trays. theaccepted
terminations design
remote
SR-MDB
must
remote be provided
shall should
sized
control be
conditions
control that
carried
mechanism
be
according the
and out
equipped
mechanism sample
using
2standard
is
to damaged
with
isthe of the
compression
aheavy
biggest
damaged product
stated.
the
higher breaker
end
busbar
the is
copper
Temperature
breaker does
logging
used cable
doesnot
power
for 35
de-
not
Procurement
10% General
as This
well
A
Front
The
A
approved
levels:
For
make
is
sketch
as all
on
the
ensuring
-Characteristics
access
themselves.
input
Requirements
sample of
the
use
of
all
impedance
of
electrical
-applicable).
Flexible,
for
cable
unprotected
types,
of
the
shallthat
material,
the
safety
sizes
sizing
four
cable be allshall
auxiliaries
non-armored
by the
connecting
neutral
chlorofluorocarbons, and
the
layers
provided
tools,
trays, be surfaces
this
resident
(4P3D),
equipped
to to
valves,
greater
shall
cables.besafety
must all
different be coated
installed
than circuit
instrumentation
beof
half-protected
tripping
chlorinated the MΩ
the
officer
distribution
with
inside
breakers,
exact
units (L-L)
snap-in
atothermodel
SESAME.
neutral
of
hydrocarbons,
the
shall
and
boards
breakers
layer
tunnel
control

...................................................................................................................
that
type be
and
(4P3D+N/2)
ink(L-
will
and of
and isbe
other
contained
for
zinc
authorized
fitted used
end
or
cardboard
with17
fully
in
10. TESTING accepted.
The
a methods,
rating
analyzers
minimum
AND  Installing
lugs
The
should
the
warranty
provided;
protection
COMMISSIONING selectable
Emergency
be
withperiod
thickness cables
taken
fast by between
120
into
sampling
shall
of the
Shutdown
45um. account
be user, distribution
24 block
button
whenever
frequencymonths boards
interval,
must
capable 4
and
after be and
with
wherever
of
site red optional
detectingand
acceptance the end points
sub-intervals.
clearly
ambient
glitches,
.................................................................................................................on according
marked
temperature
all spikes
delivered The
and
5.1.2.
4.5.3.Full
by
Any Measured
valuepoints.
window
instructions
SocketsN).
isfor
All
violation
These
the
MCCBs
to -less
designed
values
with
cable Layout
than
Demand
Selectable
length
and
ofshall
tothe
characteristics
1 shall
devicetraining
safety
real
be
adequately be
either
then
power,
Iravailable rules
threshold
set
for
will XLPE
1by
secure
SESAME's
is
allow
device
three
inwith
thefixedorhigh
subject
the
PVC
issteel
phase
at
user to
required
least personnel
total
versions
from penalties;
cascading
wire (if
thirty-two
1-60 as spare.
both
armoring
onany the
performance
settings
3-pole
minutes if
location
...........................................................................................................................
must be violation
and
used.
in 4-with
from
1 minute
of
observed all
40molded-
%intervals.
to 100by 36
parts of
17
levels
2. voltage
5.1.3. equipment, All
Sampling
systems,
SESAME. with
should
incoming
equipment drops.
connecting be
such exceeded.
feeder
andas plates
Storage_Ring_Cable_Trays_Preview_Tender.pdf
proper sequence of
circuit
wiring the
of must panel,
breaker,
terminals. be this
of busbar
power
equivalent must
meters be
thicknessvery
and well
.......................................................................................................................................
operation, troubleshooting and analyzers
to
maintenance connected
the cableand
shall to any
18
be
Cable
theThe  traysthe
insulated.
The
case
panels
pole. whole
terminal
cables
and
or project.
their
miniature
applicable).
% please blocks,
shall betolaid
accessories
refer circuit-breakers
document in cable
must trays according
bedownstream
supplied with 5% to
SR_Breakers_Cables_Tender.xlsx instructions
spares; this is apart from
for
11. 5.1.4.
CONTRACT Review MANAGEMENT
Current
trays
auxiliary  user
attached
All
“Emergency
the
Further
All
The - and shall
exposed
sockets
all
files.
terminations be
acceptance
auxiliaries able
Shutdown”
live
will 180
be toare
(L1,
by
shall setThetothe
L2,text
SESAME
distributedbe besub-interval
on
and
commonthefitted
in aL3)yellow
format
shall
the for with
tunnel 2.7
length
the of
conductors
not PVC
background.
Guarantee from
SolidWorks
withrelease
entire inside
even 1-60
shrouds
Inputs................................................................................................................................
systems detailed installed. drawings in Performance shall
the can
theminutes
(heat-shrink)
.........................................................................................................................bebe
contractor in 1-minute
provided
applicable
cabinets shall 18
from 36
on
from
supervising the
 Pricing
Cables
both
MCCBs Demand
of list,
connecting
engineer
the shalltripbroken
apparent
or
beunit safetydown:
the
rating
designed LTs
power,
officer with
for three
of the
both transformers
phase
SESAME
vertical total will
and (if may
incur
horizontal bea rigid;
penalty all
mounting, other
equivalent
5.1.5. Therefore,
intervals.
The
Voltage  with
For
measured
upon
themselves
be Inputswhere
the types ratings
values and are
should
sizing given be
of in
breakers
as this
specified Specification
contained in 0, with
in and/or
the the panels are
following
............................................................................................................................... shown
please on
refer 18
11.1. Sthe
its
any
CHEDULE
to
the no value
margins
improved
distances.
less
without
appropriate
to
of
than 1orday
above
applicable). more.
for mentioned
engineer.
colors
thedelay
of installation.
according on equipment
thetodelivery
the
onlyand
conductor
andnonot more the than
phase/neutral.
value5 of
.............................................................................................................................................
cables
supervising range,
taken daysthe of project
delay as on37a
whole,
responsibility request.
protected
so the 24 with easily removable
to ensure conformance to the given specification. well fastened transparent acrylic sheets,

1
9876543241
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40

Você também pode gostar