12 ft
R 12 ft R
O
H = 31 ft
19 ft
19 ft
h = 46.1 ft
O''
Y= 3.31 ft
D 15.11 ft
D1= 12 ft
INPUT DATA
Spacing of pile = 3 ft
Spacing of bracing = 16 ft
CALCULATION
Calculation of Pressure
12 ft R
120 x 12 = 1440
x 0.36 = 519.8882162 psf (dry)
125 x 19 = 2375
x
0.36 = 857.4545233 psf (wet) 19 ft
3815
x 0.31 = 1172.191271 psf
12 ft R
Now,
Pp = 0.5 x 354 x D12
equn = Pp x X = 237243.06
By trial D1 = 11.795 ft
equn = -505196 ≈ 0
Pp = 24602.3 #
now
R= T/ 16 = 24601.84596 - 24602.3092299788 = -0.46327 #
(30% increment for bracing & wale design) -0.4632706518 x 1.3 = -0.60 #
equn = -9222 ≈ 0
19 ft
30 ft
519.888 psf 6 ft
12 ft
19 ft
857 psf 30 ft
1172.19 psf
D1
surcharge pressure
= 50.54 psf
12 ft 6 ft
3119.33 #
19 ft
9877.88 #
30 ft
8145.82 #
1516 #
1942.48 #
D1 = 12 ft
519.888 psf 6 ft
12 ft
z ft
19 ft
857 psf 30 ft
1172.19 psf
12 ft
surcharge pressure
psf = 50.54 psf
DESIGN OF UNBRACED SHORE PILE
0 ft
R 0 ft R 2.5 ft
O 22 ft
H = 22 ft
22 ft
22 ft 0 ft
h = 24.3 ft 30 ft
O''
Y= 2.29 ft
D 2.29 ft
D1= 0 ft
INPUT DATA
CALCULATION
Calculation of Pressure
surcharge pressure
= 76.81 psf
0 ft R 22 ft 2.5
8164.36 #
8164.4 x 14.7 = 119635.049993437 ft-lb 22 ft
Now,
Pp = 0.5 x 324 x D12
equn = Pp x X = 179243.88 D1 = 0 ft
By trial D1 = 0 ft
equn = 179244 ≈ 0
For F.S. = 2
Pp = 0 #
now
R= T/ 0 = 11316.60564 - 0 = 11316.6056 #
(30% increment for bracing & wale design) 11316.6056412641 x 1.3 = 14711.59 #
D+Y = 23.29 ft
= 8.355306391 ft
Calculation of Mmax
Mmax applied on Pile by summing moment @ O'
= 137.0250285 kip-ft/ft
ft
ft
ft
2304 #
ft
ft
2304 #
DESIGN OF UNBRACED SHORE PILE
0 ft
R 0 ft R 0 ft
O 22 ft
H = 22 ft
21.976 ft
22 ft 0 ft
h = 52.2 ft 30 ft
O''
Y= 4.03 ft
D 30.27 ft
D1= 26 ft
INPUT DATA
Unit wt of soil (Sat.) below dredge line ɣs' = 62.6 Pcf (y-yw)
Calculation of Pressure
0 ft R 742.89 psf 0 ft
110 x 22 = 2417.8 0 21.98 ft
x 0.31 = 742.8896606 psf (dry)
125 x 0= 0
x
0.31 = 0 psf (wet) 21.98 ft
2417.8 -0.004 ft
x 0.31 = 742.8896606 psf dry earth pressure
0 psf 30 ft
pp'-pa' = ɣs' x (kp-ka') = 184.5 Pcf
pp'-pa' = 185 D1
surcharge pressure
= 76.81 psf
CALCULATION OF EMBEDMENT DEPTH
0 ft R 22 ft 0 ft
lb/ft 8164.36 #
8164.4 x 14.7 = 119635.049993437 ft-lb/ft due to dry earth above dredge line 22 ft
Now,
Pp = 0.5 x 185 x D12
equn = Pp x X = 189076.26 D1 = 26.25 ft
By trial D1 = 26.246 ft
equ = n
-2575231 ≈ 0
Pp = 63547.624201 #
now
R= T/ 0 = 11964.39668 - 63547.6242014462 = -51583.22752 #
(30% increment for bracing & wale design) -51583.2275171942 x 1.3 = -67058.20 #
z = ( p1xD1 - 2xF)/(p1+p2) from base upto max passive pressure zero shear plane O'
D= 26.25 ft
z = 6.921534403 ft
z = 6.92 ft
Force in Anchor, by summing all moments @ O
O
For Cantilever Shore Pile, R should be zero otherwise try another depth, D
ybar 11.353107
a = √ (2 x F / ( ɣs' (Kp - Ka'))) Pp'' 5220.219
C1 28.293434
= 11.38829916 ft 11.38829916 C2 -518.77343
c3 -8834.6886
c4 -141800
Calculation of Mmax
solving 4
Mmax applied on Pile by summing moment @ O' degree Do 22.92
eqn D=Do+Yo 26.95
886.7677754 KN-m/m
DESIGN OF UNBRACED SHORE PILE
0 ft
R 0 ft R 0 ft
O 25 ft
H = 24.6 ft
24.6075 ft
25 ft 0 ft
h = 56.1 ft 0 ft
O''
Y= 5.10 ft
D 31.46 ft
D1= 26 ft
INPUT DATA
Calculation of Pressure
0 ft R 831.78 psf 0 ft
110 x 24.6 = 2707.1 0 24.61 ft
x 0.31 = 831.7795517 psf (dry)
125 x 2.84 = 355
x
0.31 = 109.0767762 psf (wet) 24.61 ft
3062.1 0 ft
x 0.31 = 940.8563279 psf earth pressure
109 psf 0 ft
pp'-pa' = ɣs' x (kp-ka') = 184.5 Pcf
pp'-pa' = 185 D1
surcharge pressure
= 0.00 psf
CALCULATION OF EMBEDMENT DEPTH
0 ft R 25 ft 0 ft
lb/ft 10235 #
10235 x 16.4 = 167923.010748408 ft-lb/ft due to dry earth 25 ft
By trial D1 = 26.36 ft
equ = n
-2792829 ≈ 0
Pp = 64100.863729 #
now
R= T/ 0 = 12912.069 - 64100.8637287539 = -51188.79473 #
(30% increment for bracing & wale design) -51188.7947261221 x 1.3 = -66545.43 #
z = ( p1xD1 - 2xF)/(p1+p2) from base upto max passive pressure zero shear plane O'
D= 26.36 ft
z = 6.529057514 ft
z = 6.53 ft
Force in Anchor, by summing all moments @ O
O
For Cantilever Shore Pile, R should be zero otherwise try another depth, D
D+Y = 31.46 ft
Factor of Safety = 1.30
ybar 13.302747
a = √ (2 x F / ( ɣs' (Kp - Ka'))) Pp'' 5954.3202
C1 32.272241
= 11.83072568 ft 11.83072568 C2 -559.86428
c3 -11171.774
c4 -199856.77
Calculation of Mmax
solving 4
Mmax applied on Pile by summing moment @ O' degree Do 16.77
eqn D=Do+Yo 21.87
627.5341885 KN-m/m