Presenting a arket conditions during
mine-planning 2015 were difficult in min-
model (in this ing and mineral explora-
case generated tion, and all indicators point to a
by Leapfrog continued tough time in 2016.
software) to Miners, like the rest of the indus-
the client try, have been looking hard at their
costs as commodity prices have
plummeted. However, forward-
thinking companies know that it’s
more important than ever to reap
the benefits software can provide.
Miners are still investing in mine
design and planning technology to expand their user licences, and ABB
reduce operating costs through fine- we saw an increase in customer MineScape is part of ABB’s Intelli-
tuning mining plans, increase effi- retention. With our new customers, gent Mining Solutions (IMS) suite,
ciency in operations and redefine we saw increased interest in our which provides an integrated solu-
their economic mining areas. subscription-based licensing, which tion from exploration through to
Mining projects are becoming significantly reduces the initial cost mine design and planning. IMS
more complex and more expensive of purchasing software.” products include the MineMarket
to develop, so planning technology In particular, software vendors that logistics and sales solution; CCLAS
is critical in helping owners identify have invested in enterprise applica- laboratory information management
operations they wish to retain to tions are seeing a renewed interest system; and Production Accounting,
carry them through the downturn, in what they are doing, perhaps which tracks and pinpoints losses
which operations to divest and which more so than those that have within ore-processing systems.
to acquire. focused on increasing features and ABB releases two versions of its
“We are In line with this, and despite over- functions in their desktop products. software solutions per year. In 2015,
seeing a all reduced spending by the mining “We are seeing a definite move by MineScape 5.9 and MineScape 5.10
industry in 2015, most major soft- the mining majors to enterprise archi- were added. New features include:
definite ware providers have reported an tecture,” says Richard Mathews, CEO U CoalLog 2.0 support; an industry-
move by increase in their customer base over at RungePincockMinarco (RPM). “The standard database for data stor-
the past 12 months. leading miners understand that they age, facilitating Joint Ore Reserves
the mining Shaun Maloney, CEO at ARANZ have to be able to share data right Committee (JORC) studies;
majors to Geo, tells MM: “We have continued across their operations in an accurate U New Pit Optimization plug-in for
enterprise to see strong demand and growth as and timely manner, if they want to defining economic pit limits and
companies seek to drive greater continue to get their costs per tonne phases;
architec- innovation and efficiencies into their down and productivity up. U 64-bit version for enhanced per-
ture” existing workflows and processes. “We believe that the next 12 formance;
“2016 looks to be another chal- months will be as tough as, if not U Increased graphics performance;
lenging year; companies are likely tougher than, the last 12 months. U Software developer kit for creat-
to continue to focus on extracting History has shown that in challeng- ing plug-ins;
greater value from their existing ing times, companies that are able U New interface features; and
assets with technology seen as a key to innovate and deliver solutions U Integration between MineScape
to achieving this.” which provide value and savings to Schedule and MineMarket.
Bill Wilkinson, product manager their customers will do OK, and
for mine planning and design solu- those that cannot will find it very dif- Wilkinson explains: “As technology
tions at ABB’s Enterprise Software ficult to survive.” has progressed with data-collection
product group, reports similar find- Despite the difficult conditions devices such as laser scanners, our
ings: “While we saw overall reduced predicted, there is still an air of opti- customers want to utilise the massive
spending by the mining industry in mism for the coming financial year, amount of data they collect in their
2015, the MineScape customer base and with a number of large trade- geologic modelling and mine design
increased by 6%, and these new cus- shows on the horizon including work.
tomers accounted for 30% of the Bauma and MINExpo, there is a “In 2015, we began working on our
2015 MineScape licence revenues. flurry of new and improved products big-data initiative by releasing a
“Existing customers continued to planned for release. 64-bit version of MineScape. In 2016,
Carlson has ciency and improve workflows in Studio RM, resulting from an ongoing
released a new mine planning and operations. The collaboration with Geovariances.
3-D graphics partnership allows customers to inte- A new release of the MSO under-
engine, Precision grate Leapfrog dynamic implicit mod- ground strategic stope-design opti-
3D. Apps and elling into the mine design and plan- miser is also planned. This will cater
plug-ins for this ning processes of Deswik.CAD. Users for more complex shapes to mimic
range from can create a sub blocked model in medium-term planning levels of
topographical Leapfrog Geo, then import it into detail. ”In the mining segment, the
work to drill- Deswik for mine planning, optimisa- Datamine brand will continue as the
and-blast design tion and basic estimation. primary public face of the business,
(as shown here) with additional expertise and sustain-
CARLSON SOFTWARE “Carlson provides them a faster, ability provided by Constellation
The Carlson Mining suite includes easier workflow for their mine design along with opportunities to leverage
modules for Geology, Underground and scheduling than their previous technology from other parts of the
Mining, Surface Mining, Natural software solution,” explains Wenker. company,” explains Dylan Webb,
Regrade, Survey, Civil, Hydrology and “The engineers are very happy with Datamine’s technology director.
GIS. Carlson software lets users work the product and how it has improved Datamine recently won a tender to
in CAD files, using AutoCAD or Intel- their productivity. Worldwide coal supply and implement a geological
liCAD, allowing easy transfer of data sales have slowed, but industrial min- data collection, storage and report-
to others working on the project. erals are picking up the slack. Lime- ing system at a large nickel producer
Grant Wenker, VP and director of stone and aggregates are standardis- in New Caledonia. The company is
mining at Carlson Software, explains ing on platforms, and Carlson Mining also in the process of rolling out its
that the company releases a new ver- is one of their choices going forward Ore Controller system to a multi-
sion of its main office product every for planning and geology.” national gold company. Ore Control-
year, usually in the June quarter, to ler improves the short-term process
coincide with the new version of DATAMINE to manage sampling, modelling, blast
Autodesk products. Datamine’s flagship products include displacement and dig line communi-
“Each of these releases usually the Fusion geological database suite, cation, reducing ore loss and dilution
includes 300 new features and com- Studio products for resource model- in open-pit mine production environ-
mands,” he says. “There are also ling, and a range of strategic to short- ments. For a medium to large gold
“The updates provided by automatic term open-pit and underground or base-metals operation, annual
engineers download periodically throughout the planning applications such as NPV bottom-line improvements can be in
year. Carlson has recently released a Scheduler, Studio OP, Studio 5D Plan- the range of US$20-40 million.
are very new 3-D graphics engine called Preci- ner and EPS. Datamine believes that as commu-
happy with sion 3D. Apps and plug-ins for this Since being acquired by Constella- nications technology and access
new engine range from topographi- tion Software in July 2015, Datamine improves at mine sites, the use of
the product cal work to drill-and-blast design.” (formerly part of CAE Mining) has cloud-based services will increase
and how Carlson states that its software released major upgrades in the form substantially. It has thus invested in a
it has is used by over 90% of the US coal of Studio RM, tailored for resource cloud-based platform called Summit.
industry. “We are seeing new oppor- geologists, and Fusion 8.0 with signifi- “This allows customers to rapidly
improved tunities in India, Indonesia, Mongolia, cant performance improvements in conduct scenario analysis and optimi-
their Mexico and Eastern Europe. Working remote database synchronisation and sation across hundreds of remote
with our Russian distributor, we have new QA/QC reporting functionality. processors, improving the turnaround
productivity” over 50 mines running Carlson Min- 2016 will see a major upgrade to time for decision making and freeing
ing software,” Wenker adds. the Studio OP system, with version up locally based computer hardware
“One major benefit customers see 2.0 combining short- and medium- for ongoing day-to-day tasks,” Webb
right away is cost savings due to the term planning capabilities in a single tells MM.
competitive pricing of the software. environment, and the release of an “A study that typically takes a
Another benefit is that projects are advanced geostatistics module in month using traditional desktop soft-
completed more efficiently, due to
the ease of use of the software, and
the fact that it is AutoCAD based.
“One major thing that separates us
from other mining-software compa-
nies is that Carlson does not provide
consulting services on our software.
We develop, sell and then train on
the software, so the engineers can
use and retain it. This keeps cost
down and productivity high, as the
Datamine Studio engineer is doing their own design
EM is tailor- and planning, not contracting it out.”
made to meet Carlson’s recent customers include
the needs of several Indian coal miners that bought
exploration licences in 2015, and are expected to
geologists add to their purchases this year.
HEXAGON MINING ations require terrain data for deliver- (RBF) option. Domains with shared or
The MineSight Schedule Optimizer ing plans and regular updates in independent structural trends can be
(MSSO) is Hexagon’s go-to product order to quickly turn around new or defined and modelled together in a
for short-, medium-, and long-term revised plans. Information must be single run.
planning. It determines the most pro- retrieved from disparate surveying Vulcan 10 delivers new methods
ductive mining sequence to achieve and measurement sources and then for creating local anisotropies for
the highest project profitability and interpreted before making decisions. implicit modelling, grade estimation
generates practical schedules. Hexagon is developing a live ter- or simulation. This ensures that grade
Block-model scheduling is now rain model capable of integrating estimation matches complex folded
part of MSSO following the Decem- data from total stations, unmanned structures.
ber 2015 release of version 9.3. This aerial vehicles, scanners, LiDAR and Uncertainty modelling has also
lets users import blocks from a block mobile mapping into a streamlined been added, allowing multiple ore-
model and aggregate them into full- workflow. By harnessing these tech- body models to be automatically
bench scheduling units, or smaller nologies, HxM LIVEterrain is intended generated from drill-hole datasets.
scheduling units by defining the to complement autonomous mining, Applying financial information allows
number of blocks in each direction. acquiring terrain data as remotely as mining viability to be quickly assessed
Planners can obtain more accurate possible, and processing it with lim- for different design scenarios.
cycle times from a block to each des- ited human input. Vulcan 10 features improved out-
tination. Hexagon Mining Autonomous, put stratigraphic modelling, including
Hexagon states that mining soft- meanwhile, is developing applications the ability to directly incorporate data
“Big data
ware’s greatest contribution will be that can be incrementally integrated points from drill holes or CAD inputs is a bit
to help companies deal with an ever- into an OEM-independent autono- into gridded output via triangulated of a buzz-
increasing flow of data. “Big data is mous haulage solution. hybrid surfaces.
a bit of a buzz-phrase, but the digital A new open-pit tool will streamline phrase, but
mine of the future is closer than peo- MAPTEK the creation of valid scheduling the digital
ple might realise,” Glenn Wylde, Maptek has a range of solutions for blocks. Users will be able to work
executive vice-president of technol- mine design and planning. Its Vulcan with models containing billions of
mine of the
ogy and innovation at Hexagon Min- software provides a dynamic 3-D blocks, zooming in to view areas of future is
ing, tells MM. environment for modelling, visualisa- interest at greater resolution, with closer than
To that end, the company has tion and analysis of technical data. processing power only used where
introduced HxM Athena, a business- More than 7,000 licences are cur- necessary. people
intelligence and analytics tool that rently installed across all types of Dynamic optimised scheduling will might
can help companies transform their resources and operations. be carried across to Evolution Epoch,
data into knowledge. Vulcan 10, set to be released in set for release in 2016, which will
realise”
“It’s a unique solution based on March, includes a new Automated Pit include new functionality to load sol-
synergies within Hexagon Mining. Designer to create mineable pit shells ids with mining method and tonnage/
Our goal is to understand the big after the optimisation process has grade attributes for short-term plan-
problems, but provide practical, been completed. The model ning. The new tool is able to sched-
achievable and scalable solutions in becomes a dynamic factor in the ule projects containing more than
the short term. HxM Athena is central planning process, allowing engineers 100,000 solids and related activities.
to plans for connecting with enter- to work more efficiently. A hybrid approach from the best of
prise resource planning (ERP) sys- The new Vulcan Data Analyser inte- existing and new Evolution tools
tems. Athena will preside over all the grates variogram analysis tools into a allows users to choose the approach
data that flows in the operation of streamlined workflow leading up to that best fits their operation.
the mine and will be the one source grade estimation. The option pro- I-Site Studio 6, released in January
of information that everyone needs, vides new methods for handling struc- 2016, includes new reporting mod-
including SAP,” says Wylde. tural and grade-based anisotropy, giv- ules and major updates to CAD and
HxM Athena imports, validates, ing users with a better understanding geotechnical functionality. New CAD
analyses and combines data from of their geological data. tools in version 6 reduce the need for
multiple sources. Real-time fleet- Vulcan 10 implicit modelling will users to switch between applications,
management telematics are overlaid include a new radial basis function and provide a better graphical indica-
with geological and geographical
models, planning and mine-centric
KPIs. By displaying the information
in near real-time in a centralised
location, inefficiencies are exposed,
allowing problems to be solved and
productivity improved.
Future versions of HxM Athena
will address safety, production and
machine health, with links to Hexa-
gon’s SAFEmine collision-avoidance
system and Leica Jigsaw Jmineops Implicit
and Jhealth. modelling
Coming later in 2016 will be HxM in Maptek’s
LIVEterrain. Daily planning and oper- Vulcan 10