MECHANICAL DATASHEET FOR FIRE WATER TANKS

Ramesh Iyer
0 5-Oct-2018 Issued for Use SAWS IYER MISS FERR
B 4-Jul-2018 Issued for Review SASH IYER MISS FERR
A 26-Jun-18 Issued for Inter-Discipline Check SASH IYER MISS FERR
Process Mechanical
Rev. Date Issue Description Originated Approved
Review Review
HINDUSTAN PETROLEUM CORPORATION LIMITED (HPCL)
EPCM SERVICES FOR VIJAYAWADA DHARMAPURI PIPELINE PROJECT
Project No: 403102-14960 SHEET
Datasheet No: 14960-000-ME-DAS-0008 1 of 9
MECHANICAL DATASHEET FOR FIRE
WATER TANKS
* For boxes marked with *, if blank, Mfr. Shall determine and submit as per Appendix L. For all lines, see Appendix L for line-by-line instructions.

GENERAL Special Documentation Package Requirements: Specification for Above Ground Tanks - 14960-000-ME-SPC-0007

Measurement Units to be used in API Std 650: SI X US Customary

1. Manufacturer* - Contract No.* -

Address* -

Mfg. Serial No.* - Year Built* - Edition & Addendum to API 650 * Latest

2. Purchaser HINDUSTAN PETROLEUM CORPORATION LIMITED (HPCL) Contract No. -

Address Donakonda and Kalakada

Tank Designation Fire Water Tanks Required Qty. 04 (Four) Nos.

3. Owner/Operator HINDUSTAN PETROLEUM CORPORATION LIMITED (HPCL) Location Donakonda and Kalakada

4. Size Limitations* - Tank Diameter* 15000 mm Shell Height* 8000 mm

Capacity: Nominal* 1414 m3 Net Working* 1100 m3 Criteria* -

5. Products Stored:

Liquid Water Max. S.G.: 1 at - °C

Blanketing Gas - Vapor Pressure* 12.34 kPa (a) at Max. Operating Temp.

% Aromatic - Suppl. Spec.* - H2S Service? Yes No X Suppl. Spec. -

Other Special Service Conditions? Yes No X Suppl. Spec. -

DESIGN AND TESTING Purchaser to Review Design Prior to Ordering Material? Yes X No

6. Applicable API Standard 650 Appendices:* A B X E X F G H I J L X M O P X S U V W X

7. Max. Design. Temp. 65°C Design Metal Temp.* 0°C Design Liquid Level* -

2
Operating Pressure Atmospheric Kg/cm (g)
Operating Temperature Ambient °C Design Vacuum Not Applicable

Design Pressure Full of Water Maximum Fill Rate 137.5 m3/hr (HOLD 1) Maximum Emptying Rate 546 m3/hr

Floatation Considerations? Yes No X Flot. Suppl. Spec:* Applied Supplemental Load Spec.

8. Seismic Design? Yes X No Appendix E X Alternate Seismic Criteria IS 1893 & Civil Design Basis Seismic Use Group VTA

MBE Site Class* VTA Vertical Seismic Design? Yes X No Vertical Ground Motion Accelerator AV*: VTA

Basis of Lateral Acceleration (Select one): Mapped Seismic Parameters? Ss S1 S0 ; Site-Specific Procedures: MCE

Design Required? Yes X No ; X Other (Non-ASCE) Methods* IS 1893 RSM

Freeboard Required for SUG I Design Roof Tie Rods @ Outer Ring?* Yes No X

9. Wind Velocity for non-U.S. sites, 50-yr. wind speed (3-sec. Gust)* IS 875 Part III & Civil Design Basis

Top Wind Girder Style* VTA Dimensions* VTA Use Top Wind Girder as Walkway? Yes X No

Intermediate Wind Girders?* Yes X No Intermediate Wind Girder Style* VTA Dimensions* VTA

Check Buckling in Corroded Cond.? Yes No X

10. Shell Design: 1-Ft Mthd?* Yes X No ; Variable-Des-Pt Mthd?* Yes No Alternate ; Elastic Anal. Mthd?* Yes No Alternate

Plate Stacking Criteria* Centerline-Stacked? Yes No X Flush-Stacked? Yes X No Inside X Outside

Plate Widths (Shell course heights) and Thicknesses (VTC) * Numbers below Indicate Course Number.

1. 2000 mm x 8 mm Thk. 2. 1500 mm x 6 mm Thk. 3. 1500 mm x 6 mm Thk. 4. 1500 mm x 6 mm Thk. 5. 1500 mm x 6 mm Thk.

6. 7. 8. 9. 10.

11. 12. 13. 14. 15.

Joint Efficiency* As per API 650 Shell-to-Bottom Weld Type* As per API 650 Shell-to-Bottom Weld Insp. Mthd* As per API 650

HINDUSTAN PETROLEUM CORPORATION


Client Name: LIMITED (HPCL)
EPCM SERVICES FOR VIJAYAWADA
Project Title: DHARMAPURI PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 2 of 9
MECHANICAL DATASHEET FOR FIRE
WATER TANKS
* If box is blank, Manufacturer shall determine and submit as per Appendix L.

11. Open-Top and Fixed Roofs: Open Top?* Yes X No

Fixed Roof Type* Not Applicable Roof Support Columns*: Pipe Or Structural Shape -

Cone Slope* - Dome or Umbrella Radius* - Weld Joints* -

(Lap, Butt, Other)

Seal Weld Underside of: Lap Joints? Yes No ; Seal Weld Underside of Wind Girder Joints? Yes No

Gas-tight? Yes No Joint Efficiency* - %

Thickness* - In. Snow Load* - App. Suppl. Load Spec.* - Column Lateral Load -

Normal Venting Devices* - Emergency Venting Devices* -

For Non-Frangible Roofs: Seal Weld Roof Plates to Top Angle on the Inside? Yes No ; Weld Rafters to Roof Plates? Yes No

Roof-to-Shell Detail* Not Applicable Radial Projection of Horizontal Component of Top Angle* Inward Outward

12. Bottom: Thickness* 10 mm (VTC) Style* - Slope* 1:120 Weld Joint Type* As per API 650

Provide Drip Ring? Yes X No Alternate Spec. -

Annular Ring? Yes X No Annular Ring: Minimum Radial Width* 800 mm (Min.) Thickness* 10 mm

13. Foundation: Furnished by* By Others Type* -

Soil Allow: Bearing Pressure* - Per Spec.* - Anchors: Size* VTA Qty.* VTA

Foundation Design Loads: Base Shear Force: Wind* VTA Seismic* VTA Overturning Moment: Wind* VTA Seismic* VTA

Ring Forces: Weight of Shell + Roof New* VTA Corroded* VTA Roof Live Load* N/A Internal Pressure* VTA

Partial Vacuum* N/A Wind* VTA Seismic* VTA

Bottom Forces: Floor Wt. New* VTA Corroded* VTA Product Wt.* VTA Water Wt.* VTA Internal Pressure* VTA

Partial Vacuum* Not Applicable Other Foundation Loads* VTA Min. Projection of Fdn. Above Grade: TBC

14. Responsibility for Heating Water, if Required: Purchaser Manufacturer X

Hydro-Test Fill Height* Full tank height Settlement Measurements Required? Yes X No Extended Duration of Hydro-Test:

Predicted Settlement Profile is Attached

Responsibility for Setting Water Quality: Purchaser Manufacturer X Supplemental Test Water Quality Spec.

Test Water Source & Disposal Tie-In Locations By VENDOR Hydro-Test Appendix J Tank? Yes No X

Post-Pressure-Test Activities Required of the Manufacturer: Broom Clean X Potable Water Rinse X Dry Interior X

Other X As per API 650

15. Inspection by ENGINEER / TPI in Shop; ENGINEER / TPI in Field

Supplemental NDE Responsibility VTA Supplemental NDE Spec. By VENDOR

(Purch., Mfg., Other)

Positive Material Identification? Yes No X PMI Requirements: -

Max. Plate Thickness for Shearing As per API 650

Must Welds not exceeding 6 mm (1/4 in.) Be Multi-Pass? Yes No Must Welds greater than 6 mm (1/4 in.) Be Multi-Pass? Yes No

Leak Test Mthd: Roof* - Shell* As per API 650 Shell Noz./Manhole Reinf. Plt* As per API 650

Bottom* As per API 650 Floating Roof Components* -

Modify or Waive API Dimensional Tolerances (see 7.5)? No X Yes Specify:

Specify Additional Tolerances, if any, and Circumferential and Vertical Measurement Locations:
- Allowable Plumbness: Measure and Record at a Minimum of Locations or Every m (ft) around the Tank, at
1
the Following Shell Heights: (select one box): /3 H, 2/3 H and H Top of Each Shell Course Other:

- Allowable Roundness:** Measure Radius and Record at a Minimum of Locations or Every m (ft)

around the Tank, at the Following Shell Heights (select one box):
1 2
Top of Tank, H /3 H, /3 H and H Top of Each Shell Course Other:

**See Data Sheet Instructions for the Maximum Allowable Additional Radial Tolerance.

HINDUSTAN PETROLEUM CORPORATION


Client Name: LIMITED (HPCL)
EPCM SERVICES FOR VIJAYAWADA
Project Title: DHARMAPURI PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 3 of 9
MECHANICAL DATASHEET FOR FIRE
WATER TANKS

16. Coatings:
Internal Coatings by: Tank VENDOR Per Spec.* As per Spec 14960-000-PE-SPC-0005
(Not Req'd., Others, Tank Mfg.)
External Coating by: Tank VENDOR Per Spec.* As per Spec 14960-000-PE-SPC-0005
(Not Req'd., Others, Tank Mfg.)
Under-Bottom Coating by: Tank VENDOR Per Spec.* As per Spec 14960-000-PE-SPC-0005
(Not Req'd., Others, Tank Mfg.)

17. Cathodic Protection System? Yes X No Per Spec.* TBC

18. Leak Detection System? Yes No X Per Spec.* -

19. Release Prevention Barrier? Yes No X Per Spec.* -

20. Tank Measurement System: Required? Yes No X Remote Capability Required? Yes No X

By:* - Per Spec.* -

21. Weight of Tank: Full of Water* 1455 Tons Empty* 40 Tons Shipping* N/A Brace/Lift Spec.* N/A

22. References:* API Std 650, Appendix L

23. Remarks/Notes:*
1. N/A - Not Applicable, TBC - To be confirmed, TBD - To be determined, VTA - VENDOR to Advice.
2. All dimensions are in mm unless otherwise specified.
3. All bolt holes in nozzle flanges and manholes to straddle centers except noted.
4. Shell plates shall be of butt welded construction with complete fusion and penetration. Bottom plate shall be of lap welded construction.
5. All the thickness and weights are preliminary, these shall be confirmed by Vendor during detail engineering.
6. Size and quantity for wind stiffeners shall be designed by Vendor.
7. Requirements of anchors for tanks shall be designed by Vendor.
8. Flanges NPS 24 and smaller shall be as per ASME B16.5. Manhole dimensions shall be as per API 650.
9. Nozzle elevations, orientations and projections shall be confirmed & finalized during detail engineering.

10. Suitable internal & external cathodic protection shall be provided for prevention of corrosion. Design, supply & installation of cathodic protection shall be by tank Vendor.

11. External spiral stairway shall be positioned on the prevailing windward side of the tank. Tank shall be provided with top wind girder walkway platform with handrails all around.

12. Name plate and Grounding Lugs shall be provided as per API 650 standards.
13. Nozzle load analysis as per Appendix P of API 650 shall be carried out mainly for process connections located at the tank shell.
14. As tank is open roof type, tank top shall be covered with fire resistant PP rope braided net (size - 4mm knitting rope) which will be supported by top shell course. Bracing supports
shall be provided to avoid mesh sagging.
15. List of project specifications / requisitions referenced in this datasheet. Vendor shall refer to all applicable project specifications.
Specification for Above Ground Tanks - 14960-000-ME-SPC-0007
Mechanical Design Basis - 14960-000-ME-BOD-0001
Specification for External Painting and Protective Coating - 14960-000-PE-SPC-0005
16. Fire water storage tanks shall be installed at following locations.
Sr. No. Site Location Tag Nos. P&ID Nos.
1 Donakonda 200-FT-101/102 14960-200-SR-PID-0001
2 Kalakada 400-FT-101/102 14960-400-SR-PID-0001
17. All the elevations are from top of the bottom plate.

HINDUSTAN PETROLEUM CORPORATION


Client Name:
LIMITED (HPCL)
EPCM SERVICES FOR VIJAYAWADA
Project Title:
DHARMAPURI PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 4 of 9
MECHANICAL DATASHEET FOR FIRE
WATER TANKS
* If box is blank, Manufacturer shall determine and submit as per Appendix L.
Table 1 MATERIALS OF CONSTRUCTION

Component Material*/Thickness* C.A. Component Material* C.A.

Shell, Course 0 to 1 IS 2062 Gr. B 1.5 mm Reinforcing Pads IS 2062 Gr. B 0 mm

Shell, Course 1 to 2 IS 2062 Gr. B 1.5 mm


Nozzle Necks / Pipes 12" & below SA 106 Gr.B (Seamless) 1.5 mm
Shell, Course 2 to 3 IS 2062 Gr. B 1.5 mm

Shell, Course 3 to 4 IS 2062 Gr. B 1.5 mm Nozzle Necks / Pipes above 12" IS 2062 Gr. B 1.5 mm

Shell, Course 4 to 5 IS 2062 Gr. B 1.5 mm Nozzle Flanges / Blinds 12" &
SA 105N 1.5 mm
Bottom IS 2062 Gr. B 3 mm Below

Annular Ring IS 2062 Gr. B 3 mm Manway Flange / Covers IS 2062 Gr. B 1.5 mm

Wetted Structural IS 2062 Gr. B 1.5 mm Fittings SA 234 Gr. WPB 1.5 mm

Non-wetted Structural IS 2062 Gr. B 0 mm Anchor Chairs IS 2062 Gr. B 0 mm

Name plate / Grounding Lugs SS 304 N. A. Nozzle Gasket As per piping material specification

Manway Gasket Compressed Non-Asbestos Fiber

+ Check here if C.A. is to apply to each exposed surface X

Table 2 BOLTS and ANCHORS

Component Head Type* Bolt or Anchor Material* Nut Material* Thread Series* C.A.

Flange Bolting ASTM A 193 Gr B7 ASTM A 194 Gr 2H ++


Structural Bolting ++
Anchor Bolts ++
Internal Bolting

++ Total C.A., on the nominal diameter.

Table 3 NOZZLE and MANHOLE SCHEDULE* (for Fixed Roof, Shell, and Bottom)

Neck Sch Full Pen. Flange Gasket Bearing Proj. to FF or


Size, NPS, Reinf. Plate Flange Gasket Thick. Gasket Mat'l
Mark Service or Wall On Open. Class or Surf. Dimen. and CL or from
or Dia. (in.) Dimensions Type and Dimen. and Descript.
Thick. (Y/N) Thick. Finish Datum Lines

Refer Page 9 of 9 for nozzle schedule and details

Remarks:

HINDUSTAN PETROLEUM CORPORATION LIMITED


Client Name:
(HPCL)
EPCM SERVICES FOR VIJAYAWADA DHARMAPURI
Project Title:
PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 5 of 9
MECHANICAL DATASHEET FOR FIRE
WATER TANKS
* If box is blank, Manufacturer shall determine and submit as per Appendix L.

OTHER TANK APPURTENANCES

24. Platform, Stairway, and Railing: Galvanizing Req'd?* Yes X No Stairway Style* As per API 650 Walk Surf. Type* As per API 650
(Straight or Helical)

Stair and Walkway Clear Width* As per API 650 National Safety Standards* As per API 650

Architectural/Structural Specification*

Gauger's Platform Req'd? Yes No X Qty. Req'd* - Per Spec.* -

25. Jacket Required?* Yes No X Other Heaters/Coolers Required?* Yes No X

Supplemental Jacket, Heater, or Cooler Specifications* N/A

26. Mixer/Agitator: Quantity Nil Size* Per Spec.* N/A

27. Insulation: Required? Yes No X Thickness* - Material* -

Per Specs* - Responsibility for Insulation and Installation N/A


(Purchaser, Manufacturer, Others)

28. Structural Attachments: Lift Lugs?* Yes No X Desc.* -

Shell Anchorage?* Yes No Type* VTA Scaffold Cable Support? Yes No X

29. Various Other Items: Welded Flush-Type: Shell Connection Cleanout Fitting Waive Application of Appendix P? Yes No X

Miscellany #1 Platforms, ladders, walkway, handrails & stairways Miscellany #2 Complete Cathodic Protection system

Fire resistant PP rope braided net (size - 4mm knitting rope) on top
Miscellany #3 of tank along with supports / cips Miscellany #4 External pipe supports cleats and other attachments

Miscellany #5 Interconnecting Platforms between two tanks Miscellany #6

Table 4 OTHER TANK APPURTENANCES*


Service or
Mark Quantity Description Size Orientation Height from Datum Material Remarks
Refer Page 9 of 9 for dimension and details of the Storage Tank

Remarks:

HINDUSTAN PETROLEUM CORPORATION


Client Name:
LIMITED (HPCL)
EPCM SERVICES FOR VIJAYAWADA
Project Title:
DHARMAPURI PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 6 of 9
MECHANICAL DATASHEET FOR FIRE
WATER TANKS
* If box is blank, Manufacturer shall determine and submit as per Appendix L.

FLOATING ROOF DATA Not Applicable

30. Floating Roof Selection

Design Basis: Appendix C Or Appendix H

Type of Roof: (External or Internal): Single Deck Pontoon* Double Deck*

(Internal Only): Tubular Pontoon* Metallic Sandwich Panel*

Other - Supplemental Spec.: -

31. Seals

Primary Seal: Shoe Envelope Wiper/Compression Plate Other Supplemental Spec.: -

Shoe Mechanism: Mfg. Std. Other -

Electrically Isolate Mechanism from Shoes? Yes No Wax Scrapers Required? Yes No

Minimum Shoe Thickness* - Carbon Steel Shoes to be Galvanized? Yes No

Secondary Seal: Shoe Envelope Wiper None Other Supplemental Spec.: -

32. Data for All Floating Roofs:

Overflow Openings in Shell Acceptable? Yes No Shell Extension? Yes No

Roof-Drain Check Valves Required? Yes No Roof-Drain Isolation Valves Required? Yes No

Freeze Protection for Roof Drains Required? No Yes Supplemental Requirements: -

Roof-Drain Piping to External Nozzles: Mfg. Std. Armored Flexible Pipe Swivels in Rigid Pipe Other

Foam Dam? Yes No Supplemental Spec.: -

Minimum Deck Thickness* -

Bulkhead Top Edges to be Liquid-Tight? Yes No Seal-Weld Underside of Roof? Yes No

Electrical Bonding: Shunts: Yes No Cables: Yes No Supplemental Spec.: -

Qty. of Non-Guide-Pole Gauge Wells Required - Qty. of Sample Hatches Required -

Guide Pole for Gauging? Yes No Slots in Guide Pole? Yes No Datum Plates? Yes No Striking Plates? Yes No

Guide Pole Emissions-Limiting Devices: Sliding Cover Pole Wiper Pole Sleeve Float Float Wiper Pole Cap

Qty. of Roof Manholes* - Minimum High-Roof Clearance Above Bottom: -

Removable Leg Storage Racks? Yes No ; Leg Sleeves or Fixed Low Legs

33. Additional Data for External Floating Roofs:

Weather Shield? Yes No Supplemental Spec.: -

Rolling Ladder Required? Yes No Field Adjustable Legs? Yes No

Design Rainfall Intensity - in./hr. (mm/hr) Based on a Minute Duration Associated with the Storm

Design Accumulated 24-Hour Rainfall - in. Based on the Storm

Distortion and Stability Determinations Required? Yes No Supplemental Specification -

Landed Live Load* -

Remarks:

HINDUSTAN PETROLEUM CORPORATION


Client Name:
LIMITED (HPCL)
EPCM SERVICES FOR VIJAYAWADA
Project Title:
DHARMAPURI PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 7 of 9
MECHANICAL DATASHEET FOR FIRE
WATER TANKS

34. Additional Data for Internal Floating Roofs: Not Applicable

Two-Position Legs? Yes No Cable-Supported Roof? Yes No Fixed-Roof Inspection Hatches Required? Yes No

Internal Roof Drain Required? Yes No Omit Distribution Pads Supporting Uniform Live Loads? Yes No

Corrosion Gauge Required? Yes No Fixed Ladder Required? Yes No ; Type of Roof Vent:* -

Modified Minimum Point Load? Yes No Supplemental Specification -

Mfr. To Leak Test* % of Compartments in Assembly Yard in Erected Position Unknown; see separate contract terms

Roof Erector's Flotation Test: w/ Tank Hydro at Completion of Roof at a Later Date Not Required

Flotation Test Media: Water Product (see H.6.6.1) Water Quality: Potable Other See Supplemental Spec. -

Flotation Test: Duration - Fill Height: -

Flotation Test Items Provided by Purchaser (see H.6.7): None List Attached

Responsible Party for Inspecting Roof During Initial Fill: Purchaser Other -

Table 5 FLOATING ROOF MATERIALS

Component Material*/Thickness* C.A./Coating* Component Material*/Thickness* C.A./Coating*

Deck Plate N/A N/A Datum Plate N/A N/A

Inner Rim Plate N/A N/A Tubular Pontoon N/A N/A

Outer Rim Plate N/A N/A Pontoon Bulkhead N/A N/A

Foam Dam N/A N/A Submerged Pipe N/A N/A

Sandwich Panel Face Plate N/A N/A Guide Pole N/A N/A

Sandwich Panel Core N/A N/A Secondary Seal N/A N/A

Gauge Well N/A N/A Secondary Seal Fabric N/A N/A

Drain Sumps N/A N/A Wiper Tip N/A N/A

Opening Sleeves N/A N/A Wax Scraper N/A N/A

Floating Suction Lines N/A N/A Weather Seal N/A N/A

Primary Fabric Seal N/A N/A Envelope Fabric N/A N/A

Foam Log Core N/A N/A Shoe Mechanisms N/A N/A

Landing Legs N/A N/A Primary Seal Shoe N/A N/A

Landing Leg Bottom Pads N/A N/A Removable Covers N/A N/A

Manhole Necks N/A N/A Rolling Ladder N/A N/A

Vents N/A N/A Inlet Diffusers N/A N/A

Remarks:

HINDUSTAN PETROLEUM CORPORATION


Client Name:
LIMITED (HPCL)
EPCM SERVICES FOR VIJAYAWADA
Project Title:
DHARMAPURI PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 8 of 9
MECHANICAL DATASHEET FOR FIRE WATER
TANKS
* If box is blank, Manufacturer shall determine and submit as per Appendix L.

Tank Sketch (Note 17):

Note 14

N3
N1
HHLL (7270 mm) N7
HLL (7070 mm) N8

NLL (4300 mm)


Shell 7600 7400
height mm mm
8000
mm MW1 MW2
LLL (1530 mm) N6
750
750 N5 mm
mm N2 400
350 LLLL (760 mm) mm
mm 300 N9 N4 380
300 mm
mm mm

Slope 1:120

ID 15000 mm

Nozzles Per Tank (Note 9)


Nozzle No. Size Rating Type Qty. Service Remarks
N1 4" 150# WNRF 1 Fire Water Inlet (Filling ) With Dip pipe (HOLD 2 & 3)
N2 10" 150# WNRF 1 Outlet to FW pump suction header
N3 6" 150# WNRF 1 Overflow connection
N4 6" 150# WNRF 1 Drain Outlet With Dip pipe
N5 8" 150# WNRF 1 Test header line inlet
N6 10" 150# WNRF 1 Tank Interconnecting line
N7 2" 300# WNRF 1 Level Gauge
N8 2" 300# WNRF 1 Level Gauge
N9 6" 150# WNRF 1 Drain Outlet With Dip pipe
N10 6" 150# WNRF 1 Spare Nozzle
M1 24" As per API 650 1 Shell Manhole - 1 c/w cover plate. Manholes shall
M2 24" As per API 650 1 Shell Manhole - 2 be 180o apart from each other

Holds:
1. Maximum filling rate will be confirmed later
2. Inlet nozzle size will be confirmed later
3. Dip pipe details will be confirmed later.

HINDUSTAN PETROLEUM CORPORATION LIMITED


Client Name:
(HPCL)
EPCM SERVICES FOR VIJAYAWADA DHARMAPURI
Project Title:
PIPELINE PROJECT
Project No: 403102-14960
Datasheet No: 14960-000-ME-DAS-0008 Page 9 of 9