Rev 1
March 13, 2017
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Table of Contents
1.0 Scope and Purpose ....................................................................................................................................................4
1.1. Scope...........................................................................................................................................................................4
1.2. Purpose......................................................................................................................................................................4
2.0 Definitions and Acronyms ......................................................................................................................................4
2.1. Definitions................................................................................................................................................................4
2.2. Acronyms..................................................................................................................................................................6
3.0 Equipment Owner’s Reporter Instructions.....................................................................................................7
3.1. Downloaded Report .............................................................................................................................................8
3.2. Submit Failure Report......................................................................................................................................15
3.3. Root Cause Options, Definitions and Examples.....................................................................................16
4.0 Equipment Owner’s Super-User Instructions .............................................................................................18
5.0 Analysis .......................................................................................................................................................................21
5.1. Failure Causes......................................................................................................................................................21
5.1.1. Physical Causes...............................................................................................................................................21
5.1.2. Human Factor Causes ..................................................................................................................................21
5.1.3. Systemic Causes .............................................................................................................................................21
5.2. Analysis Overview .............................................................................................................................................21
5.3. Cause Immediately Known.............................................................................................................................22
5.3.1. Resources..........................................................................................................................................................22
5.3.2. Closure ...............................................................................................................................................................22
5.4. SME Review ..........................................................................................................................................................23
5.4.1. Resources..........................................................................................................................................................23
5.4.2. Closure ...............................................................................................................................................................23
5.5. RCFA ........................................................................................................................................................................24
5.5.1. Physical Evidence ..........................................................................................................................................24
5.5.2. Resources..........................................................................................................................................................24
5.5.3. Closure ...............................................................................................................................................................24
6.0 Capture and Share Lessons Learnt ..................................................................................................................24
2
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
3
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
1.1. Scope
This document applies to the owner of blowout prevention equipment for drilling wells when
reporting equipment failures.
The scope has been expanded to include all API S53 equipment components:
Auxiliary Equipment (Drillstring valves and gas separation equipment)
BOP Stack
BOP Controls (Primary, Secondary and Emergency)
Choke Manifold Equipment
Diverter System (Although this is not included in API S53, it is too closely related to not
include it here)
Riser System (The riser system is included because of the choke and kill lines and it does not
make sense to only include those lines and not the equipment that carries them.
1.2. Purpose
This document has been developed with the intent of providing instructions and definitions to
produce a standardized industry reliability and performance database.
2.1. Definitions
Cause Immediately Known: When there is a high degree of certainty in the failure
cause, the failure report described in Section 3 is
completed describing the failure and defining the root
cause based on inspection and maintenance personnel
experience and knowledge.
4
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
5
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
2.2. Acronyms
6
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
A failure report shall be created for each failure of any component of API 53 Equipment, whether
there is NPT or not. This database was designed to trend failures to allow us to focus on problem
areas and the policy was rigid in that if we do not report all failures then we are shortchanging
ourselves.
With the benefit of hindsight, we can acknowledge that this was too rigid. In the beginning, we
reported, for example, a choke valve as a failure if it did not hold a test even if a single open/close
cycle was sufficient to correct this. While we do not condone many repeated cycles to try and achieve
a successful test, we have to accept that a foreign body could prevent the full closure of the valve and
clearing this with a single function cycle is not an equipment failure.
We should, however, continue to report failures that come to light during maintenance and testing
as well as during operation, but replacement of a ram packer, for instance, because you do not expect
it to last the next well, is not a failure; it is simply maintenance.
The report should be created, and submitted, as soon as possible after the event is discovered.
Log into the site using the credentials that have been sent to you separately.
Once in the site first time only, go to: My Profile (top right corner) Change Your Password and
Save Changes.
Select:
MANAGE WELL the Manage Well
Then check to see that the information is correct, or click on Add Well as appropriate.
The Add Well option is where the well number information is input This is also where you include
the number of riser joints run on the well. This data is used for statistical information when charting
riser failures against the quantity of riser joints in use across the database.
When this data has been confirmed to be correct, then select: Save
This default well data will be used to populate all reports until the data is changed for subsequent
wells.
FAILURE REPORTS
You then have two choices. If your company prefers you to download the
form, fill it out and then send it to town, then select
7
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Rig Owner / Drilling Contractor: Select your company name. If reporting online, then this
should already be prepopulated with your company
name.
Owner’s Primary Contact: Title of person who is familiar with the issue in case
further information is required. This could be the person
reporting, but that is a company decision.
Email of Owner’s Primary Contact: Email address for the Primary Contact.
Name of Person Reporting: This the name of person filling out event report. If the
report is being completed online this field should be
prepopulated based on the log-in name of the reporter.
OEM Rep. Onboard, if applicable: Name of any OEM representative on the rig that was
involved in the component analysis.
Well Identification
8
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Not every well has all of these numbers. Provide what your well has.
If the rig is not on contract, then state “Not Applicable”.
Other Information
Owner Specific Equipment ID Number: An SFI code or similar that the equipment owner uses to
identify the specific equipment or component.
OEM Incident Reference Number: Reference number issued by the OEM if involved.
Component sent on shore: Disposal; No; OEM analysis; OEM Repair; Storage; Third
party Analysis; Third party Repair.
NO should be selected in this dropdown box if the
component was not sent ashore. If the component was
sent ashore, the appropriate reason should be selected.
Equipment
9
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Observed Failure: What alerted you to this event? This dropdown box is
focused from the component selection. Select the failure
mode for the component in this dropdown box.
OEM Part Number: Free text field to enter the identifying part number as
established by the OEM.
OEM Serial Number: Free text field to enter the OEM’s unique identifying
serial number.
10
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Component History
Date Affected Component was installed: This is a calendar field on line but only a free text field
on the downloadable form to record the date that the
component was installed into the system on the rig.
If YES, what maintenance was deferred: BWM/EOW; Quarterly; Annual; Five-Yearly; Other?
Dropdown box to select what category of maintenance
was deferred (BWM/EOW, Annual, 5-Year, etc.).
Date of Last Maintenance: This is a calendar field on line but only a free text field
on the downloadable form to record the date of the last
planned maintenance actually completed.
Description of Last Maintenance: Adjustment; Cleaned and Inspected; Installed seal kit;
Installed repair kit; No previous maintenance.
Dropdown box to select the maintenance that was
performed.
Amount of Usage at the Time of Failure: Number field and a dropdown box to select Hours or
Cycles (or Unknown) to associate to the whole number.
If you have automatic cycle counters, or the discipline to
actually count the cycles, then record them for valves,
cylinders and pistons. Record hours for pumps or if
‘cycles’ are not available.
11
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
8 - Repair Rig
9 - Cut Off Drilling Line
10 - Deviation Survey
11 - Wire Line Logs
12 - Run Casing & Cement
13 - Wait On Cement
14 - Nipple Up B.O.P.
15 - Test B.O.P.
16 - Drill Stem Test
17 - Plug Back
18 - Squeeze Cement
19 - Fishing
20 - Dir. Work
21 - Running / Retrieving Riser Equipment
22 - Testing Surface Equipment
23- Other
A - Perforating
B - Tubing Trips
C - Treating
D - Swabbing
E - Testing
F - NULL
G - NULL
H – NULL
Water depth: Free text field to input an integer and a dropdown box
to select Feet or Meters to associate to the integer.
Drilling Fluid Type: Brine; Seawater; Synthetic Based Mud; Water Based
Mud.
Dropdown box to select from the commonly used fluids.
12
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Glycol: 0; 5; 10; 15; 20; 25; 30; 35; 40; 45; 50; 55; 60%
Number field to record the percentage of glycol in the
mixture.
Was the last laboratory sample acceptable?: Yes/No dropdown to record the answer to the question.
N.B. This specifically refers to the last laboratory sample
(as opposed to a rig test).
Date of last sample: This is a calendar field on line but only a free text field
on the downloadable form to record the date of the last
laboratory analysis.
Event Data
Event Date: This is a calendar field on line but only a free text field
on the downloadable form to record the date.
When did the event occur?: BOP #1 IN Operation, BOP #1 NOT In Operation, BOP
#2 IN Operation or BOP #2 NOT IN Operation.
If you only have one BOP then select the appropriate
version of BOP#1.
13
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Description of Event: Free text field where sufficient, but concise, information
should be stated so that the reader understands what
failed, what were the symptoms, what was being
functioned at the time of failure and why was it being
functioned. Include any related details that are deemed
pertinent. Do not include any unnecessary information.
Hours of Repair time: Integer field that should only include the actual time to
repair and test the failed component only.
Did the event cause a BOP Stack pull?: Yes/No dropdown box to record if the failure was a
direct factor in the decision to retrieve the subsea BOP
stack for repairs.
14
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
The first, and preferred option, is based on submitting the data directly to the database online. To
do this select the Submit Failure Report/Fill out Report path and fill out the report using all of
the provided drop downs. This will allow you to take advantage of the fields that are pre-populated
as a result of the way the database is set up.
The second option is based on uploading the data using an incident report completed using the
offline input form. To do this select the Submit Failure Report/Upload Report path. The data will
be loaded into the database and the report will be placed in the “Draft” state.
15
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Assessment Pending: This should be selected if, for instance, the BOP stack is
still subsea. The failure will be investigated when the
BOP stack becomes accessible and the root cause can be
evaluated.
16
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Pressing the ‘Submit’ button will upload it to the web and alert the appropriate super-user who will
then quality check the report, correct any errors and approve it thereby adding it to the database.
Each time a report is modified and updated, a copy will be sent to the appropriate Super-user, System
Integrator and Operator.
17
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
First time only, go to: My Profile (top right corner) Change Your Password
and Save Changes
FAILURE REPORTS
It is preferable to select the second option followed by Fill out Report to fill
out the report electronically and automatically submit it to the database.
Some equipment owner’s will prefer to have the reporter download the excel
spreadsheet version and submit it internally for approval before the report is
uploaded by selecting Upload Report.
All With this tab highlighted, the list will show all of your company failure reports
(subject to the time period selected on the last tab).
In Progress This selection will show all reports that have been opened and saved, but not
yet completed and submitted (subject to the time period selected on the last
tab).
Draft This selection will show all reports that have been completed and submitted,
but are waiting on Super-User approval (subject to the time period selected
on the last tab).
Approved (Open) This selection will show all reports that have been approved with either
‘Assessment Pending’ or ‘RCFA Required’ selected as root cause (subject to
the time period selected on the last tab).
Approved (Closed) This selection will show all reports that have been approved and closed
(subject to the time period selected on the last tab).
Reject This selection will show all reports that have been rejected and archived in
the database for whatever reason (subject to the time period selected on the
last tab).
30 Days Here you can select the time period of reports you are looking for. The options
are 30days, 60 days, 90 days or ALL.
DATABASE REPORTING
18
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
This is a simple view of all of the participating systems, similar to what we had
available on the monthly reports. You can change the views by selecting
specific filters.
This is currently a work in progress. The filters at the top will allow the
selection of any field in the database as a means of preparing a customized
data extract for export from the database in the form of an Excel file.
What is currently more useful is the ability to export the entire database to
Excel, from where you can search and filter to your hearts content. Do not
share this data in any kind of searchable format.
Your company data will be fully visible. Other company data will have all
identifying details anonymized.
RIGS
Here you can see the status of your fleet where there is the capability of
adding a rig either by clicking on Download Rig Form, filling this out and
then use the Submit Rig button to upload the information.
The right-hand column (“Actions”) has seven options that can be selected for
each rig:
Edit Rig: This allows you to edit the basic rig details for a rig already added to the
database. It also allows the selection of 1 stack or 2 stacks for that rig.
Edit Configuration: Here you can change the details of the equipment on the rig. It is not a
complete IADC equipment list as it only lists the API S53 well control
equipment that is included in the database.
Add Configuration: This will be used to add a new configuration for an existing rig and should
only be used in those cases where you are making a radical change to the
existing Well Control Equipment configuration. As an example, the type of
radical change we have in mind here is where there is an addition or reduction
in the number pipe rams in the stack.
Asset Disposal: This should only be used in the event that a rig is no longer a part of your fleet
and the asset has either been disposed of through sale or scrapping.
Show Configuration: Here you can see the complete configuration that has been submitted for this
rig. If somebody has earlier clicked on ‘Add Configuration’ then you will see
19
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
more than one version listed. If it was an accidental addition then the new
version will be an empty form.
Manage Well: Here we should see the well data that has been applied by the Reporter. If not
then the Super-User can address it here.
Not every well will have all three numbers assigned. Every well will have at
least one number but include all that you can.
The Add Well option also asks the Reporter to include the number of riser
joints run on the well. This data is used for statistical information when
charting riser failures against the quantity of riser joints in use across the
database.
This default well data will be used to populate all reports until the data is
changed for subsequent wells.
Manage Contract: Here you will find contract information and an Add Contract button to allow
new contract details to be included.
PARTICIPANTS
USERS
A current list of your company users. The Super User can set up, or disable,
Reporters, Super Users or Executive Users. Please be careful with this
capability. Do not forget that the data collectively belongs to the members and
should not be accessible to non-members of the JIP.
20
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
5.0 Analysis
Effective investigation is essential to identify the causes (i.e. Physical, Human, and Systemic) and root
causes of a failure to enable learning, improvement and removal of component failures. Removing
component failure causes increases inherent reliability and safety.
The initial scope of any investigation must be based on factual information (e.g. hose failure, valve
leaking in closed position) relating to failure.
As part of the investigation processes, three types of causes are identified in order to understand the
root cause(s) of the failure. These are:
These are the consequences, manifestations or outcomes, known or determinable, that initiate or
trigger component failure. Examples include corrosion, fatigue, excessive stress, erosion, rupture,
etc.
These are related to human activities that contribute to component failure. Identifying and
understanding the contribution of human factors during component failure investigations will
improve corrective action identification and component performance. Examples of human factors
include; fatigue, complacency, stress, environmental conditions, etc.
These are related to any system or process activity that results in a reoccurring event. These include
processes used to execute the work.
NOTE: If the failure is part of a wider event then the appropriate investigative
procedure may need to be followed IN ADDITION to the creation of the report on
component failure.
This section presents the three levels of analysis to be applied with regard to events recorded in the
RAPID-S53 database:
21
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
NOTE: If an investigation at one level fails to determine the root cause of the failure,
then the analysis can be promoted to the next level as appropriate.
As shown in the Failure Report Process (APPENDIX 2), in the event that the root cause is immediately
known, the relevant notifications are issued immediately a component failure report is submitted to
the database and is moved to an “Approved (Closed)” state.
If the component failure has resulted in a loss of a well barrier, if it has required the LMRP or
BOP stack to be retrieved, or if the failure has become a systemic/reoccurring event, then an
RCFA is always required.
Other events require an SME Review to be conducted by a subject matter expert, and reported.
NOTE: There will be occasions where a component failure has previously been
categorized as ‘Cause Immediately Known’ or ‘SME Review’ becomes ‘RCFA required’
because such an issue has now occurred multiple times and, as a result, becomes
classed as ‘Systemic/Reoccurring’. The previously published reports do not need to be
reclassified, but they may be referred to in the RCFA.
An O-ring damaged during installation can, for example, normally be categorized as ‘Cause
Immediately Known’. It is important to report such issues because if something like this were to
escalate to a systemic/reoccurring event then it may warrant a change to the design or
installation/maintenance procedure.
5.3.1. Resources
The Senior Subsea Engineer should discuss what happened with another technical member of crew
to determine:
What happened?
How it happened?
Why it happened?
5.3.2. Closure
When the cause of the failure is immediately known, the investigation is considered closed when:
A report is created in the database, with sufficient justification in the free text “Description of
Event’ to support the root-cause selected from the drop down box.
The selection and the report are approved by the equipment owner’s super-user.
22
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
An SME Review is conducted when the cause of the failure is questionable and the component failure
has not triggered an RCFA (not an unplanned BOP pull, loss of well barrier, or systemic/reoccurring).
An SME Review is conducted when a failed component requires disassembly to ascertain the cause
of the failure and when the frequency (not systemic) and consequence (no loss of barrier or bop
retrieval) of the component failure are considered to be low.
If a ram failed to hold pressure during pre-deployment testing and upon opening the doors/bonnets
it was clearly seen that the packers were well worn, then an SME Review could check the records to
see if the number of functions met the expectations. Then after the rams have been successfully tested
with new packers to confirm that there was no other issue, and assuming the number of functions
met expectations, the failure can be attributed to ‘Wear and Tear’. If, however, the rams fail to test
and / or the function cycles were less than expected, the causal agent is something other than ‘Wear
and Tear’.
5.4.1. Resources
5.4.2. Closure
An SME Review Report (See APPENDIX 4), identified by the unique number used when the initial
report was submitted, must be produced. This report should arrive at a logical conclusion based on
a sound evaluation of the physical causes of what, how and why a failure occurred. The incident can
be considered closed when the Equipment Owner Super User updates the component failure report
in the database by selecting the appropriate Root Cause from the drop down box, hence closing the
initial report, and publishes the final report.
23
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
5.5. RCFA
5.5.2. Resources
Typically, at least one SME plus the OEM or a suitably qualified third-party are utilized.
5.5.3. Closure
An RCFA report (See APPENDIX 4), identified by the unique number used when the initial report was
submitted, must be produced. This report should arrive at a logical conclusion based on a sound
evaluation of the physical and any human causes of what, how and why a failure occurred. This
document is for internal use within the affected company.
The incident is considered closed when the Equipment Owner Super User updates the component
failure report in the database by selecting the appropriate Root Cause from the drop down box, hence
closing the initial report, and publishes the final report.
24
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
25
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
26
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
27
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
28
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
While being company specific in design, the final reports must include:
The initial report unique identification number
Details of the component that failed (Part Number, Serial Number, Description,)
Date of the failure
Details of the failure
Date that the investigation commenced
Date that the investigation was completed and the report published
Investigation team member details
Failure cause(s)
Findings (including any photographs or drawings, third party reports or other supporting
information.
Recommendations
29
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
ANNULAR BOP
RAM BOP
30
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
31
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
32
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Connectors
Riser Mandrel
33
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Flex Joint
34
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Riser
Diverter Housing
Diverter Assembly
35
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
Auto Chokes
Manual Chokes
36
RELIABILITY AND PERFORMANCE INFORMATION DATABASE FOR API S53 WELL CONTROL EQUIPMENT
GUIDANCE DOCUMENT
37