Project No. Project Title Facilities INFORMATION Tag no. System/Subsystem No.
INSPECTION / TEST OK N/A P/L No
1 Items installed, calibrated and designed according to attached Project Design Specification. 2 Verify that ITR-A is signed off prior to starting any work
3 Check that control panel equipment is completely installed and functioning
4 Confirm the driver /gearbox/driven equipment is correctly aligned
5 Carry out manufacturers’ recommended Pre-commissioning and Start-up
checks 6 Carry out manufacturers’ recommended No-load test (if applicable)
COMMENT(S) AND ADDITIONAL INFORMATION:
COMPLETED BY VERIFIED BY ACCEPTED BY
Designation Contractor Representative PMT Inspector Commissioning Engineer Company Name Signature Date