INSPECTION TEST RECORD (ITR) - B

MISCELLANEOUS EQUIPMENT M35-B


Project No.
Project Title
Facilities
INFORMATION
Tag no. System/Subsystem No.

INSPECTION / TEST OK N/A P/L No


1 Items installed, calibrated and designed according to attached Project Design
Specification.
2 Verify that ITR-A is signed off prior to starting any work

3 Check that control panel equipment is completely installed and functioning

4 Confirm the driver /gearbox/driven equipment is correctly aligned

5 Carry out manufacturers’ recommended Pre-commissioning and Start-up


checks
6 Carry out manufacturers’ recommended No-load test (if applicable)

COMMENT(S) AND ADDITIONAL INFORMATION:

COMPLETED BY VERIFIED BY ACCEPTED BY


Designation Contractor Representative PMT Inspector Commissioning Engineer
Company
Name
Signature
Date