Você está na página 1de 1

(xvi) Indian Boiler Regulations

FUSIBLE PLUGS
331. General 211
332. Type 211
333. Material 211
334. Attachment to Boilef 211

FEED VALVES
335. General 212
336. Operating Position 212
336A. Requirements as to Feed Apparatus in Certain Cases 212
CHAPTER VII
BOILER AND SUPERHEATER TUBES, HEADERS & OTHER PARTS
TUBES
337. Material and Construction 213
338. Boiler and Super Heater Tubes, Headers and other Pressure Parts Tubes 214
HEADERS AND SIMILAR PRESSURE PART S
339. Material and Construction 217
340. Rectangular Headers Symmetrical in Form 217
341. Headers Irregular in Form 220
342A. Cylindrical Headers 220
342B. End Attachments 220
CHAPTER VIII
STEAM-PIPES AND FITTINGS
343. Pipes 221
MATERIAL
344. Steel Pipes 222
345. Condition of Pipes 222
MECHANICAL TEST
346. Number of Sets of Tests 223
347. Tests 223
348. Method of Manufacture, Heat Treatment and Marking 225
349. Steam-Pipes and Fittings 226
350. Steel Pipes 226
351. Cast Steel Pipes 227
352. Copper Pipes 228
FLANGES
.353. Flanges 229
354. Screwed on Flanges 229
355. Loose Flanges 230
356. Riveted on Flanges 230
357. Welded on Flanges 231
358. Flanges of Copper Pipes 233
359. Standard Flanges 234
360. Joints 234
STEAM-PIPE FITTINGS AND CONNECTIONS
361. Wrought Bends . 239
361A. Butt-Welding Fittings 241

Você também pode gostar