1.0 General
1.1 This Method Statement describes the technical requirements, activities, methods
and required site management to be executed in carrying out for the installation of
instrument air supply piping that is located at JG Summit Stage 1 Expansion Project
that is located in Barangay Simlong, Batangas City, Philippines.
1.2 Definitions
“Project” shall mean “Naphtha Cracker Expansion & Second Stage
Pygas Hydrogenation Unit for the JG Summit Stage 1
Expansion Project”
“Owner” JG Summit Olefins Corporation
“PMC” Fluor Corporation and JG Summit Olefins Corporation
“Contractor” Ventanas Philippines Construction Inc.
“Subcontractor” To be updated
“Licensor” CB&I Lummus
JG Summit Stage 1
A4-JGS1EP-EPC1-MS-70-015 Rev. A Page 4 of 8
Expansion Project
2.3 Drawings
3.0 Organization
3.1 Contractor Organization
JG Summit Stage 1
A4-JGS1EP-EPC1-MS-70-015 Rev. A Page 5 of 8
Expansion Project
5.0 Schedule
Detail schedule is as below according to project level 3 schedule. However it will be
adjusted by site condition and method statement approval.
Instrument Schedule
No. Area Length Remark
Q'ty Start End
6.1 Handling
- Every Items delivered shall be inspected to ensure compliance to specification, Data
sheet & free from damages. Offloading shall be in responsible
METHOD STATEMENT FOR
INSTALLATION OF INSTRUMENT
AIR SUPPLY PIPING
JG Summit Stage 1
A4-JGS1EP-EPC1-MS-70-015 Rev. A Page 6 of 8
Expansion Project
6.2 Preparation`
METHOD STATEMENT FOR
INSTALLATION OF INSTRUMENT
AIR SUPPLY PIPING
JG Summit Stage 1
A4-JGS1EP-EPC1-MS-70-015 Rev. A Page 7 of 8
Expansion Project
Work procedure
6.3 Inspection
This section defines the potential job safety hazards arising from the general works
and the hazards during and until the completion.
Job Hazard Analysis and the corresponding mitigation measures are tabulated and
expounded in the herein enclosed.
JG Summit Stage 1
A4-JGS1EP-EPC1-MS-70-015 Rev. A Page 8 of 8
Expansion Project
out and work will commences in accordance with specific measures as indicated in
work permit
7.2.3 All necessary Personal Protective Equipment (PPE) will be provided and to be worn
in accordance with the site safety requirements
7.2.4 Site working area will be kept in clean and tidy manner after any work activities have
been carried out
7.2.5 Morning Tool Box Meeting (TBM) shall be held daily at site detailing potential hazards
associated with the work, and implement necessary action, thereby minimizing or
eliminate hazard exposure to workers
7.2.6 Barricade protection unauthorized person access to Relocation area