PILKHANI SAHNEWAL NOTE:-
SE
NW
E
N
NE
1. PROPOSED WORKS ARE SHOWN IN RED.
CH: 296500
Bitumen Road
5. MINIMUM OF 6m TRACK CENTER MAINTAINED BETWEEN ADJACENT TRACK TO EXISTING IR TRACK IN
CH: 296600
STATION YARD PORTION.
CH: 296700
FL:267.627
6. DFC CHAINAGE OF 0.000 m IS WITH REFERENCE TO THE IR KM POST OF 192.000
To NH44
CH: 296800
7. PUBLIC UTILITIES, HT, LT LINES AND OFC CABLES,WATER LINES etc., INTERFERING DFC LINES SHALL
CH:297000
BE RELOCATED.
8. PLAN OF LONGITUDINAL AS WELL AS CROSS DRAINAGE WORKS BETWEEN IR & DFC BANKS SHALL BE
EXISTING RAILWAY BOUNDARY SUBMITTED SEPARATELY FOR APPROVAL.
House House 9. ALL CANAL BRIDGES REQUIRED TO BE APPROVED BY CANAL AUTHORITIES.
10. NECESSARY EMBANKMENT/SLOPE PROTECTION WORK DESIGN & DRAWING WILL BE SUBMITTED
20.340 m BM:P7
IR UP MAIN LINE SEPARATELY.
RL 267.690 Gov't Building 11. UNDERTAKING OF NO EXTRA CLAIM FOR DESIGN & EXECUTION OF WORK DUE TO CHANGE IN
E 647559.461 IR DN MAIN LINE
Trolley Refuge N 3377747.502
HP
BM:P6
TURNOUT LENGTH AND DRAINAGE DESIGN HAS BEEN GIVEN BY GIL-TPL
RL 267.889 JV/EDFC/301/2017-18/DESIGN/0424 DATED:26.07.2017
OHE296/15
Lc No:138C/E2 E 647226.779
OHE296/17
Trolley Refuge 12. DURING CENTER LINE STAKING IF GROUND LEVEL SHOWN, FOUND TO BE MAJOR VARIATION,
OHE296/19 N 3378007.577 22.130 m
OHE296/19T
DESIGNER TO BE INFORMED.
NB
OHE296/21
OHE296/23
OHE296/16
OHE296/25 13. THE LAND BOUNDARY SHOWN IN THE ALIGNMENT DRAWING IS TENTATIVE ONLY. FOR ACTUAL
OHE296/27
12.776 m OHE296/18 ACQUISITION REFER LAND PLANS OF THAT CORRESPONDING SECTION.
OHE296/20
NB
Gov't Building OHE296/22 14. RAIL LEVEL HAS BEEN MODIFIED WITH CONSIDERING 350mm BALLAST CUSHION UNDER RAIL SEAT.
OHE296/24
12.636 m OHE296/26
OHE296/28
15. RUB 1 x 5 x 5 m RCC BOX SHOWN AS PER IR APPROVED GAD NO:
5.383 m 16. LOCATIONS PRONE TO FLOODING IN THE SECTION: NO
Trolley Refuge 12.632 m 12.610 m 17. WATER LOGGED AREA/ MARSHY LAND WHERE GROUND IMPROVEMENT REQUIRED: NO
Trolley Refuge
35.491 m 35.491 m
18.388 m Trolley Refuge
CH: 105700
PROPOSED DFC TRACK 35.491 m 36.332 m
CH: 105800
Trolley Refuge 36.332 m
CH: 105600
CH: 105900
AT CH: 296789.172 m
1 x 5 x 5 m RCC BOX
CH:106000
REFERENCE DRAWINGS :-
NOT IN SCOPE
1. FOR KEY PLAN REFER DRAWING NO. 301-2/AL/0001.
2. FOR LEGEND AND ABBREVIATIONS REFER DRAWING NO. 301-2/AL/1000.
d
oa
3. FOR BALLAST PROFILE REFER TR. NO. 1828(FOR DFC MAIN LINE) & TR. NO. 1952(FOR DFC YARD
nR
AND LOOP LINE).
me
ala Bitu
PLAN
1:1000
hiw
ks
Ba
KM-297
To
SS
13 m LA
E,
o. 1 C
/2
N 7 C'
8C
m THIS CONSTRUCTION DRAWING OF PLAN & PROFILE IS PREPARED BASED
B .1 '
U 89 /2E
X 734 ON DEFENITIVE DRAWING APPROVAL BY DFCCIL COMMUNICATED UNDER
B 3.
O
I R 967 8C
C 587 TR. NO. 0506(R2).
.M 2 3
O H: . 1
BVC 105979.101
EVC 105999.101
C
R 10
PVI 105989.101
PR C NO
m H:
PE
AT C.
Elev 267.636
Elev 267.627
Elev 267.621
270 5
x C
O
L
SC
EXISTING IR FORMATION PROFILE 5 FC
x
1 TD
IN
PROPOSED DFC FORMATION PROFILE
T
A
O
N
EXISTING GROUND PROFILE AT CENTER LINE OF DFC TRACK
TRACK STRUCTURE
Difference between
FL and RL Under Rail Seat
RAIL SECTION: 60Kg/m (UIC 60Kg/m)
IR Line DFC
172mm 172mm
DATUM ABOVE MSL : 265 m 265
RUBBER PAD 6mm 10mm
SLEEPER DEPTH 210mm 210mm
HORIZONTAL ALIGNMENT BALLAST CUSHION 300mm 350mm
L = 5714.482m
Total Depth (FL TO RL) 688mm 742mm
L=1122.7 m L=20.0 m L=1640.4
VERTICAL ALIGNMENT 1 IN 1120 F R=-68135 m 1 IN 1668 m
F
12.792
12.776
12.771
12.768
12.757
12.746
12.734
12.723
12.714
12.715
12.701
12.676
12.668
12.659
12.643
12.632
12.626
12.620
12.611
12.562
12.538
12.536
12.531
12.548
12.632
12.644
TRACK DISTANCE FROM EXISTING NEAREST IR
DN MAIN LINE TO PROPOSED DFC MAIN LINE
+0.824
+0.868
+0.910
+1.058
+1.052
+1.109
+1.290
+1.223
+1.109
+1.124
+1.211
+1.084
+0.808
+0.211
+0.370
+0.862
+1.284
+1.183
+1.122
+1.179
+1.286
+1.250
+1.217
+1.187
+1.102
HEIGHT OF BANKING(+) /
DEPTH OF CUTTING(-) (PFL-GL)
267.023 267.168
266.968 267.147
266.919 267.085
266.847 267.025
266.854 266.859
266.769 266.847
266.631 266.773
266.614 266.574
266.645 266.623
266.652 266.719
266.627 266.686
266.625 266.581
266.661 266.690
266.798 266.949
266.994 267.528
266.773 267.351
266.666 266.841
266.419 266.401
266.421 266.484
266.381 266.527
266.411 266.453
266.279 266.332
266.332 266.356
266.357 266.377
266.370 266.395
266.350 266.468
EXG GROUND LEVEL AT CENTER LINE OF
PRO. DFC TRACK (GL) PROJECT OFFICE / DFCCIL
0.325
0.314
0.292
0.287
0.285
0.289
0.276
0.258
0.239
0.224
0.212
0.178
0.145
0.119
0.129
0.181
0.235
0.287
0.298
0.311
0.327
0.341
0.357
0.385
0.385
CGM/UMB
DIFFERENCE BETWEEN PRO FORMATION
LEVEL AND EXG.FORMATION LEVEL.(PFL-EFL)
0.362 267.652 267.989
DIFFERENCE BETWEEN
PRO. DFC RAIL LEVEL AND EXG. RAIL LEVEL CHANKY GARG ABHINAV SINGH
(PRL - ERL) PM / ELECT. / UMB PM / S&T
268.702
268.684
268.667
268.649
268.631
268.613
268.595
268.577
268.559
268.542
268.524
268.506
268.488
268.470
268.452
268.434
268.416
268.399
268.381
268.363
268.345
268.332
268.320
268.308
268.296
268.284
PRO. DFC RAIL LEVEL (PRL)
268.340
268.334
268.327
268.331
268.318
268.302
268.281
268.276
268.276
268.277
268.274
268.268
268.284
268.300
268.308
268.280
268.210
268.138
268.068
268.039
268.009
267.979
267.953
267.925
267.885
267.873
SURENDRA SINGH S.P.SHARMA DEBASISH NAYAK
EXG.RAIL LEVEL OF NEAREST IR DN MAIN LINE(ERL) DPM / ENGG. I / UMB DPM / ELECT. / UMB APM / S&T-II / UMB
OWNER
DEDICATED FREIGHT CORRIDOR CORPORATION OF INDIA LTD.
296500.0 105584.6
296520.0 105604.6
296540.0 105624.6
296560.0 105644.6
296580.0 105664.6
296600.0 105684.6
296620.0 105704.6
296640.0 105724.6
296660.0 105744.6
296680.0 105764.6
296700.0 105784.6
296720.0 105804.6
296740.0 105824.6
296760.0 105844.6
296780.0 105864.6
296800.0 105884.6
296820.0 105904.6
296840.0 105924.6
296860.0 105944.5
296880.0 105964.5
296900.0 105984.6
296920.0 106004.6
296940.0 106024.6
296960.0 106044.6
296980.0 106064.6
297000.0 106084.6
EQUIVALENT CHAINAGE ON (A GOVERNMENT OF INDIA ENTERPRISE)
PROPOSED DFC TRACK PROJECT OFFICE(AMBALA UNIT): OLD RAILWAY COLONY (NEAR
ANAND MARKET), AMBALA CANTT-133001.
CORPORATE IDENTITY NO. : U60232DL2006GOI155068
PROJECT
EXISTING IR CHAINAGE EASTERN DEDICATED FREIGHT CORRIDOR
SAHNEWAL TO PILKHANI
L - SECTION CONTRACT PACKAGE - 301
SCALE DESIGN CONSULTANT CONTRACTOR ENGINEER CONTRACTOR ENGINEER TITLE DFCC APPR. NO. -
HOR - 1:1000
0 10 20 30 40m ENGG. APPR. NO. -
PLAN & PROFILE
0 1 2 3 4m
FROM IR KM: 296.500 TO 297.000 DRG. NO. - 301-2/AL/1219
FROM DFC KM: 105.585 TO 106.085 REV. No. STATUS
0 22.10.2018 INITIAL SUBMISSION FOR APPROVAL
VER - 1:100 architects engineers & consultants pvt.ltd. GIL - TPL JV DB Engineering & B.RAMAKRISHNA H.B.PANDA DINESH PANDEY BABULAL SAHU H.D.VIDJAK
SHEET NO. : 219 OF 346
REV. DATE REVISION DETAILS PURPOSE OF ISSUE SHEET SIZE : A1 Consulting GmbH DESIGNED CHECKED APPROVED REVIEWED APPROVED DATE : 22.10.2018 0 GFC