SECTOR 23, DWARKA

SUBMITTED BY
KARTHIKEYAN S
NIDISH REDDY
INTRODUCTION VARIOUS ASPECTS OF COSTREDUCTIONS
•OPTIMUM UTILISATION OFLAND
•FUNCTIONALDESIGNOFBUILDINGS
•OPTIMUM USEOFBUILDINGMATERIAALS
•RATIONALIZATION OF SPECIFICATIONS
THECONSTRUCTIONSITEATDWARKASEC23 . •PROPERSCHEDULINGOFWORKS
THEPROJECTIS UNDERDDAOFBUILDING 2300 HOUSING . •NEW CONSTRUCTIONMATERIALSANDTECHNIQUES
THETOTALCOSTHASBEENPEGGEDATRS762.3 CRORESAND THEPROJECTIS
EXPECTEDTOBECOMPLETEDBYOCTOBER2013. FACTORS AFFECTING CHOICE OF MATERIALS
•SUSTAINABLEUSEOFLOCALMATERIAL
ALLHOUSINGCOMPLEXESWILL HAVEAMENITIES LIKE GROCERYSHOPS, •AVAILIBLITY OFSKILLEDLABOUR
PARKS,COMMUNITY CENTRES,CHOWKIDAR HUT, PARKINGSPACESAND •SCALEOFCONSTRUCTION
ANANGANWADI CENTREIN EACHBLOCK. •COSTVARIATION WITH ALTERNATIVE MATERIALS
•AVAILBLITY OF POWER
•DISASTERRESISTANTREQUIREMENTS
•ENVIRONMENTALASPECTS
•TYPOLOGYBASEDON GEOCLIMATICCONDITIONS

SUNPATH

PREVAILING
WINDS

MONSOONAL
WINDS

KEYPLAN
SITE PLAN

SITE PLAN

ZONING
BUILT UP

LANDSCAPE • THEUNITSAREESSENTIALLYTWO-ROOMUNIT
WITH SEPARATEW.CAND BATH CUBICLESAND KITCHEN
WITH A SIT-OUT BALCONY.
BATCH: 2009-14
COMMUNITY HALLAND •TYPOLOGYOFBUILDING BLOCKS-WALKUPUNITS WITH
OTHER FACILITIES FIVE FLOORS.
•TOTALBUILDING HEIGHT-LESSTHAN 15MTS.
WALKWAYS •ONESTAIRCASECATERINGFOURUNITSAT EACHLEVEL
, ANDACCESSTOROOFIS THROUGHM.S. LADDER
WATER
SUPPLY

TANKSPLACEDAT THETERRACEFROM WHICH WATERIS


SUPPLIEDTOTHEINDIVIFUAL UNITS THROUGHTHEPVC
PIPES.

SEMESTER: 7TH

BATCH: 2009-14

INSTITUTE: ASAP
FIRE SERVICES

THEHOSEREELSARECONNECTEDTOTHE
BOREWELLS.
FIREEXTINGUISHERSPRESENTAT THE
ENTRANCEOFTHEBUILDINDS.
NO SPRINKLERS.
NO FIREALARMS
THERSEARENO DG’S PRESENT.
ELECTRICITYCONNECTIONISTHRIUGHTHEMAINS.
STURCTURE

PREFAB BEAMS AND COLUMNS HOLLOW CONCRETE BLOCKS SECTIONALELEVATION


SITE CONSTRUCTION
RAFT FOUNDATION
TECHNIQUES ASSEMBLY OF 3-S BEAMS

COLUMN BEAM JUNCTION PRECAST HOLLOW COLUMNS

CONCRETE BLOCK WALL PRECAST SLAB


SITE CONSTRUCTION TECHNIQUES
PRECAST STAIRCASE FORMATION OF SLAB

ASSEMBLY OF PRECAST FRAME SECTION OF HOLLOW COLUMN

ADVANTAGES:

• SELF-SUPPORTINGREADY-MADE COMPONENTSAREUSED,SOTHENEEDFORFORMWORK, SHUTTERINGAND SCAFFOLDINGIS GREATLYREDUCED.


• CONSTRUCTIONTIME IS REDUCEDAND BUILDINGSARECOMPLETEDSOONER,ALLOWING AN EARLIERRETURNOFTHECAPITALINVESTED.
• ON-SITE CONSTRUCTIONAND CONGESTIONISMINIMIZED.
• QUALITYCONTROLCAN BEEASIERIN A FACTORYASSEMBLYLINE SETTINGTHANA CONSTRUCTIONSITESETTING.
• PREFABRICATIONCANBELOCATEDWHERESKILLED LABOUR IS MORE READILYAVAILABLEAND COSTSOFLABOUR, POWER,MATERIALS, SPACEAND OVERHEADSARELOWER.
• TIME SPENTIN BAD WEATHERORHAZARDOUSENVIRONMENTSATTHECONSTRUCTIONSITEIS MINIMIZED.
• LESSWASTEMAYOCCUR
• ADVANCEDMATERIALS SUCHASSANDWICH-STRUCTUREDCOMPOSITECAN BEEASILYUSED,IMPROVING THERMALAND SOUND INSULATIONANDAIRTIGHTNESS